Engineering:

a) Is a set of rules about developing products

b) Has been around as a discipline since the early 50’s

c) Started as a response to the so-called ‘ Crisis’ of the late 90’s

d) Is an engineering discipline concerned with all the 

aspects of production

e) Is now a mature discipline on par with other established 

engineeringfields

1 Answer

Answer :

d) Is an engineering discipline concerned with all the 

aspects of production

Related questions

Description : Software Engineering is an engineering discipline that is concerned with: (1) how computer systems work. (2) theories and methods that underlie computers and software systems. (3) all ... (4) all aspects of computer-based systems development, including hardware, software and process engineering.

Last Answer : Answer: 3

Description : Which of the following is true about management meetings? Select one: a. They are short meetings to develop a common understanding of what the short-term  priorities are for the project. ... , tracking progress of existing plans, and  making adjustments to plans in response to new information.

Last Answer : e. They are oriented toward developing plans, tracking progress of existing plans, and  making adjustments to plans in response to new information.

Description : Which one of the following categories of persons is not treated at par so far as the availability of Fundamental Rights is concerned? (1) Members of the armed forces (2) Members of ... Members of the forces employed in connection with the communication systems set up for maintenance of public order

Last Answer : a) Members of the armed forces Explanation: Members of Armed Forces are not treated at par so far as the availability of Fundamental Rights is concerned.

Description : Identify, from among the following, the correct statement. a) One of the main challenges Engineering facing today is the requirement of most systems to work with a multitude of  homogenous systems ... of component based assembly, we find  that onlyless than 20% of today's is still custom built

Last Answer : c) does not wear-out in the traditional sense of the term, but  does tend to deteriorate as it evolves

Description : Which model is used during early stages of the system  design afterthe requirements have been established? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : d) An early design model

Description : The Mau Mau were terrorists in which country late 50s early 60s?

Last Answer : Kenya

Description : The Mau Mau were terrorists in which country late 50s early 60s

Last Answer : Kenya

Description : Fill in the blank. During the _________ of a project, the project manager focuses on  developing the project infrastructure needed to execute the project and developing  clarity around the project charter and scope. ... one: a. completion b. start-up c. execution d. evaluation e. selection

Last Answer : b. start-up

Description : Fill in the blank. During the _________ of a project, the project manager  focuses on developing the project infrastructure needed to execute the  project and developing clarity around the project charter and scope. ... one: a. completion b. start-up c. execution d. evaluation e. selection

Last Answer : b. start-up

Description : Where can I create a late 90s, early 2000s online radio?

Last Answer : answer:iTunes Smart Playlists let you specify Year. So you could say greater than 1996 and less than 2005, for example. This would limit you to songs on your computer. There are ways to stream your iTunes library, but I haven’t messed around with those.

Description : Early 90's late night softcore series name?

Last Answer : Red Shoe Diaries?

Description : Does anyone know the name of this toy from the late 90's/early 00's?

Last Answer : I don’t know the name but you can buy it 2 blocks away from my house, swear to god.

Description : I’m searching for a late 90s early 2000 rock song. music video in a morgue and the dead bodies starts to live. And possibly they sang about zoo kind of like "isma isma and the zoo"?

Last Answer : It might be "Hold That Sucker Down" by Jerome Isma-Ae released in 1994.

Description : To crash a schedule you should: 1. Increase the time allowed on those tasks that have float.  2. Try to increase expenditures of time only those tasks that are behind schedule.  3. Replace those ... to par with the busy.  4. Increase work efforts on those tasks that are on the critical path.

Last Answer : 4. Increase work efforts on those tasks that are on the critical path.

Description : For an activity in a CPM analysis, the early Finish time is 13 and the late Finish time  is 13. Duration of activity is 6. Which of the following statements is true?  A.The early start is 6 B. ... of the activity is 13  C.The slack of this activity is 13  D.The activity is on the critical path

Last Answer : D.The activity is on the critical path

Description : Which of the following refers to a management tool for organizing personnel, facilities, equipment, and communication for any emergency situation? a) The Incident Command System The ... emergency preparedness required by the Joint Commission on Accreditation of Healthcare Organizations (JCAHO).

Last Answer : a) The Incident Command System The Incident Command System (ICS) is a management tool for organizing personnel, facilities, equipment and communication for any emergency situation. The federal government mandates ... are used at the level of an individual hospital's emergency response plan as well.

Description : Mature (Urban) Harappan period , Early Harappan period , Post Harappan cultures , Late Harappan period

Last Answer : Write the correct chronological order: (a) Mature (Urban) Harappan period (b) Early Harappan ... Post Harappan cultures (d) Late Harappan period

Description : Vedic Aryans ,Late Harappan period ,Mature Harappan period, Early Harappan period

Last Answer : Write the correct chronological order: (a) Vedic Aryans (b) Late Harappan period (c) Mature Harappan period (d) Early Harappan period

Description : This set of Software Engineering Multiple Choice Questions & Answers (MCQs) focuses on Project  Management . 1. Which of the following is not project management goal? a) Keeping overall ... agreed time c) Maintaining a happy and well-functioning development team d) Avoiding customer complaints

Last Answer : d) Avoiding customer complaints

Description : With which of the following aspects of learning are the teachers and psychologists most directly concerned? Options: A) The products of learning B) The process of learning C) The development of habits D) The avoidance of errors

Last Answer : B) The process of learning 

Description : Complete the following statement. As the project progresses into the  execution phase: Select one: a. risks need to be checked off on activities that have been performed. b. the total risk on ... risk breakdown structure needs to be examined to be sure all the risk events have  been avoided.

Last Answer : a. risks need to be checked off on activities that have been performed.

Description : Determining the policies that are needed for the smooth execution of a project  relates to which of the following agenda items of alignment sessions? Select one: a. Developing a common ... role clarification on projects e. Agreeing on the means and methods for accomplishing the purpose

Last Answer : d. Developing role clarification on projects

Description : What is the most critical aspect in developing a project plan that meets project  specifications within the timeframe and at the lowest costs? Select one: a. Assessing risk management b ... business partners e. Developing a project execution plan that matches the complexity level of the project

Last Answer : e. Developing a project execution plan that matches the complexity level of the project

Description : What is the first step in developing a risk management plan? Select one: a. Analyze the risks. b. Estimate the likelihood of the risks occurring. c. Identify potential project risks. d. Develop a risk mitigation plan. e. Estimate the potential impact of risk on the project goals.

Last Answer : c. Identify potential project risks.

Description : Are there any online engineering schools that offer an education on par with traditional universities?

Last Answer : Online universities are becoming more reputable and are gaining ground and popularity, positioning them to be competitive with traditional colleges and universities. This website offers a good ... to compare: http://www.bestcollegesonline.com/online-colleges-vs-traditional-campus-colleges/

Description : 90s and early 2000s, you’re all grown now. What was your cringe msn messenger nickname?

Last Answer : Le Big Mac

Description : )Quality costs include : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.  2. Only costs classified as prevention, detection and ... rework due to defects, customer returns and warranty costs.  4. The expense of upper management

Last Answer : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.

Description : Mr. Grumper grumbles about bad time-keeping trains like everybody else. On one particular morning he was justified, though. The train left on time for the one hour journey and it arrived 5 minutes late. ... did on the morning journey, was the station clock fast or slow, and by how much? -Riddles

Last Answer : The station clock is 3 minutes fast. The morning journey took 65 minutes, and the evening journey therefore took 52 minutes, and the train arrived 57 minutes after it should have left, that is, 3 minutes early.

Description : Developing a technology is an example of (A) Process (B) Project (C) Scope (D) All of the above

Last Answer : (B) Project

Description : Which one of the following statements best defines teamwork? a. People working collaboratively towards a common goal. b. Developing skills that will enhance project performance. c. Gathering the ... together to work on a project. d. Establishing vision and direction towards a common purpose.

Last Answer : a. People working collaboratively towards a common goal.

Description : Quality planning is the process of developing a quality plan for a) team b) project c) customers d) project manager

Last Answer : b) project

Description : Quality planning is the process of developing a quality plan for a) team b) project c) customers d) project manager

Last Answer : b) project

Description : Various choices of ____ that are available for constructing and developing the project  should be examined.

Last Answer : Ans. Techniques

Description : Quality planning is the process of developing a quality plan for (A) team (B) project (C) customers (D)project manager

Last Answer : (D)project manager

Description : Developing a technology is an example of (A)Process (B)Project (C)Scope (D)All of the above

Last Answer : (B)Project

Description : Which one of the following statements best defines teamwork?  a. People working collaboratively towards a common goal .b. Developing skills that will enhance project performance.  c. Gathering the ... together to work on a project.  d. Establishing vision and direction towards a common purpose

Last Answer : a. People working collaboratively towards a common goal.

Description : When developing a project's scope statement, which of the following should not be  included? 1. Project justification.  2. Cost/benefit analysis  3. Project deliverables  4. Measurable objectives

Last Answer : 1. Project justification.

Description : From HR perspective, the project manager's responsibility in the planning role includes: 1. Hiring the team  2. Developing work schedules 3. Forecasting  4. Feedback sessions  5. Both b and c

Last Answer : 5. Both b and c

Description : Cost controls can be best described by which of the following? 1. The process of developing the future trends along with the assessment of probabilities,  uncertainties, and inflation that  could ... of gathering, accumulating, analyzing, reporting, and managing the costs on  an on-going basis.

Last Answer : 4. The process of gathering, accumulating, analyzing, reporting, and managing the costs on  an on-going basis.

Description : Cost budgeting can be best described by which of the following? 1. The process of developing the future trends along with the assessment of probabilities,  uncertainties, and inflation that  could ... of gathering, accumulating, analyzing, reporting, and managing the costs on an on- going basis

Last Answer : 3. The process of establishing budgets, standards, and a monitoring system by which the  investment cost of the project can be measured and managed

Description : )Which of the following is NOT one of the primary needs for good project scheduling? 1. Cutting costs and reducing time  2. Decreasing the time required for decision making  3. Eliminating idle time  4. Developing better trouble shooting procedures.

Last Answer : 4. Developing better trouble shooting procedures.

Description : Developing a technology is an example of A. Process B. Project C. Scope D. All of the above

Last Answer : B. Project

Description : Projects provide an excellent growth environment for future executives and for developing A. Sales skills B. Manufacturing skills C. Managerial skills D. Execution skills

Last Answer : C. Managerial skills

Description : Which of the following is a quality management system that gives titles to specialists and requires a cost-benefit analysis? Select one: a. Lean accounting b. Business process re-engineering c. Kaizen d. Six Sigma e. Total Quality Management

Last Answer : d. Six Sigma

Description : The aim of engineering is to produce that is a) Fault-free b) Delivered on time c) Delivered within budget d) Satisfies users’ needs e) All of these are the aims of engineering

Last Answer : e) All of these are the aims of engineering