Factors affecting cost estimation

1) Labor Wage Rates

2) Inflation Factor

3) Project Schedule

4) Quality of Plans & Specifications

5) Reputation of Engineer

6) Regulatory Requirements

7) Insurance Requirements

8) Size and Type of Project

9) Location

10) Contingency

Related questions

Description : List the advantages and disadvantages of hydropower. 

Last Answer : Hydropower plant Advantages Renewable - Hydroelectric energy is renewable. This means that we cannot use up. However, there's only a limited number of suitable reservoirs where hydroelectric power ... MW under construction. Only one of these projects was started in the last two years. 

Description : List various types of costs. 

Last Answer : Types of Cost Total Cost Fixed Cost Variable cost Direct cost Indirect Cost

Description : List four environmental benefits of wind energy.

Last Answer : Environmental benefits of Wind Energy 1. Renewable & Sustainable 2. Environmentally Friendly 3. Reduces Fossil Fuel Consumption 4. Small Footprint

Description : Describe the concept of fixed cost, variable cost and total cost.

Last Answer : Total cost  Total cost refers to total expense incurred in reaching a particular level of output, if such total cost is divided by quantity produced average or unit cost is obtained. The ... . Direct material, direct labour, direct expenses, variable overheads are some examples of variable cost.

Description : Classify energy sources with two examples each.

Last Answer : Types of energy Source  Primary energy source is an energy form found in nature that has not been subjected to any conversion or transformation process. The primary energy sources are derived from: the sun, ... energy sources: These sources can renew again and again. e.g Solar, Wind, Biomass, Hydro

Description : State two objectives of energy audit.

Last Answer : Objective of energy audit  To determine ways to reduce energy consumption per unit of product output or to lower operating costs. Energy Audit provides a bench-mark" (Reference ... effective use of energy throughout the organization. Provide detailed documentation for monitoring of energy use

Description : State any two units of energy.

Last Answer : Units of energy: Joule Calorie Kilowatt Kilowatt-hour Watt

Description : Outline the process of accounting.

Last Answer : Process of accounting An accounting system tracks and controls the income and expenses of a business. Accounting systems can be as simple as a pen and notepad, and can be as complex ... find themselves required to create reports for external stakeholders, such as lenders and private investors. 

Description : Explain law of demand and law of supply.

Last Answer : The Law of Demand The law of demand states that, if all other factors remain equal, the higher the price of a good, the less people will demand that good. In other words, the higher the price, the lower ... ). At point B, the quantity supplied will be Q2 and the price will be P2, and so on.

Description : Explain the procedure of detailed energy audit.

Last Answer : Detailed Energy Audit Detailed audit provides a detailed project implementation plan for a facility, since it evaluate all major energy using systems. This type of audit offers the ... Management aspects of design and operating data collection, field measurements, data analysis, and training

Description : Outline any four duties and responsibilities of energy manager.

Last Answer : Responsibilities and Duties of Energy Manager Responsibilities Prepare an annual activity plan and present to management concerning financially attractive investments to reduce energy costs Establish an ... and manner as may be provided in the regulations of the Energy Conservation Act.

Description : Illustrate the benefits of hydrogen energy as a future energy.

Last Answer : Benefits of Hydrogen Energy The use of hydrogen greatly reduces pollution. When hydrogen is combined with oxygen in a fuel cell, energy in the form of electricity is produced. This electricity can ... sources of fuel. This ideally means that you need less hydrogen to complete an enormous task.

Description : Explain any four important properties of petroleum fuel.

Last Answer : Properties of petroleum fuel The flash point of a volatile fuel is the lowest temperature at which it can vaporize to form an ignitable mixture in air. The flash point is an important concept in ... of combustion contain the water vapor and that the heat in the water vapor is not recovered.

Description : State various types of energy losses with their control measures in any utility.

Last Answer : Energy loss and control in any utility Energy saving opportunities in cooling tower (These measures will save electrical energy used in fan or pumps) 1. Follow manufacturer's recommended ... Preheating combustion air 10. Switching from steam to air atomization Switching to lower cost fuel

Description : Explain construction and working of solar water heater.

Last Answer : Solar Water Heater  Construction A typical domestic solar water heater consists of a hot water storage tank and one or more flat plate collectors. Inlet and outlet pipes are connected ... the tank continues automatically due to density difference between hot and cold water (thermosyphon effect).

Description : Define calorific value. Differentiate between net calorific value and gross calorific value.

Last Answer : Calorific value of fuel  The amount of energy produced by the complete combustion of a material or fuel.  Measured in units of energy per amount of material, e.g. kJ/kg. Difference between NCV and GCV ... is not an actual heat available for use. It is an actual heat available for use.

Description : Describe profitability evaluation by rate of return on investment. 

Last Answer : Profitability by ROI Return on investment, or ROI, is the most common profitability ratio. There are several ways to determine ROI, but the most frequently used method is to divide net profit by total ... investment types. Return on investment = (revenue − cost of goods sold) / cost of goods sold

Description : Explain energy conservation and its importance.

Last Answer : Energy conservation Energy Conservation is the deliberate practice or an attempt to save electricity, fuel oil or gas or any other combustible material, to be able to put to additional use for ... are produced. e) Generally to relieve shortage and improve development. f) Advantage in PAT scheme.

Description : Explain construction of biogas plant.

Last Answer : Fixed Roof Biogas Plant  Construction It consits of inlet tank, digester and outlet tank. Sluury is prepeared in inlet tank. Mass is digeated in digester. Gas is collected at the top dome. Digested mass ... digester gas can supply useful energy in the form of hot air, hot water or steam.

Description : Define balance sheet.

Last Answer : Balance sheet  It is a statement of the assets, liabilities, and capital of a business or other organization at a particular point in time, detailing the balance of income and expenditure over the preceding period.

Description : State the use of Lux Meter and Tachometer in energy audit.

Last Answer : Use of lux meter – to measure intensity of light Use of tachometer – to measure speed

Description : State the difference between energy conservation and energy audit. 

Last Answer : energy conservation Energy audit It is reducing the growth of energy consumption by avoiding unnecessary usage of energy It is an inspection, survey & analysis of energy flows ... Various measuring instruments, with proper sensing elements are required for the energy audit. 

Description : Problems on electrical power and energy

Last Answer : Problem on electrical power and energy 1 : https://youtu.be/ZvWHuMdmv9g Problem on electrical power and energy 2 : https://youtu.be/19IZMc6U2vs Problem on electrical power and energy 3 : https ... : https://youtu.be/iYqGIwA919A Problem on electrical power and energy : https://youtu.be/iWnWQz_mzHk

Description : Problem on electrical power and energy 2

Last Answer : Problem on electrical power and energy 2

Description : Problem on electrical power and energy 1

Last Answer : Problem on electrical power and energy 1

Description : Problem on electrical power and energy 7

Last Answer : Problem on electrical power and energy 7

Description : Problem on electrical power and energy 6

Last Answer : Problem on electrical power and energy 6

Description : Problem on electrical power and energy 5

Last Answer : Problem on electrical power and energy 5

Description : In time-cost optimization of a project, crashing is done. (A) On all the activities (B) On all the activities lying on the critical path (C) Only on activities lying on the ... critical activities and those that become critical at any stage of crashing in the order of ascending cost slope

Last Answer : D

Description : Factors affecting cost estimation

Last Answer : Factors affecting cost estimation 1) Labor Wage Rates 2) Inflation Factor 3) Project Schedule 4) Quality of Plans & Specifications 5) Reputation of Engineer 6) Regulatory Requirements 7) Insurance Requirements 8) Size and Type of Project 9) Location 10) Contingency

Description : Which of the following is not a greenhouse gas ? a) CFCs b) SO2 c) PFC d) SF6

Last Answer : b) SO2

Description : If I drink two energy drinks a day (generally sugar-free redbull), what is the absolute latest I could drink the second one before it would start affecting my sleep?

Last Answer : i would just stay away from that junk really

Description : State the factors to be considered while selecting refrigerants. 

Last Answer : Selection criteria for refrigerant : 1. Working pressure range and pressure ratio. The pressure required to be maintained in the evaporator and condenser should be low enough to reduce the material ... . It should have moderate density in liquid form, a relatively high density in gaseous form.

Description : Classify boilers according to various factors. 

Last Answer : Classifications of boilers 1.Use a. stationary b. mobile 2. Tube contents a. fire tube boiler b. water tube boiler 3. Tube shape and position a. Tube shape (Form) -i. Straight ii. ... . forced circulation 6. Heat source a. Fuel b. hot wastergaes c. electrical energy d. nuclear energy 

Description : State any four factors for selection of hydro power plant site. 

Last Answer : Following Factors to be kept while site selecting for Hydro power plant: 1) Quantity of water available :-Where high rainfall occures so that sufficent quantity of water can be stored for generation of ... be possible to divert the stream. 11. Sand, gravel, etc., should be available nearby.

Description : State any four factors for selection of site of wind power plant.

Last Answer : The Factors for selection of site for Wind Mills: 1) The site should be selected where winds are strong i.e. where pressure of wind is high and there is continuity (14.4- 16.2 km/h) ... 50m of the turbine which can affect the system's overall performance 10)Possibility to connect to power grid. 

Description : State any four factors for selecting location of nuclear power plant.

Last Answer : i) Seismicity: If the area of a nuclear site is seismically active, it may not be used for nuclear power plant.  ii) Water Availability: The nuclear power plants would need a ... Therefore, the site selected for such plant should have adequate arrangement for the disposal of radioactive waste.

Description : List the methods for scale and sludge removal.

Last Answer : Methods of scale and sludge removal: With the help of scrapper, knife ,blades or piece of wood or by wire brushing, if the scale is loosely adhering. By giving thermal shocks. By ... suddenly cooling with cold water. By dissolving them in some chemicals. By frequent blow-down operation.

Description : List out uses of air in industry.

Last Answer : Uses of air in industry: i) To clean work shop ,generators and machine. ii) For cooling of furnace. iii) Compressed air used in oxidation of acetaldehyde to acetic acid in liquid phase reactor. iv) ... To exhaust the fumes of HCl gas, by exhaust blower. vi) fan air used in solid fuel boiler.

Description : List out types of thermic fluid.

Last Answer : Different thermic fluids 1. Dowtherm A 2. Dowtherm E 3. Therminol FR 4. Oil mobiltherm 600 5. Oil Mobiltherm light 6. Hydrotherm 750-200

Description : List the types of turbine used in hydro power plant.  

Last Answer : Following types of turbine used in hydro power plant:  1.Pelton wheel 2.Francis Turbine 3.Kaplan Turbine 4.Propeller Turbine 

Description : List out the four applications of diesel electric power plant.

Last Answer : Applications of Diesel Power Plant: 1. It can be used as a standby (emergency) power plant to maintain continuity of supply. (Incase failure of main supply like hospital, Telephone exchange Radio stations, ... 10. Diesel plants are widely used for generating power ranging from 100 to 5,000 H.P.

Description : The capital cost of a power plant depends on  (1) Total installed capacity only. (2) Total number of units only. (3) Total installed capacity and number of units as well. (4) Neither the installed capacity nor number of units

Last Answer : The capital cost of a power plant depends on Total installed capacity and number of units as well.

Description : n project financing ,sensitivity analysis is applied because a) almost all the cash flow methods involve uncertainty b) of the need to assess how sensitive the project to changes in input parameters c) what if one or more factors are different from what is predicted d) all the above situation

Last Answer : d) all the above situation

Description : Write an algorithm to subtract two 16 bit numbers (With borrow) in 8086 microprocessor.

Last Answer : Algorithm for 16 bit numbers subtraction with borrow: 1. Load 0000H into CX register (for borrow) 2. Load the first number into AX(accumulator) 3. Load the second number into BX register 4. Subtract ... . Move data from AX(accumulator) to memory 8. Move data from CX register to memory 9. Stop

Description : Nodal Analysis with Voltage Sources dependent voltage source and two supernode

Last Answer : Nodal Analysis with Voltage Sources dependent voltage source and two supernode

Description : Name two good conductors, two good insulators, and two semiconductors.

Last Answer : In general all metals are good conductors, with silver the best and copper second.

Description : Define memory segmentation. How memory segmentation is achieved in 8086? State advantages of memory segmentation.

Last Answer : Memory Segmentation: The memory in an 8086 microprocessor is organized as a segmented memory. The physical memory is divided into 4 segments namely, - Data segment, Code Segment, Stack Segment and Extra ... 16 bit size. 6) Programs and data can be stored separately from each other in segmentation.

Description : Enlist the features of 8085 microprocessor.

Last Answer : Features of 8085 microprocessor: 1. 16 address line so 216=64 Kbytes of memory can be addressed. 2. Operating clock frequency is 3MHz and minimum clock  frequency is 500 KHz. 3. On chip bus ... cycle TTL clock 10. Provide 2 serial I/O lines, so peripheral can be interfaced with  8085 μp

Description : Describe the functions of stack pointer and program counter of 8085. 

Last Answer : Stack pointer: 1. It is a 16 bit register which is used to store the address of topmost filled memory location of stack memory. 2. SP always points current top of stack. 3. If data is ... of memory and in 8085 the address of memory is 16 bit. Hence program counter is 16 bit register.