Is The variance is the mean of the sum of the squared deviation between each observation and the median?

1 Answer

Answer :

Feel Free to Answer

Related questions

Description : The square of standard deviation is (A) Coefficient of variance (B) Standard deviation (C)Variance (D) Mean deviation

Last Answer : (C)Variance

Description : Which measures the systematic or non -systematic risk of a security ? a. Beta c. standard deviation b. Variance d. Range

Last Answer : Answer :a

Description : The average of the sum of squares of the deviation about mean

Last Answer : Ans. Variance

Description : The sum of 20 observation is 500, then the mean is ______.

Last Answer : The sum of 20 observation is 500, then the mean is ______. A. 15 B. 20 C. 25 D. 30

Description : Prove that sum of any two sides of a triangle is greater than twice the median with respect to the third side -Maths 9th

Last Answer : Solution :-

Description : Sum of deviation of items from the A.M. is

Last Answer : Ans. 0

Description : Define sum of squared errors.

Last Answer : The difference between the actual value yj and the predicated value ( θ1 xj + θ2 ) so E is the sum of squared errors. 

Description : One method of troubleshooting digital circuits in a console is to ___________. A. supply alternate logic levels at the input(s) and test for change of state conditions at the output B. ground all ... output D. vary each input smoothly from 0-10 volts and test for similar variance at the output

Last Answer : Answer: A

Description : How to compute mean and standard deviation for each column of a pandas dataframe -Web-Development

Last Answer : answer:

Description : The mean of 8 observations is 40. If 5 is added to each observation, then what will be the new mean ? -Maths 9th

Last Answer : Let the 8 observations are x1, x2, x3, x4, x5, x6, x7, x8 ∴ x1 + x2 + x3 + x4 + x5 + x6 + x7 + x8 = 40 × 8 = 320 New mean = 320 + 5 × 8 = 360 / 8 = 45

Description : The mean of 8 observations is 40. If 5 is added to each observation, then what will be the new mean ? -Maths 9th

Last Answer : Let the 8 observations are x1, x2, x3, x4, x5, x6, x7, x8 ∴ x1 + x2 + x3 + x4 + x5 + x6 + x7 + x8 = 40 × 8 = 320 New mean = 320 + 5 × 8 = 360 / 8 = 45

Description : If each observation of the data is increased by 5, then their mean -Maths 9th

Last Answer : NEED ANSWER

Description : If each observation of the data is increased by 5, then their mean -Maths 9th

Last Answer : Simplify the question

Description : Which transformation is applied when mean a variance

Last Answer : Ans. Square root

Description : The distribution in which Mean = Variance

Last Answer : Ans. Poison distribution

Description : The distribution in which Mean > Variance

Last Answer : Ans. Bionomial distribution

Description : Test between two population variance is done by (A) F – test (B) Z test (C) t – test (D) Arithmetic mean

Last Answer : (A) F – test

Description : What two-digit numbers are each equal to their right-most digit squared? -Riddles

Last Answer : 25 = 5² and 36 = 6².

Description : Pick up the correct statement from the following: (A) An observation or the resulting reading with the level on a levelling staff is called sight (B) A back sight is the first sight taken after setting up ... position (C) The first sight on each change point is a fore sight (D) All the above

Last Answer : (D) All the above

Description : Are there any cases where an average value can be maximized only at the cost of increasing variance?

Last Answer : answer:Are you looking for real world examples? Assuming so You would probably like your income from work to be as high as possible, and would like to keep the value above a certain level where you ... does, since it's a much simpler set of rules if you can identify the likelihood of winning.

Description : Do women have wider variance in the people they find attractive then men do?

Last Answer : I’ve been attracted to, or at least found attractive just about every size and shape.

Description : Why are your nose and chin always at variance? -Riddles

Last Answer : Because words are passing between them.

Description : Fill in the blank with appropriate numpy method to calculate and print the variance of an array. -Technology

Last Answer : print(np.var(data,ddof=0))

Description : If a sample of 132 customers were taken from a population of 2340 customers s2 could refer to the variance of how many of the customers' ages?

Last Answer : Feel Free to Answer

Description : How many no. of error variance are applied in Strip Plot Design

Last Answer : Ans. 3

Description : To test the proportions and variance, we use

Last Answer : Ans. ‘F’ test

Description : MD, SD and Variance are

Last Answer : Ans. Measures of Disperson/Spread

Description : The basic operating principle of a transformer is attributed to ______________. A. electromagnetic induction B. variance of a conductor in a magnetic field C. mutual reaction D. thermionic emission

Last Answer : Answer: A

Description : Which one of the following does project change control primarily seek to ensure? a. All variance to the project scope is evaluated. b. No reduction in the perceived quality of the project outcome. ... project do not increase. d. Any decrease in the scoped deliverable of the project is rejected.

Last Answer : a. All variance to the project scope is evaluated.

Description : . If the Earned Value is equal to Actual Cost, it means: A. Project is on budget and on schedule B. Schedule Variance Index is 1 C. There is no schedule variance D. There is no cost variance

Last Answer : D. There is no cost variance

Description : A Project with a total funding of $100,000 finished with a BAC value of $95,000. What term can BEST describe the difference of $5,000? A. Cost Variance B. Management Overhead C. Management Contingency Reserve D. Schedule Variance

Last Answer : C. Management Contingency Reserve

Description : Petri is working for Nokia in Finland. He has completed 10 months of his 12-month project, budgeted at $800,000. His earned value analysis shows that variance at  completion is $75,000. What is the estimate at completion value ... : a. 725,000 b. -725,000 c. -$875,000 d. $875,000 e. $800,000

Last Answer : d. $875,000

Description : Which of the following represents the estimated value of the work actually  accomplished?  A. Earned value (EV)  B. Planned value (PV)  C. Actual cost (AC  D. Cost variance (CV)

Last Answer : A. Earned value (EV)

Description : . If the Earned Value is equal to Actual Cost, it means: A. Project is on budget and on schedule B. Schedule Variance Index is 1 C. There is no schedule variance D. There is no cost variance

Last Answer : D. There is no cost variance

Description : A Project with a total funding of $100,000 finished with a BAC value of $95,000. What term  can BEST describe the difference of $5,000? A. Cost Variance B. Management Overhead C. Management Contingency Reserve D. Schedule Variance

Last Answer : C. Management Contingency Reserve

Description : Which one of the following does project change control primarily seek to ensure?  a. All variance to the project scope is evaluated.  b. No reduction in the perceived quality of the project outcome ... project do not increase.  d. Any decrease in the scoped deliverable of the project is rejected

Last Answer : a. All variance to the project scope is evaluated.

Description : The BCWS = $250, the ACWP = $350, and the BCWP = $200. Calculate the Cost Variance. 1. -$150  2. $150  3. -$50  4. $50

Last Answer : 1. -$150

Description : Cost Variance (CV) is which of the following equations? 1. CV = BCWP - BCWS  2. CV = BCWP - ACWP  3. CV = SV / BCWS  4. A and c

Last Answer : 2. CV = BCWP - ACWP

Description :  A time-phased budget that project managers use to measure and monitor cost performance. A. Cost Baseline B. Cost Budgeting C. Cost Estimating D. Cost Variance

Last Answer : A. Cost Baseline

Description : If the Earned Value is equal to Actual Cost, it means: A. Project is on budget and on schedule B. Schedule Variance Index is 1 C. There is no schedule variance D. There is no cost variance

Last Answer : D. There is no cost variance

Description : Price movement between two Information Technology stocks would generally have a  co-variance. A. zero B. positive C. negative

Last Answer : B. positive

Description : The response curve for a step input signal from a reactor is called C￾curve. The variance of C-curve in a 'tanks in series model' comprising of 'm' tanks is equal to (A) m (B) 1/m (C) √m (D) m2

Last Answer : (B) 1/m

Description : Pick up the correct statement from the following: (A) The horizontal angle between magnetic meridian and true meridian at a place is called magnetic declination or variance of the compass (B) The ... lines through places at which the declination is zero are termedagonic lines (D) All the above

Last Answer : (D) All the above

Description : If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time and variance are respectively (A) 3.5 and 5/6 (B) 5 and 25/36 (C) 3.5 and 25/36 (D) 4 and 5/6

Last Answer : (C) 3.5 and 25/36

Description : What Is Effort Variance?

Last Answer : Effort Variance = (Actual effort – Estimated Effort) / Estimated Effort.

Description : .Test the following system for time in variance.

Last Answer : y(n)=n x2(n) The response y(n) to delayed excitation is, y(n-k)=n x2(n- k )…………..(1) The delayed response is, y(n- k)=(n- k) x2(n- k)……..(2) Eqn. (1) is not equal to Eqn. (2). Hence the given system is time varying.

Description : What is effort variance?

Last Answer : It is the difference in estimated effort and the effort actually needed. Work performance is monitored periodically to find if there is any variance in efforts so that corrective actions could be taken.

Description : Which of the following would explain an adverse variable production overhead efficiency variance? 1. Employees were of a lower skill level than specified in the standard 2. Unexpected idle time resulted from a series of machine breakdown 3. ... b) (1) and (2) (c) (2) and (3) (d) (1) and (3)

Last Answer : (d) (1) and (3)

Description : During September, 300 labour hours were worked for a total cost of Rs 4800. The variable  overhead expenditure variance was Rs 600 (A). Overheads are assumed to be related to direct labour  hours of active working. What was the standard cost per labour hour? (a) Rs 14 (b) Rs 16.50 (c) Rs 17.50

Last Answer : (a) Rs 14

Description : . Which of the following is not a reason for an idle time variance? (a) Wage rate increase (b) Machine breakdown (c) Illness or injury to worker (d) Non- availability of material

Last Answer : (a) Wage rate increase