State any four precautions to be taken while selecting stations for chain surveying.

1 Answer

Answer :

Following are the precautions to be taken while selecting station for chain surveying.

1) As far as possible the survey work should be based upon the basic principle of surveying i.e. working from whole to the part.

2) Number of stations shall be minimum.

3) Main station should be inter visible.

4) Survey lines if possible should run through a level ground.

5) If possible a long line should be run roughly through the middle of area.

6) The stations should be so selected that the obstacles in chaining and ranging should be avoided.

7) The stations should be so the area should be divided into well-conditioned triangles.

8) Stations are selected on firm and level ground.

9) The survey lines should run as far as possible nearer to object.


Related questions

Description : What consideration would you have while selecting survey stations and survey lines in a chain survey?

Last Answer : Following points to be considered while selecting survey stations and survey lines 1) Main survey station should be mutually visible. 2) All triangles should be well conditioned. 3) The survey line should lie ... of the area so as to form the frame work of triangles on it to cover maximum area. 

Description : State the points to be considered while selecting survey stations.

Last Answer : Points to be considered while selecting survey stations. 1. Stations shall be inter visible. 2. Stations shall be so selected that well conditional triangles should be formed. 3. Stations shall be ... they run as close to details to be established as possible and only short offsets are needed.

Description : Explain principle of chain surveying 

Last Answer : 1) Principle of chain surveying is triangulation 2) Triangulation consists of frame work of triangles. The whole area is divided into network of triangles. 3) A triangle is the only simple plane ... to be adopted depends upon the shape & configuration of the ground & the natural obstacles. 

Description : State any four classification of surveying based on instrument uesd. 

Last Answer : i) Chain survey ii) Plane table survey iii) Theodolite survey, iv) Tachometric survey v) compass survey vi) photographic survey, vii) Aerial survey 

Description : Enlist the sources of error in chaining and state the precautions to be taken against error.

Last Answer : In general, the distance measurement obtained in the field will be in error. Errors in the distance measurement can arise from a number of sources: 1. Instrument errors: A chain may be faulty due to a defect ... confuse 10 m tag with 20 m tag. It should be avoided by noticing the 15 m tag.

Description : Write-four uses of surveying.

Last Answer : Uses of surveying are: 1) Surveying is useful to plot ground details in various maps like topographic and cadastral maps. 2) It is useful in navigational movement planning through military survey. ... beneficial in collecting details of water bodies on earth like lake, pond, river, sea etc.

Description : State the two uses of survey based on geodetic surveying

Last Answer : Two uses of survey based on geodetic surveying:- i) To determine the precise position s on the surface of the earth. ii) Preparation of maps of large area like map of a country, state ... ) Establishment of GTS bench Marks across the country. iv) Preparation of military maps for defense purposes.

Description : Define surveying & state its objectives

Last Answer : Surveying- It is branch of civil engineering in which relative positions of ground points are determined by taking linear and angular measurement. Objectives: 1. To determine the relative positions of ... quantities 4. To prepare a topographical map showing details of hills, valleys and rivers.

Description : State any two uses of Plane Surveying. 

Last Answer : 1) Plane surveying is used for measuring small distance. 2) When area is less than 260 km2, plane survey is normally done. 3) When desired accuracy is less, plane survey is done.

Description : State the use of alidade in plane table surveying

Last Answer : 1) It is used for sighting the objects to be located.  2) It is used for drawing the rays. 

Description : State the limitations of plane table surveying.

Last Answer : 1) It is not suitable for work in wet climate 2) Several accessories are required to be carried hence possibility lost. 3) Replotting of survey work to different scale is difficult in absence of ... ) It is not intended for accurate work. 6) The plane table is essentially a tropical instrument.

Description : State the principles of surveying. 

Last Answer : Main principles of surveying are: 1) To work from whole to part. 2) To locate a point at least by two independent processes

Description : The process of surveying is therefore in three stages namely:

Last Answer : (i) Taking a general view This part of the definition is important as it indicates the need to obtain an overall picture of what is required before any type of survey work is undertaken. In ... of quantities, datasheets, drawings and in land surveying maps and plan showing the features on the land.

Description : Tacheometric Surveying

Last Answer : Tacheometric is a branch of surveying in which horizontal and vertical distances are determined by taking angular observation with an instrument known as a tachometer. Tacheometric surveying is adopted in rough ... be prepared for investigation works within a short time on the basis of such survey.

Description : Draw sketch and explain method of traversing of plane table surveying. 

Last Answer : Procedure: 1.Set plane table over station A use plumbing fork for transferring station point from ground on sheet. Draw the direction of magnetic meridian with the help of compass. 2. With the ... scale Similarly, the table can be set at other successive station and traverse is completed.

Description : Describe back sighting method of orientation of plane table surveying.

Last Answer : Backsight method of orientation 1. Assume we have to orient the table at next station B' represented on paper by point b'. 2.the line ba' is drawn on previous station A'. 3.the alidade is kept ... A'. 4. When the plotted line ab' coincides with line AB' and table will be oriented.

Description : Define surveying.

Last Answer : Surveying- It is branch of civil engineering in which relative positions of ground points are determined by taking linear and angular measurement.

Description : Explain ‘Intersection Method’ of plane table surveying with neat sketch. Also give situation when intersection method is used.

Last Answer : 1. Lay out a base line AB and measure it and Plot a distance ab' on sheet using any scale. 2.Set up instrument at A' with a' over A' 3.Orient the table by placing alidade ... the case of the survey of mountainous country. 5. The only linear measurement required is that of a base line.

Description : Enlist different errors in compass surveying.

Last Answer : Various errors in compass surveying are classified asi) Instrumental errors. ii) Personal errors or observational errors iii) Errors caused due to external errors (natural errors) i) ... magnetic declination. c) Local attraction due to proximity of magnetic substances or magnetic field.

Description : Describe in brief resection method of plane table surveying.

Last Answer : This method is used for establishing the instrument stations only. After fixing the stations, details are located either by radiation or intersection. The characteristic feature of resection is that the point ... of resection are (1)The Two Point Problem, and (2)Three Point Problem.

Description : Describe in brief primary classification of surveying

Last Answer : Primary Classification Geodetic Survey The geodetic surveying is that type of surveying which takes into account the curvature of earth's surface. It is generally adopted for large area (more than ... large scale such as Bridges, Dams, Location and Construction of canals, highways, railways etc.

Description : State the procedure to find the foot of the perpendicular on the chain line to take the offset. 

Last Answer : Ans: By cross staff 1. The cross staff is held vertically on the chain line where the offset is likely to occur. It is turned until one pair of opposite slits is directed to the ranging rod ( say ... the ranging rod at B. 3. The point P1 vertically under the instruments is required point. 

Description : State the uses of following instruments in survey: i)Cross staff ii) Chain iii) Pegs iv) Arrows

Last Answer : i) Cross-Staff: To set up perpendicular or right angle to given chain line OR to find foot of perpendicular from given object to a chain line. ii) Chain: Chains are used for measuring distances. iii) ... on survey lines. iv) Arrows : They are used to mark the end of each chain during chaining. 

Description : State the situations under which chain survey is most suitable

Last Answer : Situations under which chain survey is most suitable 1) It is suitable for moderately small areas 2) When the ground is fairly level with simple details ( free from obstructions such as trees, building, poles etc ) 

Description : Draw a "well labelled diagram of 30 m metric chain & state the function of swivel joint & oval rings.

Last Answer : Swivel joint: To turn the handle without twisting the chain. Oval ring: To provide flexibility and fold the chain.

Description : A 20m chain was found to be 6cm too long after chaining a distance of 1059m. It was found to be 9cm too short after chaining at the end 1985m. If the chain was correct before commencement of work find the true distance.

Last Answer : Given : Line ABC, AB=1059m, AC=1985m  L= 20m, No error at start, 0.06m too long at B,  0.09m too short  Find : True distance of AC = ? Solution : For part AB L = Length of chain= 20 m e = Average ... Total true distance of AC = True distance of (AB + BC)  = 1060.59 m + 922.52 m  = 1983.11 m

Description : Describe method of measuring distances on ground using chain and arrows.

Last Answer : Method of measuring distances on ground. 1. Mark the position of survey stations whose distance is to be measured using wooden peg. (say A and B) 2. now, ranging is done if distance ... station B. Thus total horizontal distance will be equal to addition of distances measured of each parts.

Description : Draw a neat labeled sketch of 30m chain.

Last Answer : neat labeled sketch of 30m chain

Description : Explain Procedure for chain and compass traversing.

Last Answer : Chain and compass traversing : 1) Reconnaissance of the area to be surveyed is done. 2) Traverse stations are fixed. 3) The F.B and B.B of the traverse are measured by prismatic compass and ... occur when the traverse is plotted. 6) This error is adjusted graphically by using Bowditch Rule'. 

Description : The length of line measured by 20 m chain was found to be 751 m. The chain was tested before start of measurement and was found correct. The chain was again tested after measurement and was found 6 cm too short. What shall be the correct length of line ?

Last Answer : Given Data: Standard length of chain (L)= 20m Measured Length (M.L.) = 751 m Error before start of measurement = 0.0 Error after measurement = 6 cm = 0.06 m To Find: Actual length or Correct length Solution: ... (L'/L)  = (751) x (19.97/20)  = 749.87 Correct length of line is 749.87 m

Description : Draw the sketch of chain triangulation and label different lines.

Last Answer : AB – Base line AC, CD, DE, AE, EB - main survey lines DD’ – Check line. ab – Tie line.

Description : A 20 m chain was found to be 10 cm too short after chaining 1000 m It was found to be 20 cm too short after chaining 1800 m. If the chain was correct before commencement of the work find the true distance.  

Last Answer : Average error in chain for 1000 m length = (0 + 10) / 2 = 5 cm = 0.05 m too short True length up to 1000 m = (20 - 0.05) x 1000 / 20 = 997.5 m. Average error in chain from 1000 m to 1800 m length = (10 ... 1800 m length = (20 - 0.15) x 800 / 20 = 794.0 m. True distance = 997.5 + 794 = 1791.5 m.

Description : Enlist the factors affecting on selection of survey station or survey line in chain survey.

Last Answer : Following are the factors affecting on selection of survey station for chain surveying. 1) As far as possible the survey work should be based upon the basic principle of surveying i.e. working from whole ... level ground. 9) The survey lines should run as far as possible nearer to object.

Description : The length of line measured with a chain was found to be 250m. Calculate the true length of line if i) The length was measured with 30 m chain and the chain was 10cm too long and ii) The length of chain was 30 m in the beginning and 30.10 m at the end of the work. 

Last Answer : Given Data: L = 30 m Measured Length = 250 m Solution: Case i) The length was measured with 30 m chain and the chain was 10cm too long L' = 30 + 0.1 = 30.1 m Correct Distance = (L'/L) x Measured Length ... = 30.05 m Correct Distance = (L'/L) x Measured Length  = (30.05/30) x 250  = 250.42 m

Description : State the meaning of local attraction and state its effect on prismatic compass and how it taken care of. 

Last Answer : Local attraction: It is the deviation or deflection of magnetic needle from its normal position under influence of external magnetic forces is called as local attraction.  Effect on prismatic compass: ... compass. 3) If local attraction still persists, it is corrected by mathematical calculation. 

Description : What are offsets? How are they taken and recorded? Explain with sketch.

Last Answer : Offsets are lateral measurement to the base line. They are Located by judgment if short And by instruments (optical square or cross staff) if long and measured by metallic tape and shown with their chainages on base line

Description : State any four precautions to be taken while plastering.

Last Answer : i. Before application of the plastering, the surface must be clean and free of dirt, oil, or other elements which may interfere with bonding. ii. Smooth or non-absorbent surfaces should be prepared. iii. ... or vertical line at the end of the day or if work requires to be suspended for any reason.

Description : State any four precautions to be taken while marking layout on ground.

Last Answer : The necessary precaution to be taken while marking layout on ground are as follows 1. All vertical wooden post should be firmly fixed into the ground with concrete and curing should be done to the ... the face line or center line correctly. 19. Use proper or correct plumb bob for centering. 

Description : State any four precautions to be taken while using an Ammeter and Voltmeter. 

Last Answer : Precautions to be taken while using Ammeters: Ammeters are to be connected in series of circuits. 1. While connecting ammeters across emf source always a series resistance should be used. This ... first &then range should be decreased. 4. Loading effect can be minimized by using high sensitivity

Description : State the important points kept in mind while recording the staff readings in level pages with respect first reading, intermediate reading, last reading, change point, carry forward from one page to next page-Remark

Last Answer : 1) First reading is on bench mark point and should be noted in back sight(BS) column 2) Intermediate reading (IS) should be taken on the points between first and last station. 3) Last reading ... column of next page 6) Remark column should have denote First and Last RL along with change points.

Description : State the important point to be remembered while doing profile leveling.

Last Answer : 1. The chainage of staff stations are continuous from beginning to the end of the section line. 2. Readings of B.S. and F.S. should be taken very accurately with the bubble exactly in ... their width or by offset. 5)All the temporary adjustments at all instrument position shall carefully be done. 

Description : State the important points kept in mind while recording the readings in level pages with respect first reading, intermediate readings, last reading, and change point, carry forward from one page to next page - Remarks. 

Last Answer : The following points should be kept in mind while recording the reading in level pages. 1. The first reading should be always noted as back sight (B.S.) 2. All the intermediate readings should ... horizontal line represents only one station. 8. Readings of each station should be in one line only.

Description : State four instruments used for setting offsets.

Last Answer : i) Instruments used for setting offsets: 1)Chain 2)Tape 3) Open & French Cross Staff 4) Circular & Indian Optical Square  ii) Principle of optical square: The angle between the first incident ray and the last reflected ray is twice to that of angle between two mirrors in optical square.

Description : State any four sources of errors in compass survey 

Last Answer : Following are the sources of errors in compass survey1. Instrumental survey-  a. Needle may not be perfectly straight and might not be balanced properly over the station.  b. Graduations of the rings ... substances near the station.  b. Magnetic field may vary on account of some natural causes. 

Description : State any four types of offsets and define them. 

Last Answer : i) Long offset: If length of offset more than 15 m. ii) Short offset: If length of offset less than 15 m. iii) Perpendicular offset: Offset taken perpendicular to chain line. iv) Oblique offset: Offset not taken perpendicular to chain line.

Description : State any four codes of signals in ranging with their meaning. 

Last Answer : In guiding the assistant into line, the surveyor should use following code of signals. Sr. No. Signal by the Surveyor  Action by the Assistant  1 Rapid sweeps i.e. up and down ... . 10 Both arms extended forward horizontally and then depressed. Fix the ranging rod.

Description : State four advantages of auto level.

Last Answer : Advantages of auto level: 1. More precise/accurate leveling can be done using these levels. 2. The telescope of this instrument needs only be approximately leveled over the tripod and then the ... it reduces operational fatigue. 5. Clear and erect image. 6. Light weight and compact.

Description : State four advantages and four disadvantages of plane table survey

Last Answer : Advantages: 1. A field book is not required. 2. Errors of booking in field book avoided. 3. Errors of plotting can be readily checked. 4. Suitable in magnetic area. 5. Survey work with ... cannot be done in rainy season. 5. Difficult to re-plot as field notes are not available.

Description : Write any four advantages of intersection method of plane tabling over radiation method of plane tabling.

Last Answer : Advantages of intersection method: 1. Interection method requires less ground distance measurement than radiation method. 2. By this method we can locate inaccessible points which cannot be ... to radiation method, intersection method eliminates undulation error, bisection error and plotting errors.

Description : Explain four types of meridians. 

Last Answer : 1. True meridian: -The line which is passing through geographical north or south pole and given point on the surface of earth is called as true meridian. 2. Magnetic meridian:-The direction indicated ... particular zone. These lines are termed as grid lines and the centre line as the grid meridian.