Draw a neat labeled sketch of 30m chain.

1 Answer

Answer :

image

neat labeled sketch of 30m chain

Related questions

Description : Draw labeled sketch of prismatic compass.

Last Answer : Sketch of prismatic compass :

Description : Draw a neat lebelled sketch of optical square. Explain its working.

Last Answer : Working of optical square1. Optical square works on principle of optical square to set perpendicular offset 2. Keep ranging rods at point B and C as shown in fig. 3. Observe the ... matched each other point D can be marked on ground and distance CD is measured as perpendicular offset.

Description : Draw a neat sketch of an arrow with dimensions.

Last Answer :  neat sketch of an arrow with dimensions

Description : Draw a neat sketch of optical square. Explain its working.

Last Answer : Optical Square: Working: The optical square consists of circular box 50 mm in diameter, 12.5 mm in depth. The box has three slits as A,B, and C. bb' is horizon glass, half silvered i.e ... the point on the chain line where the offset can be dropped to meet point J as shown in fig.  

Description : Draw a neat sketch of prismatic compass and label its component parts

Last Answer : Sketch of prismatic compass and label its component parts

Description : Draw the sketch of chain triangulation and label different lines.

Last Answer : AB – Base line AC, CD, DE, AE, EB - main survey lines DD’ – Check line. ab – Tie line.

Description : Describe with neat sketch, the optical square and explain its principle.

Last Answer : Principal of optical square :- the angle between the first incident ray and the last reflected ray is twice the angle between the two mirrors OR If there are two plane mirrors whose reflecting surfaces ... is 450 while that between the first incident ray and last reflected ray is 900 .  

Description : Explain the radiation method of plane table survey with neat sketch. 

Last Answer : This method is used when all the points to be plotted are visible from single instrument station. Steps are: 1. Select a suitable point P on the ground such that all the details are visible from it. 2. Center and ... , pc, pd, pe respectively. Join a, b, c, d, and e to give the outline.

Description : Explain dip of magnetic needle with neat sketch. 

Last Answer : i) The inclination of the magnetic needle with the horizontal is called as magnetic dip of the needle. ii) Ordinary needle if perfectly balanced on pivot, remains in horizontal position. But when the needle ... sliding weight is attached on the side of the needle which is at higher position.  

Description : Explain reciprocal ranging with neat sketch. 

Last Answer : Reciprocal ranging is done when ends of survey line are not intervisible due to hill intervening or ends of survey line are at far distance apart. Step wise procedure reciprocal ranging: 1. Let A and B be ... chained. 8. This method can also be used in ranging a line across a valley.  

Description : Define base line and check line with neat sketch. 

Last Answer : 1)Base Line : The longest line running roughly through the middle of the area to be surveyed is known as base line 2) Check line: The line joining the apex of a triangle to some fixed point on the ... A line joining some fixed point on any two sides of a triangle is known as check line. 

Description : Explain the procedure for profile leveling with neat sketch. 

Last Answer : 1) Let PQR be the given line of section.   2) Mark point at 10 m intervals on this line. 3) Level is set up on a firm ground at a suitable point I1. 4) Temporary adjustment of level is done and B. ... and set up on firm ground at I2 as before. 10) B.S is taken on CP1 and new HI is calculated  

Description : Explain ‘Intersection Method’ of plane table surveying with neat sketch. Also give situation when intersection method is used.

Last Answer : 1. Lay out a base line AB and measure it and Plot a distance ab' on sheet using any scale. 2.Set up instrument at A' with a' over A' 3.Orient the table by placing alidade ... the case of the survey of mountainous country. 5. The only linear measurement required is that of a base line.

Description : Explain Fly Levelling with neat sketch. State situation under which fly levelling is needed.

Last Answer : Ans: When DifferentialLevelling is done in order to connect a bench mark to the starting point of the alignment of any project, it is called as fly levelling. Fly levelling is also done to connect ...  ii)if distance is more between two points.  iii)if there obstacles between the two points.  

Description : Explain indirect ranging with neat sketch

Last Answer : Step wise procedure indirect ranging i.e. reciprocal ranging- Let A and B be the two station with rising ground or a hill intervening between them even i)Select any two intermediate station say M1 and N1 ... there position will be changed until finally they are both on the line A B exactly.  

Description : Define ‘ Fore bearing ’ & ‘ back bearing ’ of line with a neat sketch

Last Answer : Fore bearing : The bearing of line observed in the direction of progress of survey is called fore bearing of the line. Bearing of line AB is observed at A' towards B' is called as fore bearing of the line ... The bearing observed at B' towards A' is called as back bearing of the line AB'  

Description : Explain with neat sketch the procedure of radiation method of plane tabling.

Last Answer : 1. The table is set at suitable station e.g. P from where all stations can be sighted and measured. 2. After centering and leveling, mark station P as P' on sheet. 3. Suppose stations A, B, C, and D are ... marked as pa. 5. Similarly station B, C and D are bisected and marked as b, c and d.

Description : Explain with neat sketch graphical adjustment of closing error.

Last Answer : Procedure: 1. Plot the traverse e.g. A'BCDEA to suitable scale and obtain magnitude and direction of closing error. 2. Draw a straight line A'BCDEA to some suitable scale representing the ... plotted points and locate new position of station points to give correct traverse A'B'C'D'E'A'.

Description : With neat sketch, explain the included angle method of plotting compass traverse. 

Last Answer : 1. Calculate all included angles of the traverse from observed bearings of the lines. e.g. <A, <B, <C, <D, <E  2. Check sum of included angles as equal to ( ... coincide with starting station (in case of closed traverse). If there is closing error, it needs to be corrected. 

Description : With neat sketch, write the procedure of measurement of fore bearing with compass.

Last Answer : For measuring fore bearing of line AB, i) Place the compass over station A, center and level it.  ii) Looking through eye slit towards object vane, bisect the ranging rod at station ... which coincides with horse hair at observer end. The observed reading is the fore bearing of line AB

Description : Explain with neat sketch the procedure of reciprocal ranging.

Last Answer : Reciprocal ranging / Indirect ranging Procedure: Let A and B be two survey stations. They are not mutually visible due to high ground between them. Let two assistant stands at M1 and N1 as ... and N1 which are nearer to line AB. Repeat same process until points M and N are established. 

Description : Explain with neat sketch method of stepping of chaining on sloping ground.

Last Answer : Procedure : To measure the horizontal distance between points A & B on sloping ground following steps should be followed ( Refer above figure.) 1. Starting from point A, the chain is unfolded and ... . Finally calculate total chained distance as d(AB) = d(AP1) + d(P2P3) + d(P4P5)

Description : Explain principle of optical square with neat sketch.

Last Answer : Principle of optical square :- The angle between the first incident ray and the last reflected ray is twice the angle between the two mirrors In the case of optical square the angle between the mirrors is 45° while that between the first incident ray and last reflected ray is 90°.  

Description : Explain the process of chaining on sloping ground by stepping method with neat sketch.

Last Answer : The procedure to measure horizontal distance between the points A and B on sloping ground is as follows. 1. Two persons-leader and follower are required for chaining. 2. The follower holds the end of chain at A. The leader goes ... between A and b L = AM, + MN' + NO' + OP' + PQ' + QB'

Description : Explain reciprocal levelling with neat sketch. 

Last Answer : Reciprocal levelling is adopted i) To find the difference in level accurately Between the two points considerably apart. ii) When it is not possible to set up the level in between the two points ... true difference is equal to the mean of the two apparent differences of level between A and B 

Description : Differentiate between simple levelling and differential levelling with neat sketch. 

Last Answer : S.N Simple Levelling Differential levelling 1 Instrument is not shifted till the end of survey work.  Instrument is shifted as per requirements. 2 In this difference in elevation between ... elevation between two points is more or any obstacle between them. 4

Description : Describe in brief with neat sketch: i) Base line ii) Check line

Last Answer : i) Base line:  Base line is generally the longest line running roughly through the middle of the area. It is laid on a level ground as far as possible. The whole frame work is built upon this line. ... on the opposite side or a line joining some fixed point on any two sides of the triangle. 

Description : Draw a sketch and explain how to find height of chajja or slab using dumpy level.

Last Answer : Explanation : 1. First the back sight reading is taken on floor level whose RL is known to us; from which RL of instrument axis can be find out by adding RL of BM and BS reading. 2. Now ... staff reading. 4. Finally height of chajja is calculated as RL of slab bottom -  RL of floor top.

Description : Draw sketch and explain method of traversing of plane table surveying. 

Last Answer : Procedure: 1.Set plane table over station A use plumbing fork for transferring station point from ground on sheet. Draw the direction of magnetic meridian with the help of compass. 2. With the ... scale Similarly, the table can be set at other successive station and traverse is completed.

Description : Draw sketch and write the procedure for setting offset to the left or right side of suvey line with open cross-staff.

Last Answer : Procedure for setting offset with open cross staff : 1. Keep the ranging rods at point P(fixed on survey line) and at point A1 approximately. 2. The cross staff with stadia rod is fixed ... can be fixed and perpendicular offset AB is said to be set to given survey line PQ in left side.

Description : Draw sketch of optical square and state its principle.

Last Answer : The optical square is an instrument used to set perpendicular offset on the chain line. The optical square works on the principle of optics. Principle of optical square: The angle between the incident ray and reflected ray is twice the angle between mirrors.

Description : Draw neat labeled sketch of ply press.

Last Answer : sketch of ply press

Description : Draw neat and labeled sketch of three pass packages type boiler. 

Last Answer : Each set of tubes that hot combustion flue gas travels through before making a turn within the boiler, is considered a "pass." A 3-pass fire tube boiler design consists of three sets of ... design that allows more heat transfer time to deliver the same or higher efficiency rating. 

Description : Draw a neat labeled sketch of the following: i) Aqueduct ii) Super passage iii)Level crossing

Last Answer : i) Aqueduct  ii) Super passage Iii ) Level Crossing

Description : Draw a "well labelled diagram of 30 m metric chain & state the function of swivel joint & oval rings.

Last Answer : Swivel joint: To turn the handle without twisting the chain. Oval ring: To provide flexibility and fold the chain.

Description : What are offsets? How are they taken and recorded? Explain with sketch.

Last Answer : Offsets are lateral measurement to the base line. They are Located by judgment if short And by instruments (optical square or cross staff) if long and measured by metallic tape and shown with their chainages on base line

Description : Explain Direct method of chaining on sloping ground with neat skeetch. 

Last Answer : While chaining on sloping ground, the horizontal distances can be computed by direct method i.e. By stepping. By stepping: It consist in measuring the distance in small horizontal lengths (e.g.L1). Let ... is continued in the correct line with point B. Then length of line AB=L1 +L2 +L3+L4

Description : Explain the requirements of good formwork with names and materials proposed for beam of size 300 X 450 mm with neat labeled sketch.  

Last Answer : Requirements of good formwork:- 1. It should be adequately strong to withstand an extensive variety of dead and live loads. For instance, self-weight, weight of reinforcement, weight of wet concrete, loads of ... of concreting. 8. It should be lightweight. 9. It should be easy to remove.

Description : What consideration would you have while selecting survey stations and survey lines in a chain survey?

Last Answer : Following points to be considered while selecting survey stations and survey lines 1) Main survey station should be mutually visible. 2) All triangles should be well conditioned. 3) The survey line should lie ... of the area so as to form the frame work of triangles on it to cover maximum area. 

Description : A 20m chain was found to be 6cm too long after chaining a distance of 1059m. It was found to be 9cm too short after chaining at the end 1985m. If the chain was correct before commencement of work find the true distance.

Last Answer : Given : Line ABC, AB=1059m, AC=1985m  L= 20m, No error at start, 0.06m too long at B,  0.09m too short  Find : True distance of AC = ? Solution : For part AB L = Length of chain= 20 m e = Average ... Total true distance of AC = True distance of (AB + BC)  = 1060.59 m + 922.52 m  = 1983.11 m

Description : Describe method of measuring distances on ground using chain and arrows.

Last Answer : Method of measuring distances on ground. 1. Mark the position of survey stations whose distance is to be measured using wooden peg. (say A and B) 2. now, ranging is done if distance ... station B. Thus total horizontal distance will be equal to addition of distances measured of each parts.

Description : State the procedure to find the foot of the perpendicular on the chain line to take the offset. 

Last Answer : Ans: By cross staff 1. The cross staff is held vertically on the chain line where the offset is likely to occur. It is turned until one pair of opposite slits is directed to the ranging rod ( say ... the ranging rod at B. 3. The point P1 vertically under the instruments is required point. 

Description : State the uses of following instruments in survey: i)Cross staff ii) Chain iii) Pegs iv) Arrows

Last Answer : i) Cross-Staff: To set up perpendicular or right angle to given chain line OR to find foot of perpendicular from given object to a chain line. ii) Chain: Chains are used for measuring distances. iii) ... on survey lines. iv) Arrows : They are used to mark the end of each chain during chaining. 

Description : Explain Procedure for chain and compass traversing.

Last Answer : Chain and compass traversing : 1) Reconnaissance of the area to be surveyed is done. 2) Traverse stations are fixed. 3) The F.B and B.B of the traverse are measured by prismatic compass and ... occur when the traverse is plotted. 6) This error is adjusted graphically by using Bowditch Rule'. 

Description : Explain principle of chain surveying 

Last Answer : 1) Principle of chain surveying is triangulation 2) Triangulation consists of frame work of triangles. The whole area is divided into network of triangles. 3) A triangle is the only simple plane ... to be adopted depends upon the shape & configuration of the ground & the natural obstacles. 

Description : State the situations under which chain survey is most suitable

Last Answer : Situations under which chain survey is most suitable 1) It is suitable for moderately small areas 2) When the ground is fairly level with simple details ( free from obstructions such as trees, building, poles etc ) 

Description : State any four precautions to be taken while selecting stations for chain surveying.

Last Answer : Following are the precautions to be taken while selecting station for chain surveying. 1) As far as possible the survey work should be based upon the basic principle of surveying i.e. working from whole to ... level ground. 9) The survey lines should run as far as possible nearer to object.

Description : The length of line measured by 20 m chain was found to be 751 m. The chain was tested before start of measurement and was found correct. The chain was again tested after measurement and was found 6 cm too short. What shall be the correct length of line ?

Last Answer : Given Data: Standard length of chain (L)= 20m Measured Length (M.L.) = 751 m Error before start of measurement = 0.0 Error after measurement = 6 cm = 0.06 m To Find: Actual length or Correct length Solution: ... (L'/L)  = (751) x (19.97/20)  = 749.87 Correct length of line is 749.87 m

Description : A 20 m chain was found to be 10 cm too short after chaining 1000 m It was found to be 20 cm too short after chaining 1800 m. If the chain was correct before commencement of the work find the true distance.  

Last Answer : Average error in chain for 1000 m length = (0 + 10) / 2 = 5 cm = 0.05 m too short True length up to 1000 m = (20 - 0.05) x 1000 / 20 = 997.5 m. Average error in chain from 1000 m to 1800 m length = (10 ... 1800 m length = (20 - 0.15) x 800 / 20 = 794.0 m. True distance = 997.5 + 794 = 1791.5 m.

Description : Enlist the factors affecting on selection of survey station or survey line in chain survey.

Last Answer : Following are the factors affecting on selection of survey station for chain surveying. 1) As far as possible the survey work should be based upon the basic principle of surveying i.e. working from whole ... level ground. 9) The survey lines should run as far as possible nearer to object.