A is thrice as fast as B. If B can do a piece of work in 60 days, the number of days they take to complete the work is ……..

1 Answer

Answer :

A is thrice as fast as B. If B can do a piece of work in 60 days, the number of days they take to complete the work is ……..

Related questions

Description : Ram, Suresh and Shilpa, working together, can do a piece of work in 1 day. Ram is thrice as efficient as Suresh, and Suresh takes twice the number of days as Shilpa takes to do it alone. What is the difference between ... and Shilpa, each working alone, to complete the work? a) 1 b) 2 c) 3 d) 4 e) 5

Last Answer : Let the time taken by Ram, Suresh and Shilpa to finish the work alone be A, B and C respectively Therefore, 1/A + 1/B + 1/C = 1 Also it is given that, A = B/3 and C =B/2 3/B + 1/B + ... between the number of days taken by Ram and Shilpa, each working alone, to complete the work = 3-2 = 1 Answer: a)

Description :  Arfath is thrice as good workman as deekshith and together they finish a piece of work in 27 days. In how many days will arfath alone finish the work? a) 9 days b) 10 days c) 11 days d)12 days

Last Answer : A Arfath’s 1 days work = 3 Deekshith 1 day’s work = 1 Arfath 1 day’s work : Deekshith 1 days work = 3:1 (Arfath + deekshith )’s 1 day’s work = 1/27 Divide 1/27 in the ratio 3:1 Arfath’s 1 days work = 1/27 *3/1 = 3/27 =1/9 Hence Arfath’s alone can finish the work in 9 days

Description : Karthik is 2 times as good workman as Raghu and together they complete a piece of work in 42 days. The number of days taken by Karthik alone to finish the work is. a) 55 days b) 60 days c) 63 days d) 67 days

Last Answer : C Karthik’s 1 day work : Raghu’s 1 day work = 2:1 (Karthik + Raghu)’s 1 day work = 1/42 Divide 1/42 in the ratio 2:1 Therefore karthick’s 1 day work = 1/42 * 2/3 =1/63 Hence karthik alone can finish the work in 63 days.

Description : P,Q, & R can complete a piece of job together in 20 days. All the 3 started working at it together and after 8 days P left. Then Q & R together completed a job in 20 more days. P alone could complete the work in. a) 60 b) 50 c) 40 d) 30

Last Answer : B Work done by P,Q & R in 8 days = 1/20 * 8 =2/5 Remaining work = (1 - 2/5) = 3/5 Now 3/5 work is done by Q & R in 20 days Whole work will be done by Q & R in(20*5/3) =100/3 days (P+Q+R ... (Q+R)'s 1 day work =1/20 - 3/100 =5-3/100 =2/100 =1/50 P alone could complete the work in 50 days..

Description : X and Y can do a piece of work in 20 days and 30 days respectively. The time they take to complete the work by working together is ……………

Last Answer : X and Y can do a piece of work in 20 days and 30 days respectively. The time they take to complete the work by working together is ……………

Description : Rakchita can do a piece of work in 28 days, while Shreya can do the same work in 42 days.They started the work together but 6 days before the completion of the work, Rakchita left the work. The total number of days to complete the work is a) 3 b) 4 c) 5 d) 6 

Last Answer : D 6 days before the completion of the work Rakchita left the work means in last 6 days only Shreya has worked alone So, in last 6 days worked done by Shreya = 6*1/42=6/42=1/7 So, the rest = 1-1/7 =6/7 So 6/7work was done by Rakchita and Shreya worked together=6/7*70/10 =420/70=6 days

Description : A cistern is filled in 15 hours by three pipes P, Q and R. The pipe R is thrice as fast as Q and Q is thrice as fast as P. How much time will pipe P alone take to fill the tank? A) 120 hrs B) 195 hrs C) 135 hrs D) Cannot be determined 

Last Answer : B Suppose pipe P alone takes x hours to fill the tank. Then, pipes Q and R will take x/3 and x/9hours respectively to fill the tank. 1/x + 3/x + 9/x = 1/15 13/x = 1/15 => x = 195 hrs.

Description : A dumper is filled in 15hrs by 3 tubes P,Q,and R. the tube R is thrice as fast as Q and Q is thrice as fast as P. How much time will tube Q alone take to fill the tank? A) 195hrs B) 190hrs C) 185hrs D) 180hrs

Last Answer : A Suppose tube P alone takes x hrs to fill the tank Then tubes Q and R will take x/3 and x/9 hrs respectively to fill the dumper. Therefore 1/x + 3/x+ 9/x = 1/15 13x = 1/15 X = 195 hrs

Description : Twenty two men cann complete a piece of work in 17 days. They work for 2 days. How many more men should now be employed so as to complete the work in

Last Answer : Twenty two men cann complete a piece of work in 17 days. They work for 2 days. How many more men should now be ... A. 11 B. 22 C. 33 D. none of these

Description : 90 persons can complete a job in 32 days. 12 days after they started working, 60 more persons joined them. How many days will they now take to complete the remaining work? a) 10 days b) 12 days c) 14 days d) 16 days

Last Answer : B (90 * 32) persons can complete the work in 1 day. 1 person 1 day's work = 1/(90 *32) i.e., 1/2880 90 person's 12 day's work = 1/32 * 12 = 3/8 Remaining work =(1- 3/8) = 5/8 150 persons 1 ... 5/96 work is done by them in 1 day . Therefore 5/8 work is done by them, = (96/5*5/8) =12 days.

Description : A bus and a truck are available to cross a jungle. The speed of the truck is thrice that of the bus. The capacity of the truck is 60 persons and that of bus is 40 persons. The average occupancy of the bus is twice ... boarding it and its capacity. a) 9:17 b) 17:9 c) 8:27 d) 27:8 e) None of these

Last Answer :  Answer: D Average Rupee collection = Speed× capacity × Occupancy × Ticket rate Ratio of average Rupee collection of truck to that of bus= product of above rate According to question, (3×60×1×1.5):(1×40×2×1)= 270:80=27:8

Description : If 40 men complete a piece of work in 5 days, then 80 man can complete the same piece of work in _____.

Last Answer : If 40 men complete a piece of work in 5 days, then 80 man can complete the same piece of work in _____.

Description : Fifteen men can complete a piece of work in 10 days, working 8 hours per day. How many persons are required to complete double the work in 25 days, wo

Last Answer : Fifteen men can complete a piece of work in 10 days, working 8 hours per day. How many persons are ... work in 25 days, working 6 hours per day ?

Description : The capacities of A,B and C to complete a piece of work is `1:2:3`. By working together, the thre of them can complete the work in 24 days. In how man

Last Answer : The capacities of A,B and C to complete a piece of work is `1:2:3`. By working together, the ... days. In how many days can C alone complete it ?

Description : A boy and his mother together can do a piece of work in 24 days while the day, working with his father, can complete it in 18 days. If the mother and

Last Answer : A boy and his mother together can do a piece of work in 24 days while the day, working with ... take to complete the job, if they work individually.

Description : A can complete a piece of work working along with B in 20 days. If he can complete the same work working along with C in 10 days, then between B and C

Last Answer : A can complete a piece of work working along with B in 20 days. If he can complete the same work ... , then between B and C who is more efficient ?

Description : X, Y and Z can complete a piece of work in 10 days. X and Y can do it in 20 days. Then Z alone can complete the work in ……………… days.

Last Answer : X, Y and Z can complete a piece of work in 10 days. X and Y can do it in 20 days. Then Z alone can complete the work in ……………… days.

Description : 8 men and 4 women-together can complete a piece of work in 6 days. Work done by a man in one day is double the work done by a woman in one day. If 8 men and 4 women started working and after 2 days, 4 men ... more days will the work be completed? a) 7 days b) 6 days c) 5 days d) 8 days e) 4 days 

Last Answer : 1 man = 2 women 8 men + 4 women = 20 women 2 day's work of 20 women = 20 × 6/1 = 20 × 2/x x =1/3 Remaining work = 1 – 1/3 = 2/3 Total number of females = 16 20 × 6/1 = 16 × x ÷2/ 3 x = 5 days Short Cut M1D1=M2D2+M3D3 10x6 =10x2 + 8 x 60-20= 8x x= 5 days Answer: c)

Description : Twenty workers can complete a piece of work in 30 days. After how many days should 5 workers leave the job so that the work is completed in 35 days? a) 5 days b) 10 days c) 15 days d) 20 days

Last Answer : c) 15 days

Description : Among 4 persons A, B, C and D. A takes twice as much time as B to complete a piece of work. B takes twice as much time as C and C takes twice as much time as D to complete the same work. One group of three of the ... is the group that takes 11 days? a) A.B.C b) A,B,D c) B,C,D d) None of the above

Last Answer : B From the given information B is twice as efficient as A. C is twice as efficient as B. D is twice efficient as C. If work done by A in a day is 'n' units, the work done in a day by B, ... of times taken to complete the work by the former and later groups is 11:7 A, B and D take 11 days.

Description : P is thrice as fast as Q and Q is 4 times as fast as R. If the journey covered by R is 48 mins, then the time to be covered by Q. a) 12 b) 14 c) 10 d) 6 

Last Answer : A Let R's speed = x km/hr Then Q's speed = 4x km/hr P's speed = 12x km/hr Ratio of speeds of P<Q<R = 12x :4x:x =12:4:1 Ratio of time taken = 1/12: ¼:1 =1:3:12 If R ... mins, then Q takes 3 mins If R takes 48 mins, then Q takes =(3/12 *48)mins =(144/120mins =12mins

Description : One tap can fill a tank thrice as fast as another tap. If together the two taps can fill the tank in 12 minutes, then the slower tap alone will be able to fill the tank in A) 30min B) 33min C) 32min D) 35min

Last Answer : C (1/x)+(1/3x)=(1/12) 3+1/3x = 4/3x = 1/12 3x = 48 x=32mins

Description : Two trains, both 50m long, moving in opposite directions cross each other in 4 seconds. If one is moving thrice as fast the other, then the speed of the faster train is. A) 45km/hr B) 19 km/hr C) 95 km/hr D) 67.5 km/hr

Last Answer : ANSWER:D Explanation:  Let the speed of the slower train be x' m/sec  The speed of the sfaster train = 3x m/s  Relative speed = (x +3x)m/sec  = 4x m/sec  50 + 50 / 4 = 4x  100 / 4 = 4x  100 = 16x  x = 100 ... the faster train = 3 * 25 / 4  = 75 / 4 m/s = (75/4 *18 /5)km/hr  = 67.5 km/hr

Description : A is twice as fast as B and together they can complete a work in 20 days. In how many days can A alone complete the work?

Last Answer : A is twice as fast as B and together they can complete a work in 20 days. In how many days can A alone complete the work?

Description : Pranesh can do a piece of job in 60 days. He works at it for 4 days and then sarvesh alone finishes the remaining work in28 days. In how much time will pranesh and sarvesh working together, finish the work? a) 35 days b) 30 days c) 25 days d) 20 days

Last Answer : D Work done by pranesh in 4 days = 1/60 *4 =1/15 Remaining work = 1-1/15 =(15 - 1)/15 =14/15 Now 14/15 work done by sarvesh in 28 days Whole work will be done by sarvesh in(28*15 /14) = 2* 15 =30 ... 's work = 1/60 + 1/30 = (1+2) /60 = 3/60 =1/20 Hence both will finish the work in 20 days

Description : P and Q can do a piece of job in 24 days; Q and R can do it in 30 days while R and P can finish it in 40 days. If P, Q, Rworks together, in how many days will they finish the job? In how many days will each ... finish it, working alone? A) 15,25,35,45 B) 20,30,40,120 C) 20,30,40,50 D) 20,25,30,60 

Last Answer : B Time taken by (P + Q) to finish the job = 24days. (P + Q)'s 1 day's job = 1/24 Time taken by (Q +R) to finish the job = 30days. (Q + R)'s 1 day's job = 1/30 Time taken by (R + P) to finish the ... - {(P + Q)'s 1 day's job } = (1/20 -1/24)=1/120 Hence, R alone can finish the job in 120 days.

Description : The APO shall submit its nominations with complete documentation to the Commission not later than ______ prior to the expiry of the term of an incumbent chairman or member. a. 30 days b. 60 days c. 90 days d. 120 days

Last Answer : 60 days

Description : Sugarcane takes about how much time to complete its germination phase a).10 days b).15 days c). One month d). 60 days

Last Answer : c). One month

Description : Faucet A basically used as inlet pipe and Faucet B is used as outlet pipe. Faucet A and B both are opened simultaneously, all the time. When Faucet A fills the tank and Faucet B empty the tank, it will take thrice the ... efficiency of Faucet A and Faucet B respectively? a) 1:2 b) 2:1 c) 1:3 d) 3:1

Last Answer : B Efficiency when both pipes used to fill = A + B And efficiency when Faucet A is used to fill and Faucet B is used to empty the tank = A-B So (A+B)/(A-B)=3/1 A/B+1/(A/B-1)=3/1 A/B+1=3(A/B-1) 3A/B-A/B=4 2A/B=4 A/B=2 Thus, the ratio of efficiency of Faucet A and B =2:1

Description : A is thrice as good workman as B. The ratio of work done by A and B in the same time is …………

Last Answer : A is thrice as good workman as B. The ratio of work done by A and B in the same time is …………

Description : 48 boys complete a work in 36 days. After they have worked for 24 days, 24 more boys join them. How many days will they take to complete the remaining work? a) 8 days b) 6 days c) 4 days d) 3 days

Last Answer : A 1 boy’s 1 day’s work = 1/(36*48) =1/1728 48 boy’s 24 day’s work=48*24/1728=2/3 Remaining work = 1-2/3=1/3 72 boy’s 1 day’s work =72/1728=1/24 1/24 work is done by them in 1 day. So, 1/3 work is done by them in 24/3= 8 days

Description : 8 male can finish a work in 6 days.12 female can complete the same work in 9 days. 6 male and 4 female started working and after 4 days 3 more female joined them. How many days will they now take to complete the remaining work? a) 76/41 days b) 25/62days c) 3/31days d) 4/77days

Last Answer : A 1 male's 1 day work = 1/48 1 female's 1 day work = 1/108 Work done in 4 days = 4 (6/48 +4/108) =4(1/8+1/27) =1/2+4/27 =(27+8)/54 =35/54 Remaining work = (1 - 35/54) = 19/ ... (27+14)/216 =41/216 Now 41/216 work is done by them in 1 day Therefore time taken = 216/41 * 19/54 = 76/41 days

Description : The ratio of the number of days required by A,B and C to do a piece of work hours is `1:2:3`. Then, the ratio of work is ……………

Last Answer : The ratio of the number of days required by A,B and C to do a piece of work hours is `1:2:3`. Then, the ratio of work is ……………

Description : Vinay can do a work in 28 days. Vikram is 75% more efficient than vinay. The number of days taken by vikram to do the same piece of work.  a) 12 days b) 14 days c) 16 days d) 18 days

Last Answer : C Given a certain work done by vinay = 28 days Efficient percentage of vikram = 75% Ratio of time taken by vinay and vikram = 175 : 100 = 7:4 Suppose vikram takes ‘x’ days to do the work. 7:4 :: 28 : x 7x = 4*28 X= 4*28/7 X= 4*4 = 16 days So vikram takes 16 days to do the work.

Description : A and B can do a piece of work in 12 days, B and C in 15 days and C and A in 20 days. In how many days can they do it, all working together?

Last Answer : A and B can do a piece of work in 12 days, B and C in 15 days and C and A in 20 days. In how many days can they do it, all working together?

Description : A man can do a piece of work in 10 days. With the help of a boy he can do the same piece of work in 8 days. If they get Rs. 11115 for the work then what will be the share of boys? a) Rs.2223 b) Rs.2784 c) Rs.3163 d) Rs.3312 e) None of these

Last Answer : In one day boys can do = (1/8) – (1/10) = (5-4)/10 = 1/40 part so, boys can finish the work in 40 days. Now, Men’s share : Boy’s share = 40 : 10 = 4 : 1 Boys share = (11115 / 5) × 1 = Rs. 2223 Answer is: a)

Description : M do a piece of work in 45 days and N can finish it in 40 days. They work together for 5 days and then M leaves. In how many days will N finish the remaining work? a) 30 5/9 b) 29 4/9 c) 31 3/5 d) 29 5/9

Last Answer : A Time taken by M to finish the work = 45 days. M's 1 day's work = 1/45 Time taken by N to finish the work = 40 days. N's 1 day's work = 1/40 (M + N)'s 1 day's work = (1/40+1/45) = ... be done by N in (55/72*40) days = 30and 5/9 days. Hence, the remaining work is done by B in 30 and 5/9 days.

Description : Twice the number of marbles with Aman exceeds thrice the number of marbles with Vinay by 12. Assume the number of marbles with Aman and Vinay as x and y respectively .Express the statement in the form of a linear equation in two variables. -Maths 9th

Last Answer : answer:

Description : There is certain number of rows of chairs in a room .The number of chairs in each row is thrice the total number of rows. Find the number of charis in

Last Answer : There is certain number of rows of chairs in a room .The number of chairs in each row is thrice ... in the room if the total number of chairs is 2187

Description : How do you translate the word five less than thrice a number into algebraic expression?

Last Answer : Let the number be x and so the algebraic expression would be: 3x-5

Description : Out of four numbers, the average of the first three numbers is thrice the fourth number. If the average of the four numbers is 5, the fourth number is: (A) 4.5 (B) 5 (C) 2 (D) 4

Last Answer : (C) 2  Answer: C Give that average of the four numbers is 5. So addition of 4 numbers is 20. The average of the first three numbers is thrice the fourth number So 6 + 6 + 6 =18. Hence fourth is 20- 18 =2.

Description : Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men work to complete the job? (a) 8 hrs (b) 7 1/2 hrs (c) 7 hrs (d) 9 hrs

Last Answer : (b) 7 1/2 hrs

Description : After finishing the work by Aswin for 9 days, Ajay finds that only 1/4 of the work has been done. He employs Ajay who is 80% as efficient as Aswin. How many days more would Ajay take to complete the work? a) 32 b) 28 c) 34 d) 26

Last Answer : C Aswin has completed 1/4 of the work in 9 days Then he can complete the total work in 1/4 ---- 9 1 ---- ? = 36 days But given Ajay is only 80% as efficient as Aswin Ajay = 1/36*80/100=1/45 Ajay can ... work can be completed in 1 ------ 45 3/4 ------ ? =3/4*45 =33.75=34 days (approx.)

Description : A officer undertakes to complete a job in 250 days. He employs 300 male for 50 days and they complete 1/2 of the work . He then reduces the number of male to 100, who work for 120 days, after which there ... male must be employed for the remaining period to finish the work? a) 25 b) 50 c) 45 d) 35

Last Answer : B 300 male in 50 days do = 1/2work 1 male in 1 day does = ½*1/50*1/300 work 100 male in 120 days do = ½ *1/50*1/300 *100*120 =2/5 work Total work done = ½ + 2/5 =(5+4)/10=9/10 ... is done in 50 days by 300 male 1/10 work is done in 60 days by =300*50*1*2/10*60 =50 male

Description : What is the oldest piece of complete DNA yet sequenced?

Last Answer : answer: There is one problem that DNA studies of population movements within the past 10,000 years do not have: dating of the samples, as radiocarbon dating is considered to be accurate up to 50,000 years. ... if a sequence of that age has never been recovered. Wow, isn't this stuff incredible?? :)

Description : An insulation resistance test is performed on a particular piece of electric equipment. In addition to the resistance reading, what information listed below should be entered in the electrical log? A. ... D. The complete nameplate data from the resistance test instrument used to obtain the reading.

Last Answer : Answer: B

Description : 4 women and 3 men can do a piece of work in 2 days while 6 women and 2 men can also finish it in 2 days. Now find the time taken by one woman to compl

Last Answer : 4 women and 3 men can do a piece of work in 2 days while 6 women and 2 men can also ... time one man takes to complete the same job working alone.

Description : A and B together can do a piece of work in 20 days, while B and C together can do the same work in 15 days. If A ,B and C together can finish this wor

Last Answer : A and B together can do a piece of work in 20 days, while B and C together can do the same ... number of days in which B alone can finish the work.

Description : A can do a piece of work in 20 days while B can do it in 30 days. Both of them start the work together and work for some time, then B leaves. If A com

Last Answer : A can do a piece of work in 20 days while B can do it in 30 days. Both of them start ... then find the number of days for which they worked together.

Description : Working together, X and Y can do a piece of work in 12 days, Y and Z can do it in 15 days where as X and Z can do it in 20 days. Who is the most effci

Last Answer : Working together, X and Y can do a piece of work in 12 days, Y and Z can do it in 15 days where ... Z can do it in 20 days. Who is the most effcient?