How to project an image on a stage backdrop?

1 Answer

Answer :

answer:With a projector. In other words, can you be more specific as the problem?

Related questions

Description : How can I prepare a stage backdrop that serves as a projector screen at the same time?

Last Answer : That might not be a great idea because the people in front of the screen will cause shadows on the screen, but if you want an inexpensive way to do it, you could get several wooden palates stacked on top of each other with butcher paper spread out and stapled onto it.

Description : What photo backdrop do you usually use?

Last Answer : I have used a gradated roll-up backdrop in grey for photographing my 3-D artwork.I bought it on Ebay for under $20.It has since faded to a blue tone that I dislike,so I now use a large ... formica,purchased at Home Depot,that I curve and adjust the lights to get the same gradation in the background.

Description : Need large format printing for red carpet photo backdrop

Last Answer : I found it surprisingly affordable to have a (huge) vinyl banner made up at Kinkos/FedEx.

Description : What is Backdrop on the desktop?

Last Answer : What is the answer ?

Description : How to project images behind me on stage.

Last Answer : A projector would probably do a decent job projecting.

Description : Using a Projector to project to a very close screen (stage performance)

Last Answer : Could you try doing a rear projection? Most projectors have a mirror image setting designed so that you can project onto a semi-transparent screen from behind and have the image appear correctly to ... I'll also make sure my fellow ask-public-ite and lighting designer friend reads this question).

Description : The entire process of a project may be considered to be made up on number of sub process placed in different stage called the (A) Technical key resources (B) Work key structure (C) Work Breakdown Structure (WBS). (D) None of the above

Last Answer : (C) Work Breakdown Structure (WBS).

Description : In the initial stage of the project the probability of completing the project is ___ . (A) Zero (B) High (C) Low (D) Any of the above

Last Answer : (C) Low

Description : Resorce requirement in project becomes constant while the project is in its _____ progress stage. (A) 40 to 55% (B) 55 to 70% (C) 70 to 80% (D) 80 to 95%

Last Answer : (D) 80 to 95%

Description : Which of the following is not correct about initial phase of a project? a. The cost associated at the beginning of the project is highest. b. Stakeholders have maximum influence during this phase c. The highest uncertainty is at this stage of the project. d. All the above statements are correct.

Last Answer : a. The cost associated at the beginning of the project is highest.

Description : Once the project is approved and moves into the planning stage, what happens  in the next phase of the project life cycle? Select one: a. Agreements for risk sharing need to be concluded. ... activities. e. A risk response plan can be used to identify increasing levels of detailed risk analysis

Last Answer : d. Risks are identified with each major group of activities.

Description : Once the project is approved and moves into the planning stage, what  happens in the next phase of the project life cycle? Select one: a. Agreements for risk sharing need to be concluded. ... activities. e. A risk response plan can be used to identify increasing levels of detailed risk analysis

Last Answer : d. Risks are identified with each major group of activities.

Description : The planning and scoping should be such that the project manager can assess every  stage of the project and the quality of the deliverable of the project at every stage. (True/False)

Last Answer : Ans. True

Description : In the ____ stage, of project identification the project ideas generated above are  screened and a preliminary exercise is conducted to weed out the bad or unviable ideas.

Last Answer : Ans. Screening

Description : Feasibility analysis is the first stage in the process of project development. (True/False)

Last Answer : Ans. True

Description : It is often difficult to estimate size at an early stage in a project  when only a specification is available a) True b) False

Last Answer : a) True

Description : Controlling the changes in the project may affect (A)The progress of the project (B)Stage cost (C)Project scope (D)All of the abov

Last Answer : (D)All of the abov

Description : The entire process of a project may be considered to be made up on number of sub process placed in different stage called the (A)Technical key resources (B)Work key structure (C)Work Breakdown Structure (WBS). (D)None of the above

Last Answer : (C)Work Breakdown Structure (WBS).

Description : In the initial stage of the project the probability of completing the  project is . (A)Zero (B)High (C)Low (D)Any of the above

Last Answer : (C)Low

Description : Resorce requirement in project becomes constant while the  project is in its progress stage. (A) 40 to 55% (B) 55 to 70% (C) 70 to 80% (D) 80 to 95%

Last Answer : (D) 80 to 95%

Description : Which stage marks the beginning of the project? a ) Initiation b) Planning c) Deciding on a project d) Closing out the previous project.

Last Answer : Initiation

Description : .In the initial stage of the project the probability of completing the project is ___ .   A.Zero  B.High  C.Low  D.Medium

Last Answer : C.Low

Description : Which stage of project management life cycle requires the maximum time of  completion  A.Conceptualization  B.Planning  C.Execution  D.Estimation

Last Answer : C.Execution

Description : Estimates from the planning stage will need to be refined as the project progresses,  because it is virtually impossible to develop an exact assessment of the project’s schedule  before the analysis and design phases are conducted.

Last Answer : Ans: True

Description : You are the project manager for a cable service provider. Your team members are  amiable with each other and are careful to make project decisions jointly. Which of the  following statements is true?  ... stage of Develop Project Team. D. They are in the forcing stage of Develop Project Team.

Last Answer : B. They are in the norming stage of Develop Project Team.

Description : Which of the following is not correct about initial phase of a project? a. The cost associated at the beginning of the project is highest. b. Stakeholders have maximum influence during this phase c. The highest uncertainty is at this stage of the project. d. All the above statements are correct.

Last Answer : a. The cost associated at the beginning of the project is highest.

Description : Resource requirement in project becomes constant while the project is in its progress stage. A. 40 to 55% B. 55 to 70% C. 70 to 80% D. 80 to 95%

Last Answer : D. 80 to 95%

Description : Changes to the project involve moving from: A. Project control stage to project definition stage B. Project control stage to project planning stage C. Project control stage to understanding the project environment stage D. None of the above

Last Answer : A. Project control stage to project definition stage

Description : What part of the manufacturing process relate to each stage of the process and to the process as a whole? a) field service b) design c) distribution d) project management

Last Answer : d) project management

Description : Which stage of the manufacturing process has been described as “the mapping of function onto form”? a) Design b) Distribution c) Project management d) Field service

Last Answer : a) Design

Description : This/These Management Guru/s, formulated a bar chart that measures planned and completed work along each stage of project A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Henry Gant

Description : This/These Management Guru/s, formulated a bar chart that measures planned and completed work along each stage of project A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Henry Gantt

Description : For a typical project, the cumulative cash flow is zero at the (A) End of the project life (B) Breakeven point (C) Start up (D) End of the design stage

Last Answer : (B) Breakeven point

Description : In time-cost optimization of a project, crashing is done. (A) On all the activities (B) On all the activities lying on the critical path (C) Only on activities lying on the ... critical activities and those that become critical at any stage of crashing in the order of ascending cost slope

Last Answer : D

Description : Investigation for important bridges may be carried out in which stage a) Technical feasibility study (reconnaissance survey) b) Techno-economic feasibility study (preliminary engineering survey) c) Detailed survey and project report stage (final location survey) d) All the above *

Last Answer : d) All the above