.In Indian Railway how many Gauges of Track has been adopted a. 1
b. 3*
c. 2
d. 4

1 Answer

Answer :

b. 3*

Related questions

Description : The main drawback of the railway network in India is (a) lack of rolling stock (b) existence of single track in many areas (c) lack of coal (d) the presence of three types of gauges

Last Answer : Ans: (d)

Description : For laying a Railway track the prepared surface ready to receive the ballast is called a) Sub ballast b) Formation* c) Blanket d) Cushion

Last Answer : b) Formation*

Description : 1. Which of the statements with regard to formation is correct (1) One of the Functions of the formation is to facilitate drainage (2) Width of bank for double railway line is 12.155 meters (3) Width of cutting for double railway track is 11. ... a) 2, 3, 5 b) 3, 4, 5* c) 2, 3, 4 d) 2, 4, 5

Last Answer : b) 3, 4, 5*

Description : Height gauges should be located at a minimum distance of….. from gate post. (a) 5 m (b) 7.5m (c) 8m* (d)10m

Last Answer : (c) 8m*

Description : On Indian Railways a new level crossing can be provided with the approval of a) Chief engineer b) General Manager c) Commissioner of Railway Safety d) None of the above*

Last Answer : d) None of the above

Description : With regard to standard of quality of drinking water as laid down by Indian Railway , the requirement (desirable) limit of total dissolved solids should not be more than---------- mg/l a)200 b) 300 c) 400

Last Answer : d) 500*

Description : How many zones are in Indian railway a. 8 b. 10 c. 16* d. 12

Last Answer : c. 16*

Description : On the basis of temperature how many zones are in Indian railway a. 2 b. 6 c. 4* d. 7

Last Answer : c. 4*

Description : What is the Highest speed of train in Indian Railway a. 140 KMPH b. 120 kmph c. 160 kmph* d. 130 kmph

Last Answer : c. 160 kmph*

Description : Longest passenger train on Indian Railway is 1. Prayagraj Express* 2. Kalka Mail 3. Himsagar express 4. Lucknow mail

Last Answer : 1. Prayagraj Express*

Description : Longest Railway Bridge on Indian Railway is 1. Sone Bridge at Dehri on Sone* 2. Yamuna Bridge at Kalpi 3. Ganga Bridge near Patna 4. Pamban Bridge

Last Answer : 1. Sone Bridge at Dehri on Sone*

Description : Longest tunnel on Indian Railway is a) Kharbude tunnel on Konkan Railway* b) Near Lonavala between Monkey hill and Khandala station c) Kalka Shimla d) Darjeeling hill Railway

Last Answer : a) Kharbude tunnel on Konkan Railway*

Description : In order to do fly levelling the following type of methodology is adopted (a) Rise & fall method (b) Height of instrument method (c) Both the above* (d) None of the above

Last Answer : c) Both the above*

Description : The height of formation depends upon the a) Ground contours and the gradient adopted* b) Ground contour only c) Gradient adopted only d) Rainfall intensity over the year

Last Answer : a) Ground contours and the gradient adopted*

Description : Repairing by cement pressure grouting can be adopted in case of a) Honey comb concrete b) Hollow masonry, Dormant cracks c) Deep leached mortar joints d) all the above*

Last Answer : d) all the above*

Description : The maximum gradient in station yards should be ……. Unless special safely devices are adopted and/or special rules enforced. (a) 1 in 400* (B) 1 in 500 (c) 1 in 1000 (D) 1 In 600

Last Answer : (a) 1 in 400*

Description : Urinals & Latrines for A & B stations as norms for recommended level of facilities for railway station (a) Ndb/500 (b) Ndb/300 (c) Ndb/200* (d) None of the above

Last Answer : (c) Ndb/200*

Description : A Railway Stations is provided for the following purpose (a) To entrain or detrain the passengers (b) To load or off load the goods or parcels (c) To enable the faster trains to overtake the slower trains (d) All the above*

Last Answer : d) All the above*

Description : A new railway line is required to be constructed beaus’ of following reasons (a) Strategic and political considerations (b) Development of backward area (c) To shorten existing rail link (d) Any of them*

Last Answer : d) Any of them*

Description : Survey of the major projects is done by (a) Chief Engineer (b) Chief Administrative Officer (CAO) construction* (c) Divisional Railway Manager (d) Railway Board

Last Answer : (b) Chief Administrative Officer (CAO) construction*

Description : A detailed project report of the proposed railway line is made after (a) Preliminary survey (b) Reconnaissance survey (c) Final location survey* (d) Traffic survey

Last Answer : (c) Final location survey*

Description : Traffic survey is done to find out (a) The most promising route for the railway in the area (b) The possible traffic the railway line will carry (c) Standard of railway line to be followed (d) All the above*

Last Answer : d) All the above*

Description : The purpose of reconnaissance survey (a) To determine technical fenibility of the line* (b) To assess whether such a line is required or not (c) To decide the final alignment of the railway line (d) None of the above

Last Answer : (a) To determine technical fenibility of the line*

Description : Which of the following survey are required to be done before the construction of new railway line. (a) Traffic survey (b) Reconnaessarice survey (c) Preliminary survey (d) Final location survey (e) All the above

Last Answer : e) All the above

Description : Sewerage system of a railway colony may be (a) Combined system (b) Separate system (c) Partially combined system (d) Any of them*

Last Answer : (d) Any of them*

Description : Which of the following stone is best suited for construction of piers and abutments of Railway Bridge a) Granite* b) Sandstone c) Limestone d) Quartzite

Last Answer : a) Granite*

Description : Stone generally preferred for railway ballast is a) Sandstone b) Dolomite c) Marble d) Basalt or trap granite*

Last Answer : d) Basalt or trap granite*

Description : arthwork in embankment for railway with manual compaction should be done in layers not exceeding-------------- a) 15 centimeter b) 20 centimeters c) 25 centimeters d) 30 centimeters*

Last Answer : d) 30 centimeters*

Description : Centre to Centre spacing of formation for double railway line for Broad Gauge is a) 1676 mm b) 4725 mm c) 4265mm d) 5300 mm*

Last Answer : d) 5300 mm*

Description : Speed breaker of approved design shall be provided on either side of level crossing at ------ within Railway boundary a) 5 meters b) 15 meters c) 20 meters* d0 30 meters

Last Answer : c) 20 meters

Description : Speed breaker has to be provided on road approaches of level crossing at maximum feasible distance within Railway boundary but not exceeding a) 10 meters b) 15 meters c) 20 meters* d) 200 meters

Last Answer : c) 20 meters*

Description : When the railway crosses a deep vally without perinial water,it is called……. a)Aqueduct * b)Cause way c)Via-duct d)River crossing

Last Answer : a)Aqueduct *

Description : RBG loading stands for a)Revised Broad gauge loading b) Rolling Broad gauge loading c)Railway Broad gauge loading d) None of above

Last Answer : a)Revised Broad gauge loading

Description : For railway bridges with spans in excess of 30.5m, generally provided with a) deck type girders b) open web through girders* c) semi through girders d) shallow type girders

Last Answer : b) open web through girders*

Description : Temporary arrangements for rebuilding of Railway bridges can be executed by providing a) Temporary girder b) Temporary diversion c) Any of the above* d) None of the above

Last Answer : c) Any of the above*

Description : tructural steel for railway loading above 0oC temperature conforms to -- a) IS 2062 grade A b) IS 2062 grade B* c) IS 2062 grade C d) None of the above

Last Answer : b) IS 2062 grade B*

Description : Temporary staging for casting PSC Box Girder for a ROB over the Railway span shall be removed a) after hardening of concrete b) before hardening of concrete c) during concreting d) after stressing the cables

Last Answer : d) after stressing the cables

Description : Demand of water for passengers on railway station is a)10 litres per passenger b)15 litres per passenger c) 20 litres for passenger d) 25 litres per passenger*

Last Answer : d) 25 litres per passenger*

Description : As per new classification of railway accident, floods breaches & land slides’ is classified in the following class (a) Class J (b) Class K (c) Class Q (d) Class R*

Last Answer : (d) Class R*

Description : An accident will be termed as serious accident when the loss of Railway property is more then (a) 3 lacs (b) 10 lacs (c) 25lacs* (d) 15 lacs

Last Answer : (c) 25lacs*

Description : What is the highest post in Railway a. General Manager b. Chief Engineer c. Chairman Railway Board* d. Divisional Railway Manager

Last Answer : c. Chairman Railway Board*

Description : Where is the Head Quarter of Northern Railway a. New Delhi* b. Lucknow c. Mumbai d. Calcutta

Last Answer : a. New Delhi*

Description : What do you mean by RDSO a. Research & Development Standard organisation* b. Railway Development & Standard organisation c. Regional Development & Standard organisation d. None of above

Last Answer : a. Research & Development Standard organisation*

Description : How many divisions in Northern Railway a. 5* b. 4 c. 6 d. 3

Last Answer : a. 5*

Description : The train runs faster on BG than on MG rail because its speed is directly proportional to a) Weight of the train* b) Gauge width c)Policy of Railway Board d) Length of the train

Last Answer : a) Weight of the train*

Description : How many detonators are planted during protection of track for welding site ? (i) One (ii) Two (iii) Three* (iv) None of the above

Last Answer : iii) Three*

Description : Weather protection of track is required during block for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition

Last Answer : (i) Yes.*

Description : hat is the minimum distance between AT Weld and other joint exist in track? (i) 2 Mt. (ii) 3 Mt. (iii) 4 Mt.* (iv) 4.5 Mt.

Last Answer : (iii) 4 Mt.*

Description : In case of a curved track on electrified, double line, BG section a) Duty hut cannot be provided for a level crossing. b) Duty hut should be on the inside of the curve. c) Duty hut should be on the outside of the curve.* d) Duty hut can be provided on any side of the curve.

Last Answer : c) Duty hut should be on the outside of the curve.*

Description : In LWR track on BG a) Level crossing should be separated by providing SEJs b) Level crossing cannot be provided in LWR. c) Level crossing should not fall within the breathing length of LWR* d) Level crossing should be laid with rail free fastenings.

Last Answer : c) Level crossing should not fall within the breathing length of LWR*