A detailed project report of the proposed railway line is made after
(a) Preliminary survey
(b) Reconnaissance survey
(c) Final location survey*
(d) Traffic survey

1 Answer

Answer :

(c) Final location survey*

Related questions

Description : Investigation for important bridges may be carried out in which stage a) Technical feasibility study (reconnaissance survey) b) Techno-economic feasibility study (preliminary engineering survey) c) Detailed survey and project report stage (final location survey) d) All the above *

Last Answer : d) All the above

Description : Which of the following survey are required to be done before the construction of new railway line. (a) Traffic survey (b) Reconnaessarice survey (c) Preliminary survey (d) Final location survey (e) All the above

Last Answer : e) All the above

Description : The purpose of reconnaissance survey (a) To determine technical fenibility of the line* (b) To assess whether such a line is required or not (c) To decide the final alignment of the railway line (d) None of the above

Last Answer : (a) To determine technical fenibility of the line*

Description : Preliminary project report for a road project must contain (A) The detailed estimated cost based on detailed design (B) The several alternatives of the project that have been considered (C ... , traffic survey, concept design and approximate cost (D) The contract documents for inviting tenders

Last Answer : (C) The soil survey, traffic survey, concept design and approximate cost

Description : The project report of the reconnaissance survey should be accompanied by Index map area at a scale of 1 cm = ---- km. (a) 2.5 km* (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km

Last Answer : (a) 2.5 km*

Description : The project report of the reconnaissance survey should be accompanied by a map of the area at a scale of 1 cm= --- km. (a) 2.5 km (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km*

Last Answer : (e) 20.0 km*

Description : The project report of final location survey gives tabulated statement of the following (a) Curve abstract (b) Gradient abstract (c) Bridge abstract (d) Important bridges (e) Station machinery (f) Stations and stations sites (g) All the above*

Last Answer : g) All the above*

Description : The first stage of deciding the alignment of a hill road, is (A) Reconnaissance (B) Detailed survey (C) Trace-out (D) Preliminary survey

Last Answer : Answer: Option A

Description : Traffic survey is done to find out (a) The most promising route for the railway in the area (b) The possible traffic the railway line will carry (c) Standard of railway line to be followed (d) All the above*

Last Answer : d) All the above*

Description : While doing final location survey, the centre line is fully marked with pegs at --- metre distance (a) 10m (b) 20m* (c) 30m (d) 50m

Last Answer : (b) 20m*

Description : The survey instrument used for reconnaissance survey (a) Theodelite & Dumpty level (b) Prismatic compass & Aneriod barometer* (c) All the above (d) None of them

Last Answer : (b) Prismatic compass & Aneriod barometer*

Description : Which of the instruments is not used in Reconnaissance survey. (a) Prismatic compass (b) Dumpy level * (c) Aneroid Barometer (d) Pedometer

Last Answer : (b) Dumpy level *

Description : Which of the instruments is not used in Preliminary survey. (a) Theodelite (b) Tacheometer (c) Dumpy level (d) Plane table (e) None of them*

Last Answer : (e) None of them*

Description : The index map of preliminary report should be to a scale of (a) 1 cm to 0.5 km (b) 1 cm to 1.0 km (c) 1 cm to 2.5 km* (d) 1 cm to 10.0 km

Last Answer : (c) 1 cm to 2.5 km*

Description : Survey of the major projects is done by (a) Chief Engineer (b) Chief Administrative Officer (CAO) construction* (c) Divisional Railway Manager (d) Railway Board

Last Answer : (b) Chief Administrative Officer (CAO) construction*

Description : Pick up the correct statement from the following: (A) During reconnaissance, the general route of the alignment is selected (B) After reconnaissance, a trace is cut for the alignment (C) Last stage is the detailed surveys for desired geometries' of the highway (D) All the above

Last Answer : Answer: Option D

Description : During last phase of the reconnaissance, details of the grade line is recorded on 2 metre poles to indicate (A) Direction of the proposed alignment (B) Distance between the previous and forward pegs (C) Relative elevations of pegs (D) All the above

Last Answer : Answer: Option D

Description : A new railway line is required to be constructed beaus’ of following reasons (a) Strategic and political considerations (b) Development of backward area (c) To shorten existing rail link (d) Any of them*

Last Answer : d) Any of them*

Description : Centre to Centre spacing of formation for double railway line for Broad Gauge is a) 1676 mm b) 4725 mm c) 4265mm d) 5300 mm*

Last Answer : d) 5300 mm*

Description : 1. Which of the statements with regard to formation is correct (1) One of the Functions of the formation is to facilitate drainage (2) Width of bank for double railway line is 12.155 meters (3) Width of cutting for double railway track is 11. ... a) 2, 3, 5 b) 3, 4, 5* c) 2, 3, 4 d) 2, 4, 5

Last Answer : b) 3, 4, 5*

Description : riodicity of recording of camber in PSC girders a) Once in a year* b) Once in two years c) Once in three years d) During the detailed inspection of SE/Br.

Last Answer : a) Once in a year*

Description : Periodicity of Under water inspection a) Once in a year b) Once in two years* c) Whenever high flood occurs d) Along with detailed inspection of SE/Br

Last Answer : b) Once in two years*

Description : The most reliable estimate is (A) Detailed estimate (B) Preliminary estimate (C) Plinth area estimate (D) Cube rate estimate

Last Answer : (A) Detailed estimate

Description : Energy audit can be classified as. a) Preliminary audit. c) Detailed audit. b) Both (a) and (b). d) Only option (a).

Last Answer : Both (a) and (b). 

Description : Energy audit can be classified as. a) Preliminary audit. b) Detailed audit. c) Both (a) and (b). d) Only option (a).

Last Answer : Both (a) and (b). 

Description : The is the simplest and quickest type of audit. a) Detailed audit. b) Energy audit. c) Preliminary audit

Last Answer :       <!-- [endif] -->Preliminary audit.

Description : Reconnaissance is best done with the help of (A) Aerial photographic survey (B) Cadastral surveys (C) Topographical surveys (D) Triangulation surveys

Last Answer : Answer: Option A

Description : Temporary staging for casting PSC Box Girder for a ROB over the Railway span shall be removed a) after hardening of concrete b) before hardening of concrete c) during concreting d) after stressing the cables

Last Answer : d) after stressing the cables

Description : For rolling mark 60 kg/Sail/X/2010 the first testing in the field after initial testing of rails in rail manufacturing plant, will be done. (i) After test free period of 25%. (ii) After passage of every 40 ... period.* (iii) After passage of 200 GMT. (iv) On the basis of annual GMT of the section.

Last Answer : (ii) After passage of every 40 GMT traffic during test free period.*

Description : How many nos. of sleepers should be loosened either side of the proposed weld? (i) 3 sleepers (ii) 5 sleepers.* (iii) 2 sleepers (iv) 4 sleepers

Last Answer : (ii) 5 sleepers.

Description : When proposed depth of construction of a bridge is more than the existing depth of construction in a bridge work, the existing rail level requires a) Lowering b) Lifting* c) Slewing d) None

Last Answer : b) Lifting*

Description : What are the three phases of a security evaluation plan? (Choose three answers.) A. Conduct Security Evaluation B. Preparation C. Conclusion D. Final E. Reconnaissance F. Design Security G. Vulnerability Assessment

Last Answer : A. Conduct Security Evaluation B. Preparation C. Conclusion

Description : What are the three phases of a security evaluation plan? (Choose three answers.) A. Conduct Security Evaluation B. Preparation C. Conclusion D. Final E. Reconnaissance F. Design Security G. Vulnerability Assessment

Last Answer : A. Conduct Security Evaluation B. Preparation C. Conclusion

Description : What are the three phases of a security evaluation plan? (Choose three answers.) ∙ A. Conduct Security Evaluation ∙ B. Preparation ∙ C. Conclusion ∙ D. Final ∙ E. Reconnaissance ∙ F. Design Security ∙ G. Vulnerability Assessment

Last Answer : A. Conduct Security Evaluation B. Preparation C. Conclusion

Description : In how many time final grinding should be done of new AT weld ? (i) Just after the welding (ii) After 8 hrs of welding (iii) With in 24 hrs* (iv) None of the above

Last Answer : iii) With in 24 hrs*

Description : Urinals & Latrines for A & B stations as norms for recommended level of facilities for railway station (a) Ndb/500 (b) Ndb/300 (c) Ndb/200* (d) None of the above

Last Answer : (c) Ndb/200*

Description : A Railway Stations is provided for the following purpose (a) To entrain or detrain the passengers (b) To load or off load the goods or parcels (c) To enable the faster trains to overtake the slower trains (d) All the above*

Last Answer : d) All the above*

Description : Sewerage system of a railway colony may be (a) Combined system (b) Separate system (c) Partially combined system (d) Any of them*

Last Answer : (d) Any of them*

Description : Which of the following stone is best suited for construction of piers and abutments of Railway Bridge a) Granite* b) Sandstone c) Limestone d) Quartzite

Last Answer : a) Granite*

Description : Stone generally preferred for railway ballast is a) Sandstone b) Dolomite c) Marble d) Basalt or trap granite*

Last Answer : d) Basalt or trap granite*

Description : For laying a Railway track the prepared surface ready to receive the ballast is called a) Sub ballast b) Formation* c) Blanket d) Cushion

Last Answer : b) Formation*

Description : arthwork in embankment for railway with manual compaction should be done in layers not exceeding-------------- a) 15 centimeter b) 20 centimeters c) 25 centimeters d) 30 centimeters*

Last Answer : d) 30 centimeters*

Description : On Indian Railways a new level crossing can be provided with the approval of a) Chief engineer b) General Manager c) Commissioner of Railway Safety d) None of the above*

Last Answer : d) None of the above

Description : Speed breaker of approved design shall be provided on either side of level crossing at ------ within Railway boundary a) 5 meters b) 15 meters c) 20 meters* d0 30 meters

Last Answer : c) 20 meters

Description : Speed breaker has to be provided on road approaches of level crossing at maximum feasible distance within Railway boundary but not exceeding a) 10 meters b) 15 meters c) 20 meters* d) 200 meters

Last Answer : c) 20 meters*

Description : When the railway crosses a deep vally without perinial water,it is called……. a)Aqueduct * b)Cause way c)Via-duct d)River crossing

Last Answer : a)Aqueduct *

Description : RBG loading stands for a)Revised Broad gauge loading b) Rolling Broad gauge loading c)Railway Broad gauge loading d) None of above

Last Answer : a)Revised Broad gauge loading

Description : For railway bridges with spans in excess of 30.5m, generally provided with a) deck type girders b) open web through girders* c) semi through girders d) shallow type girders

Last Answer : b) open web through girders*

Description : Temporary arrangements for rebuilding of Railway bridges can be executed by providing a) Temporary girder b) Temporary diversion c) Any of the above* d) None of the above

Last Answer : c) Any of the above*

Description : tructural steel for railway loading above 0oC temperature conforms to -- a) IS 2062 grade A b) IS 2062 grade B* c) IS 2062 grade C d) None of the above

Last Answer : b) IS 2062 grade B*