1. Which of the statements with regard to formation is correct
(1) One of the Functions of the formation is to facilitate drainage
(2) Width of bank for double railway line is 12.155 meters
(3) Width of cutting for double railway track is 11.750 meters
(4) Centre to centre of formation for double line is 4.725 meters
(5) Width of formation is different for concrete sleeper track and other than concrete sleeper  track
a) 2, 3, 5
b) 3, 4, 5*
c) 2, 3, 4  
d) 2, 4, 5

1 Answer

Answer :

b) 3, 4, 5*

Related questions

Description : Formation width for bank for B.G. double line section is (a) 10.82 m (b) 11.0 m (c) 11.58 m (d) 12.155 m*

Last Answer : (d) 12.155 m*

Description : The recommended width of Double line cutting formation for B G is a) 10210 mm b) 10 975 mm c) 11555 mm* d) 10 820 mm

Last Answer : c) 11555 mm*

Description : Centre to Centre spacing of formation for double railway line for Broad Gauge is a) 1676 mm b) 4725 mm c) 4265mm d) 5300 mm*

Last Answer : d) 5300 mm*

Description : The centre to centre spacing formation width for double line section is (a) 4725 mm (b) 5025 (c) 5330* (d) 5500

Last Answer : c) 5330*

Description : Formation width for bank for M.G. double line section is (a) 8.50 m (b) 8.84 m (c) 9.65 m (d) 9.81 m*

Last Answer : (d) 9.81 m*

Description : Stop boards on either side of approaches of all unmanned level crossings shall be provided at -------------from the centre line of nearest track. a) 3meters b) 5 meters* c) 6 meters d) 10 meters

Last Answer : b) 5 meters*

Description : Minimum distance of gate post from centre line of nearest track on BG is a) 2 meters b) 3 meters* c) 4 meters d) 5 meters

Last Answer : b) 3 meters*

Description : For new lines, width of formation in cutting for N.G. single line is (a) 3.35 m* (b) 3.70 m (c) 5.25 m (d) 5.85 m

Last Answer : a) 3.35 m*

Description : For new lines, width of formation in cutting for M.G. single line is (a) 5.25 m* (b) 5.85 m (c) 6.25 m (d) 6.85 m

Last Answer : (a) 5.25 m*

Description : Minimum distance of duty hut from centre line of nearest track on BG is a) 2 meters b) 3 meters c) 4 meters d) 6 meters*

Last Answer : d) 6 meters*

Description : The recommended width of Single line formation cutting for BG excluding drain is a) 6250 mm* b) 6850mm c) 54 90mm d) 6100mm

Last Answer : a) 6250 mm*

Description : Number of Elastic clips used for one K to BG single line section having 13 length & concrete sleepers of M+7 sleeper density are (a) 5280 (b) 6160* (c) 6250 (d) 6500

Last Answer : (b) 6160*

Description : Lowest level of staff/supervisor competent for packing or renewal of single isolated sleeper not requiring lifting or slewing of track in LWR/CWR. a. PWI b. Keyman c. Gangmate* d. PWS

Last Answer : c. Gangmate*

Description : In M+7 sleeper density, how many sleepers are there in a km Track. a. 1660 nos b. 1540 nos.* c. 1310 nos. d. 1440 nos.

Last Answer : b. 1540 nos

Description : On an unmanned level crossing stop board should be provided at a distance of --------- from the centre of nearest track a) 5 meters * b) 6 meters c) 3 meters d) 7.5 meters

Last Answer : a) 5 meters

Description : For new lines, width of formation in bank for N.G single line is (a) 3.35 m (b) 3.70 m* (c ) 5.25 m (e) 5.85 m

Last Answer : b) 3.70 m*

Description : For new lines, width of formation in bank for M.G. single line is (a) 5.25 m (b) 5.85 m* (c ) 6.25 m (e) 6.85 m

Last Answer : (b) 5.85 m*

Description : For laying a Railway track the prepared surface ready to receive the ballast is called a) Sub ballast b) Formation* c) Blanket d) Cushion

Last Answer : b) Formation*

Description : With regard to standard of quality of drinking water as laid down by Indian Railway , the requirement (desirable) limit of total dissolved solids should not be more than---------- mg/l a)200 b) 300 c) 400

Last Answer : d) 500*

Description : Number of sleepers required having sleeper density of M+7 for one Km of BG single line is (a) 1360 (b) 1540* (c) 1660 (d) None of the above

Last Answer : (b) 1540*

Description : A train travelling at 36 kmph completely crosses another train having half its length and travelling in the opposite direction at 54 kmph, in 12 seconds. If it also passes a railway platform in 112 minutes, the length ... is : a) 560 metres b) 620 metres c) 700 meres d) 750 metres e) 720 meters

Last Answer : Answer: c)

Description : Formation width for cuttings for B.G. single line section is (a) 5.40 m (b) 6.20 m (c) 6.25 m* (d) 6.50 m

Last Answer : (c) 6.25 m*

Description : For protection of level crossing gate in an emergency on BG double line the Gateman should place one detonator at one place and 3 detonators at a subsequent place at a distance of ------- a) and------ ... c) 500 meters and 1000 meters d) 600 meters and 1200 meters* e) 800 meters in 1500 meters

Last Answer : d) 600 meters and 1200 meters*

Description : In case of a curved track on electrified, double line, BG section a) Duty hut cannot be provided for a level crossing. b) Duty hut should be on the inside of the curve. c) Duty hut should be on the outside of the curve.* d) Duty hut can be provided on any side of the curve.

Last Answer : c) Duty hut should be on the outside of the curve.*

Description : The minimum track centres in B.G. double line is (a) 4500 mm (b) 4750 mm (c) 5000 mm (d) 5300 mm*

Last Answer : (d) 5300 mm*

Description : Cross slope of the formation to have good drainage of Ballast section is a) 1 in 40* b) 1 in 50 c) 1 in 30 d) 1 in 20

Last Answer : a) 1 in 40*

Description : Minimum length of check rail for square crossing shall be -------- more than the width of gate a) 1 meters b) 2 meters* c) 3 meters d) 5 meters

Last Answer : b) 2 meters*

Description : Formation width for banks for B.G. single line section is (a) 6.10 m (b) 6.50 m (c) 6.85 m* (d) 7.0 m

Last Answer : (c) 6.85 m*

Description : The train runs faster on BG than on MG rail because its speed is directly proportional to a) Weight of the train* b) Gauge width c)Policy of Railway Board d) Length of the train

Last Answer : a) Weight of the train*

Description : Speed breaker of approved design shall be provided on either side of level crossing at ------ within Railway boundary a) 5 meters b) 15 meters c) 20 meters* d0 30 meters

Last Answer : c) 20 meters

Description : Speed breaker has to be provided on road approaches of level crossing at maximum feasible distance within Railway boundary but not exceeding a) 10 meters b) 15 meters c) 20 meters* d) 200 meters

Last Answer : c) 20 meters*

Description : .In Indian Railway how many Gauges of Track has been adopted a. 1 b. 3* c. 2 d. 4

Last Answer : b. 3*

Description : Sleeper density for group ‘A’ route with traffic density more than 20 GMT is:- (a) 1560 sleepers/ Km. (b) 1660 sleepers/ Km.* (c) 1540 sleepers/ Km. (d) 1340 sleepers/ Km.

Last Answer : (b) 1660 sleepers/ Km.*

Description : On Broad gauge tracks whistle indicator shall be provided at a distance of ---------- from level crossing along the track a) 400 meters b) 600 meters* c) 350 meters d) 500 meters

Last Answer : b) 600 meters*

Description : Minimum length of steel channel sleeper in BG a) 2500mm b) 2440mm* c) 2400mm d) 2600mm

Last Answer : b) 2440mm*

Description : Min. sleeper density in case of semi permanent diversion- (a) (m + 2) (b) (m + 3)* (c) (m + 4) (d) ( m + 7 )

Last Answer : (b) (m + 3)*

Description : Minimum depth of ballast cushion below the bottom of sleeper at the rail seat on BG group A route should be :- (a) 350 mm. (b) 250 mm. (c) 300 mm.* (d) 325 mm.

Last Answer : (c) 300 mm.*

Description : “Composite sleeper index” is employed to determine a) sleeper density requirement b) number of fixtures required for a particular type of sleeper c) durability of sleeper d) mechanical strength of wooden sleepers and thereby gives its suitability as to be used as li sleepers.*

Last Answer : d) mechanical strength of wooden sleepers and thereby gives its suitability as to be used as li sleepers.*

Description : Temporary staging for casting PSC Box Girder for a ROB over the Railway span shall be removed a) after hardening of concrete b) before hardening of concrete c) during concreting d) after stressing the cables

Last Answer : d) after stressing the cables

Description : The minimum horizontal distances form centre of track to face of passenger platform coping for B.G. is ……. Mm (A) 1650 MM. (B) 1670 MM* (C)1676 MM (D) 1685 MM

Last Answer : (B) 1670 MM*

Description : The minimum centre to centre distance of a B.G. track in mid-section is ……….. mm (a) 4200 (b) 4265* (C) 4350 (d) 4000

Last Answer : (b) 4265*

Description : The catch water drains are provided in the a) Formation in the embankment b) Formation in cutting* c) Zero fills formation d) Steep gradient

Last Answer : b) Formation in cutting*

Description : The side slope of formation in embankment /cutting depends on a) Shearing strength of soil and its angle of repose* b) Angle of repose c) Bearing capacity of the soil d) Optimum moisture content of the soil

Last Answer : a) Shearing strength of soil and its angle of repose*

Description : UCC is abbreviated for (a) Uncontrolled cement concrete (b) Unified Control Command (c) Unified Command Centre* (d) none of them

Last Answer : (c) Unified Command Centre*

Description : Bentonite is used in pile driving -- a) to facilitate pile driving b) to enable proper pile concreting c) to stabilize the bore hole walls* d) None of the above

Last Answer : c) to stabilize the bore hole walls*

Description : Fish plated joint shall be avoided in check raisl and on the running rails within--------- from the end of level crossing a) 3 meters* b) 5 meters c) 10 meters d) 12 meters

Last Answer : a) 3 meters*

Description : How many zones are in Indian railway a. 8 b. 10 c. 16* d. 12

Last Answer : c. 16*

Description : Pick up the incorrect statement from the following: (A) Tresguet did not provide the top camber for the drainage of surface water (B) Tresguet provided the top camber for the drainage of surface ... (D) Macadam provided a camber to the formation at the dug-up state, to drain percolated water

Last Answer : Answer: Option A

Description : The size of a plane table is (a) 750mm x 900 mm (b) 600mm x 750 mm* (c) 450mm x 600 mm

Last Answer : (b) 600mm x 750 mm*

Description : In cement pressure grouting holes should be drilled at spacing in both direction at a) 150 – 500 mm b) 450 mm c) 500 – 750 mm* d) 1000 mm