Description : Speed breaker has to be provided on road approaches of level crossing at maximum feasible distance within Railway boundary but not exceeding a) 10 meters b) 15 meters c) 20 meters* d) 200 meters
Last Answer : c) 20 meters*
Description : On Broad Gauge tracks Banner flag at a level crossing shall be provided at a distance of--- ---------- from ends of check rail before opening the gate for road traffic. a) 5 meters* b) 3 meters c) 6 meters d) 30 meters
Last Answer : a) 5 meters*
Description : Stop boards on either side of approaches of all unmanned level crossings shall be provided at -------------from the centre line of nearest track. a) 3meters b) 5 meters* c) 6 meters d) 10 meters
Last Answer : b) 5 meters*
Description : On Broad gauge tracks whistle indicator shall be provided at a distance of ---------- from level crossing along the track a) 400 meters b) 600 meters* c) 350 meters d) 500 meters
Last Answer : b) 600 meters*
Description : Fish plated joint shall be avoided in check raisl and on the running rails within--------- from the end of level crossing a) 3 meters* b) 5 meters c) 10 meters d) 12 meters
Last Answer : a) 3 meters*
Description : There should not be any combination joint on level crossing proper and its approaches up to a) 15 meters b) 30 meters c) 40 meters d) 50 meters
Last Answer : d) 50 meters
Description : On an unmanned level crossing stop board should be provided at a distance of --------- from the centre of nearest track a) 5 meters * b) 6 meters c) 3 meters d) 7.5 meters
Last Answer : a) 5 meters
Description : On Indian Railways a new level crossing can be provided with the approval of a) Chief engineer b) General Manager c) Commissioner of Railway Safety d) None of the above*
Last Answer : d) None of the above
Description : Indication post for detonator should be provided at a distance of ---------meter and --------- meter for BG level crossing a) 400 meters in 800 meters b) 500 meters and 1200 meters c) 600 meters and 1200 meter * d)600 meters and 1000 meters
Last Answer : c) 600 meters and 1200 meter *
Description : In case of Shot Welded Rails the fish plated joint should be avoided on Level Crossings within a distance of --------- from end of level crossing a) 3 meters b) 4 meters c) 5 meters d) 6 meters*
Last Answer : d) 6 meters*
Description : Minimum length of check rail for square crossing shall be -------- more than the width of gate a) 1 meters b) 2 meters* c) 3 meters d) 5 meters
Last Answer : b) 2 meters*
Description : In LWR track on BG a) Level crossing should be separated by providing SEJs b) Level crossing cannot be provided in LWR. c) Level crossing should not fall within the breathing length of LWR* d) Level crossing should be laid with rail free fastenings.
Last Answer : c) Level crossing should not fall within the breathing length of LWR*
Description : In case of a curved track on electrified, double line, BG section a) Duty hut cannot be provided for a level crossing. b) Duty hut should be on the inside of the curve. c) Duty hut should be on the outside of the curve.* d) Duty hut can be provided on any side of the curve.
Last Answer : c) Duty hut should be on the outside of the curve.*
Description : The Height Gauge for a level crossing should be located at least --------- from the gate post a) 3 meters b) 5 meters c) 8 meters* d) 10 meters
Last Answer : c) 8 meters*
Description : The rail joint should be located at ----------- from the end of level crossing a) 2 meters b) 3 meters * c) 5 meters d)6 meters
Last Answer : b) 3 meters
Description : For protection of level crossing gate in an emergency on BG double line the Gateman should place one detonator at one place and 3 detonators at a subsequent place at a distance of ------- a) and------ ... c) 500 meters and 1000 meters d) 600 meters and 1200 meters* e) 800 meters in 1500 meters
Last Answer : d) 600 meters and 1200 meters*
Description : Frequency of overhauling for a level crossing with PRC sleepers shall be a) Every year c) Every 2 years* c) Every 3 years d) Every 5 years
Last Answer : c) Every 2 years*
Description : Traffic census at a level crossing shall be done by a) A team of SSE/ P Way and SSE/ Works b) A team of SSE/ P Way and Traffic inspector c) A team of SSE/ P Way and Signal Inspector d) A multidisciplinary team of SSE/ P Way, Signal Inspector and Traffic Inspector*.
Last Answer : d) A multidisciplinary team of SSE/ P Way, Signal Inspector and Traffic Inspector*.
Description : arthwork in embankment for railway with manual compaction should be done in layers not exceeding-------------- a) 15 centimeter b) 20 centimeters c) 25 centimeters d) 30 centimeters*
Last Answer : d) 30 centimeters*
Description : For railway bridges with spans in excess of 30.5m, generally provided with a) deck type girders b) open web through girders* c) semi through girders d) shallow type girders
Last Answer : b) open web through girders*
Description : When the railway crosses a deep vally without perinial water,it is called……. a)Aqueduct * b)Cause way c)Via-duct d)River crossing
Last Answer : a)Aqueduct *
Description : Points & Crossing is laid at a cant of a. 1 in 20 b. 1 in 10 c. 1 in 15 d. NIL*
Last Answer : d. NIL*
Description : In case of water crossing danger level in bridges a) speed restriction be imposed b) traffic be suspended till water recedes c) traffic be suspended till a responsible person inspects the site and declares it safe for running traffic* d) bridge watchman is to be posted
Last Answer : c) traffic be suspended till a responsible person inspects the site and declares it safe for running traffic*
Description : The maximum permissible speed recommended for Indian Railways for 1 in 8 and half crossing is a)16 kmph* b) 20 kmph c)24 kmph
Last Answer : a)16 kmph*
Description : 1. Which of the statements with regard to formation is correct (1) One of the Functions of the formation is to facilitate drainage (2) Width of bank for double railway line is 12.155 meters (3) Width of cutting for double railway track is 11. ... a) 2, 3, 5 b) 3, 4, 5* c) 2, 3, 4 d) 2, 4, 5
Last Answer : b) 3, 4, 5*
Description : The bottom of side drains should be below the formation level by at least------------ a) 45 cm b )30 cm* c) 15 cm d) 60 cm
Last Answer : b )30 cm*
Description : Demand of water for passengers on railway station is a)10 litres per passenger b)15 litres per passenger c) 20 litres for passenger d) 25 litres per passenger*
Last Answer : d) 25 litres per passenger*
Description : Temporary staging for casting PSC Box Girder for a ROB over the Railway span shall be removed a) after hardening of concrete b) before hardening of concrete c) during concreting d) after stressing the cables
Last Answer : d) after stressing the cables
Description : The danger level should be marked with a bright red band …… wide centrally over a white band …… wide for a length of……… a) 5 cm, 10 cm, 60 cms* b) 10 cm, 20 cm, 60 cm c) 15 cm, 30 mm, 60 cm d) None of the above
Last Answer : a) 5 cm, 10 cm, 60 cms*
Description : Flat tyre causes maximum damage at a speed of (a) 90 to 100 kmph (b) 25 to 30 kmph* (c) 10 to 15 kmph (d) 15 to 20 kmph
Last Answer : (b) 25 to 30 kmph*
Description : Density of each compacted layer should be ascertained by taking soil samples on either side of Central Line at a) 5 meter interval b) 10 meter interval* c) 12 meter interval d) 15 meter internal
Last Answer : b) 10 meter interval*
Description : In a temporary signaling arrangements for a bridge work in BG section, speed board shall be placed in advance of 30 m from the a) C.L. of the bridge b) Termination Board c) Start of the bridge/work spot* d) Caution Board
Last Answer : c) Start of the bridge/work spot*
Description : A Railway Stations is provided for the following purpose (a) To entrain or detrain the passengers (b) To load or off load the goods or parcels (c) To enable the faster trains to overtake the slower trains (d) All the above*
Last Answer : d) All the above*
Description : Rails used for A T Welding shall not normally be welded? (i) 20 years old . (ii) 30 years old (iii) 40 years old (iv) 50 years old*
Last Answer : iv) 50 years old*
Description : A level crossing qualifies for construction of Road Over Bridge/ Under Bridge on Cost sharing basis with State Government when the Train Vehicle Unit is more than a) 50,000 b) 1, 00,000* c) 3, 00,000 d) 5, 00,000
Last Answer : b) 1, 00,000*
Description : Number of taps to be provided on ‘A’ category stations on each platform as per norms of minimum essential facilities are (a) 20 taps (b) 15 taps (c) 12 taps* (d) One taps for each bogie
Last Answer : (c) 12 taps*
Description : Surface preparation for Metallising the abrasives used for final cleaning is a) Chilled iron grit G.24, as defined in BS : 2451 b) Washed salt free angular silica sand of mesh size 12 to 30 with a minimum of 40% retained on a 20 mesh c) either (a) or (b) * d) d) neither (a) or (b)
Last Answer : c) either (a) or (b) *
Description : The Assistant Divisional Engineer should inspect the equipment at every manned level crossing on the subdivision once in a) 2 months b) 3 months c) 4 months d) 6 months*
Last Answer : d) 6 months
Description : Level crossing is classified on the basis of a) Class of road b) TVU* c) Volume of road traffic d) Volume of rail traffic
Last Answer : b) TVU*
Description : The frequency of census at a level crossing having TVU between 75000 to 1 lakh will be once a) In 2 years b) In 3 years* c) In 4 years d) Every year
Last Answer : b) In 3 years*
Description : Level Crossing beyond the outermost stop signals is called a) Engineering Gate* b) Traffic Gate c) Engineering and Signal Gate d) Signal Gate
Last Answer : a) Engineering Gate
Description : Minimum clearance of check rails for B.G. at level crossing should be (a) 48mm (b) 57mm (c) 51mm* (d) 44mm
Last Answer : (c) 51mm*
Description : On B.G. maximum clearances of check rails at a level crossing are (a) 51 mm (b) 57mm* (c) 65mm (d) 70mm
Last Answer : (b) 57mm*
Description : Maximum clearance of check rails at level crossing for B.G. should be (a) 48mm (b) 57mm* (c) 51mm (d) 44mm
Description : On B.G. maximum clearances of check rails at a level crossing are (a) 51mm ( b ) 57mm* (c) 65mm (d) 54mm
Last Answer : ( b ) 57mm*
Description : .Minimum check rail clearance at Level crossing a. 45 mm b. 51 mm* c. 50 mm d. 57 mm
Last Answer : b. 51 mm*
Description : DFWR weld shall be replaced. (i) Within 2 months of detection. (ii) Within 1 year of detection. (iii) Within 3 months of detection.* (iv) after 3 days of detection.
Last Answer : (iii) Within 3 months of detection.*
Description : An accident will be termed as serious accident when the loss of Railway property is more then (a) 3 lacs (b) 10 lacs (c) 25lacs* (d) 15 lacs
Last Answer : (c) 25lacs*
Description : What is the Highest speed of train in Indian Railway a. 140 KMPH b. 120 kmph c. 160 kmph* d. 130 kmph
Last Answer : c. 160 kmph*
Description : The train runs faster on BG than on MG rail because its speed is directly proportional to a) Weight of the train* b) Gauge width c)Policy of Railway Board d) Length of the train
Last Answer : a) Weight of the train*