The spacing of tube wells should generally be more than ----------from the circle of influence  a)10 metre  
b)50 metre
c)100 metre*
d) 500 metre

1 Answer

Answer :

c)100 metre*

Related questions

Description : In cement pressure grouting holes should be drilled at spacing in both direction at a) 150 – 500 mm b) 450 mm c) 500 – 750 mm* d) 1000 mm

Last Answer : c) 500 – 750 mm*

Description : Requirement of water for apron washing a. 5 litre per square metre per day b. 10 litre per square metre per day * c. 15 litre per square metre per day d. 20 litre per square metre per day

Last Answer : b. 10 litre per square metre per day *

Description : Requirement of water for platform washing is a)5 litre per square metre per day * b)10 litre per square meter per day c) 15 litre per square metre per day d)20 litre per square metre per day

Last Answer : a)5 litre per square metre per day *

Description : If At is the area of steel cross-section, t is working stress, L is width of road and W is weight of slab per square metre, the spacing of the tie bars for a longitudinal joint, is (A) (100 At × t)/WL (B) 100 At/tWL (C) (100 WAt × t)/tL (D) 100 WL/At t

Last Answer : Answer: Option D

Description : The gradient of a platform is generally (a) 1 in 1000 (b) 1 in 750 (c) 1 in 500* (d) 1 in 250

Last Answer : (c) 1 in 500*

Description : centre to centre spacing of pile should not be more than __where d is the dia of pile shaft

Last Answer : 4d

Description : Spacing of Trolley refuges a) Every 100m b) If span is more than 100m, on each pier c) Ballasted deck bridges – every 50m d) All the above*

Last Answer : d) All the above*

Description : While doing final location survey, the centre line is fully marked with pegs at --- metre distance (a) 10m (b) 20m* (c) 30m (d) 50m

Last Answer : (b) 20m*

Description : In new Rail as well as second hand rails how much end bends of the rails in lateral direction are permitted when checked with one metre straight edge before welding? (i) ± 0.2 mm in lateral direction (ii) ± 0.3 mm in lateral direction (iii) ± 0.5 mm in latera

Last Answer : (iii) ± 0.5 mm in latera

Description : RBG loading caters for maaaaximum axle load of…….tones for locomotive with trailing loadof…… tonnes/metre of track with maximum axle load of…….tonnes for wagons a)22.9,7.67,25 b)22.5,7.67,22.9* c)25,7.67,22.9, d)None of above

Last Answer : b)22.5,7.67,22.9*

Description : GML loading caters for maaaaximum axle load of…….tonnes for locomotive with trailing load of………tonnes/metre. a)22.9,7.67* b)22.5,7.67 c)25,7.67 d)None of above

Last Answer : a)22.9,7.67*

Description : The main drawback of centrifugal pump is a)necessity of priming b) discharge from pump varies with the load of water c) For high heads efficiency is low up to 50% d) the suction lift is limited to 6 metre e) all of the above*

Last Answer : e) all of the above*

Description : While taking sample of water from well, sample is collected a)About 2 metre above the bottom of wel b) About 1 metre above the bottom of well * c)About 1 metres below the bottom of well d) none of the above

Last Answer : b) About 1 metre above the bottom of well *

Description : Specific yield of well is a) Discharge per unit time b) Yield of well per metre of drawdown* c) Velocity of water per unit time d)None of the above

Last Answer : b) Yield of well per metre of drawdown*

Description : Used for irrigating extremely large area up to 500 hectares. . (A) Unlined wells (b) Lined wells (c) Tube wells. (d) Tanks.

Last Answer : (c) Tube wells.

Description : The centre to centre spacing formation width for double line section is (a) 4725 mm (b) 5025 (c) 5330* (d) 5500

Last Answer : c) 5330*

Description : Centre to Centre spacing of formation for double railway line for Broad Gauge is a) 1676 mm b) 4725 mm c) 4265mm d) 5300 mm*

Last Answer : d) 5300 mm*

Description : For end bearing piles, the minimum spacing of piles of diameter ‘d’ shall be a) 3d b) 2d c) 2.5d* d) 5d

Last Answer : c) 2.5d*

Description : Free board given in septic tank is about (a) 100 mm (b) 200 mm (c) 300 mm* (d) 500 mm

Last Answer : (c) 300 mm*

Description : Maximum tilt specified during sinking of well foundation is a) 1 in 10 b) 1 in 50 c) 1 in 100* d) 1 in 150

Last Answer : c) 1 in 100*

Description : The ratio of maximum cant e and gauge G in India is about a)1 / 100 b) 1 / 50 c)1 /10* d) 1 / 25

Last Answer : c)1 /10*

Description : Maximum distance apart of trolley refuges on bridges with main spans of 100metre or more is i. 50 mtr j. 100 mtr k. 200 mtr l. a refuge over each pair*

Last Answer : l. a refuge over each pair*

Description : In Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 6.10 < 12.2 m a) 300 mm b) 600 mm c) 450 mm* d) 500 mm

Last Answer : c) 450 mm*

Description : Number of subdivisions per metre length of a levelling staff is  (A) 100  (B) 200  (C) 500  (D) 1000 

Last Answer : (B) 200 

Description : One cubic metre of water weighs (A) 100 litres (B) 250 litres (C) 500 litres (D) 1000 litres

Last Answer : Answer: Option D

Description : The radius of curvature of the arc of the bubble tube is generally kept (A) 10 m (B) 25 m (C) 50 m (D) 100 m

Last Answer : (D) 100 m

Description : How much rail ends are cleaned with Kerosene Oil and steel wire brush? (i) Minimum 100 mm both side (ii) Minimum 50 mm both side.* (iii) No need (iv) As decided by site supervisor

Last Answer : (ii) Minimum 50 mm both side.*

Description : What is the validity of Provisional competency certificate? (i) Valid for executing 50 joints or six months whichever is earlier. (ii) Valid for executing 100 joints or six months whichever is earlier.* (iii) Valid for executing 50 joints. (iv) Valid for six months

Last Answer : (ii) Valid for executing 100 joints or six months whichever is earlier.*

Description : In case of LWR track, full ballast section as specified in LWR Manual should be provided up to ……….. from the bridge abutment. a) 200 m b) 50 m c) 300 m d) 100 m*

Last Answer : d) 100 m

Description : Permissible creep in track is m. 50 mm n. 100 mm o. 125 mm p. 150 mm.*

Last Answer : p. 150 mm.*

Description : An important bridge is one which has total waterway of equal to or more than a) 1000 sq.metres.* b) 800 sq. metres c) 500 sq. metres d) 300 sq. metres

Last Answer : a) 1000 sq.metres.*

Description : With regard to standard of quality of drinking water as laid down by Indian Railway , the requirement (desirable) limit of total dissolved solids should not be more than---------- mg/l a)200 b) 300 c) 400

Last Answer : d) 500*

Description : The capacity of high level flushing cistern is generally (a) 7.5 ltrs. (b) 10 ltrs.* (c) 12.5 ltrs. (d) None of these

Last Answer : b) 10 ltrs.*

Description : Marking of DFWO weld is. (i) Two red point circle on both faces of weld.* (ii) Two red point cross on both faces of weld. (iii) One red point circle on both faces of weld. (iv) None of the above.

Last Answer : i) Two red point circle on both faces of weld.*

Description : The average threshing outrun of a paddy in kg/hr is (A) 500 (B)650 (C)800 (D)1000

Last Answer : (B)650

Description : Urinals & Latrines for A & B stations as norms for recommended level of facilities for railway station (a) Ndb/500 (b) Ndb/300 (c) Ndb/200* (d) None of the above

Last Answer : (c) Ndb/200*

Description : The frequency of a wave travelling at a speed of 500 ms-1 is 25 Hz. Its time period will be ______. (i) 20 s (ii) 0.05 s (iii) 25 s (iv) 0.04 s

Last Answer : (iv) 0.04 s

Description : What is Pre Heating Temperature of rail ends in AT Welding? (i) 300 ± 20oC (ii) 400 ± 20oC (iii) 500 ± 20oC (iv) 600 ± 20oC *

Last Answer : (iv) 600 ± 20oC *

Description : Number of bricks required for 1 cubic meter of brick masonry is a)400 b) 450 c) 500* d) 550

Last Answer : c) 500*

Description : On Broad gauge tracks whistle indicator shall be provided at a distance of ---------- from level crossing along the track a) 400 meters b) 600 meters* c) 350 meters d) 500 meters

Last Answer : b) 600 meters*

Description : For protection of level crossing gate in an emergency on BG double line the Gateman should place one detonator at one place and 3 detonators at a subsequent place at a distance of ------- a) and------ ... c) 500 meters and 1000 meters d) 600 meters and 1200 meters* e) 800 meters in 1500 meters

Last Answer : d) 600 meters and 1200 meters*

Description : Indication post for detonator should be provided at a distance of ---------meter and --------- meter for BG level crossing a) 400 meters in 800 meters b) 500 meters and 1200 meters c) 600 meters and 1200 meter * d)600 meters and 1000 meters

Last Answer : c) 600 meters and 1200 meter *

Description : What is the clear distance between two consecutive steel channel sleepers on Girder bridges? (a) 450 mm* (b) 510 mm (c) 500 mm (d) 460 mm

Last Answer : (a) 450 mm*

Description : What is the clear distance between two consecutive bridge Timbers or Girder bridge? (a) 450 mm (b) 510 mm* (c) 500 mm (d) 520 mm

Last Answer : (b) 510 mm*

Description : n Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 12.20 < 30.5 m a) 300 mm b) 600 mm* c) 500 mm d) 450 mm

Last Answer : b) 600 mm*

Description : Clear distance between consecutive sleepers not to exceed on bridges in BG is a) 450 mm* b) 600 mm c) 510 mm d) 500 mm

Last Answer : a) 450 mm*

Description : In cement pressure grouting G.I pipes of diameter …… and ……length, should be fixed in drilled holes a) 12 to 20 mm, 200 mm* b) 12 to 20 mm, 300 mm c) 12 to 25 mm, 500 mm d) 20 to 25 mm, 300 mm

Last Answer : a) 12 to 20 mm, 200 mm*

Description : The maximum gradient in station yards should be ……. Unless special safely devices are adopted and/or special rules enforced. (a) 1 in 400* (B) 1 in 500 (c) 1 in 1000 (D) 1 In 600

Last Answer : (a) 1 in 400*

Description : What is the assessed GMT service life of 52 kg 90 UTS rail. a. 650 GMT b. 600 GMT c. 525 GMT* d. 500 GMT

Last Answer : c. 525 GMT*

Description : What is the assessed GMT service life of 60 kg 90 UTS rail? a. 650 GMT b. 600 GMT c. 800 GMT* d. 500 GMT

Last Answer : c. 800 GMT*