Flat tyre causes maximum damage at a speed of
(a) 90 to 100 kmph
(b) 25 to 30 kmph*
(c) 10 to 15 kmph
(d) 15 to 20 kmph

1 Answer

Answer :

(b) 25 to 30 kmph*

Related questions

Description : Speed restrictions is suggested for distressed bridges on Group II a) upto maximum of 15 kmph b) 25 kmph to 50 kmph* c) 75 kmph d) 60 kmph

Last Answer : b) 25 kmph to 50 kmph*

Description : Speed restrictions is suggested for distressed bridges on Group I a) upto maximum of 15 kmph* b) 25 kmph c) 50 kmph

Last Answer : a) upto maximum of 15 kmph*

Description : Permissible speed of Turnout with 1 in 8.5 curved switches a. 40 kmph b. 25 kmph* c. 15 kmph d. 20 kmph

Last Answer : b. 25 kmph*

Description : Permissible speed of Turnout with 1 in 12 curved switches a. 40 kmph* b. 25 kmph c. 15 kmph d. 20 kmph

Last Answer : a. 40 kmph*

Description : Minimum speed restriction to be imposed for Track renewal is:- (a) Stop dead & 10 Kmph (b) 10 Kmph (c) 15 Kmph (d) 20 Kmph*

Last Answer : (d) 20 Kmph*

Description : Speed restriction required for using CC cribs as temporary arrangement is a) 20 kmph* b) 40 kmph c) 35 kmph d) 30 kmph

Last Answer : a) 20 kmph*

Description : The maximum permissible speed recommended for Indian Railways for 1 in 8 and half crossing is a)16 kmph* b) 20 kmph c)24 kmph

Last Answer : a)16 kmph*

Description : A motor bike tyre has two punctures. The 1st puncture alone would have made the tyre flat in 27 minutes and the 2nd alone would have done it in 18 minutes. If air leaks out at a constant rate, how long does it take ... flat? a) 20 4/3 minutes b) 15 4/7 minutes c) 10 4/5 minutes d) 25 4/3 minutes

Last Answer : C 1st puncture made the tyre flat in 27 mins 2nd puncture made the tyre flat in 18 mins 1 minute’s work of both the punctures = (1/27 + 1/18) =(2+3)/54 =5/54 So, both the punctures will make the tyre flat in 54/5 mins =>10 4/5 minutes

Description : Track Structure for private siding with operating speed of 80 to 100 kmph is same as the track structure as specified for a) Group B route b) Group A route c) Group D route* d)Group C route

Last Answer : c) Group D route*

Description : 32 kmph 11.What is the weight per meter length of 52 kg Rail? a. 54.14 kg b. 50.25 kg c. 51.89 kg* d. 53.85 kg

Last Answer : c. 51.89 kg*

Description : What is the speed restriction to be observed for train passing? (i) Necessary speed restriction shall be observed until the grinding operation is over.* (ii) 30KMPH (iii) 45 KMPH (iv) Not required

Last Answer : (i) Necessary speed restriction shall be observed until the grinding operation is over.*

Description : What is the frequency of track recording of the sections having speed more than 110 kmph to 130 kmph a. 4 Months b. 2 Months c. 6 Months d. 3 Months

Last Answer : d. 3 Months

Description : What is the Highest speed of train in Indian Railway a. 140 KMPH b. 120 kmph c. 160 kmph* d. 130 kmph

Last Answer : c. 160 kmph*

Description : Track structure for private siding with operating speed 50 to 80 kmph is the same as track structure as specified for a)Group A route b) Group B route c) Group D route d)Group E route*

Last Answer : d)Group E route*

Description : Speed breaker has to be provided on road approaches of level crossing at maximum feasible distance within Railway boundary but not exceeding a) 10 meters b) 15 meters c) 20 meters* d) 200 meters

Last Answer : c) 20 meters*

Description : What is the time of removal the tensor from the newly executed A T Weld? (i) 15 minutes after pouring. (ii) 20 minutes after pouring* (iii) 25 minutes after pouring. (iv) 30 minutes after pouring.

Last Answer : (ii) 20 minutes after pouring*

Description : arthwork in embankment for railway with manual compaction should be done in layers not exceeding-------------- a) 15 centimeter b) 20 centimeters c) 25 centimeters d) 30 centimeters*

Last Answer : d) 30 centimeters*

Description : Tilting of rails is done at a slope of a. 1 in 30 b. 1 in 25 c. 1 in 20* d. 1 in 15

Last Answer : c. 1 in 20*

Description : Speed breaker of approved design shall be provided on either side of level crossing at ------ within Railway boundary a) 5 meters b) 15 meters c) 20 meters* d0 30 meters

Last Answer : c) 20 meters

Description : The ratio of maximum cant e and gauge G in India is about a)1 / 100 b) 1 / 50 c)1 /10* d) 1 / 25

Last Answer : c)1 /10*

Description : The concrete under water minimum grade of cement recommended by IS code a) M 10 b) M 15 c) M 20* d) M 25

Last Answer : c) M 20*

Description : Demand of water for passengers on railway station is a)10 litres per passenger b)15 litres per passenger c) 20 litres for passenger d) 25 litres per passenger*

Last Answer : d) 25 litres per passenger*

Description : Two stations X and Y are 170 km apart on a straight line. One train starts from X at 6 a.m. and travels towards Y at 25 kmph. Another train starts from Y at 8 a.m. and travels towards X at a speed of 35 kmph. At what time will they meet? a) 11. 30 a.m b) 10.30 a.m c) 11 a.m d) 9 a.m e) 10 am

Last Answer : e Suppose they meet z hours after 6 a.m. Distance covered by X in z hours = 25× z km. Distance covered by Y in (z - 2) hours = 35(z - 2) km. Therefore 25z + 35(z- 2) = 170 60z = 240 x = 4. So, they meet at 10 a.m.

Description : The danger level should be marked with a bright red band …… wide centrally over a white band …… wide for a length of……… a) 5 cm, 10 cm, 60 cms* b) 10 cm, 20 cm, 60 cm c) 15 cm, 30 mm, 60 cm d) None of the above

Last Answer : a) 5 cm, 10 cm, 60 cms*

Description : What is speed restriction on deep screening site done by BCM and tamped by machine followed with DGS? (a) 20 (b) 30 (c) 40* (d) 10

Last Answer : (c) 40*

Description : Thickness of Lining/Charge is kept? (i) 20 mm. (ii) 25 mm* (iii) 30 mm (iv) As decided by the site supervisor

Last Answer : (ii) 25 mm*

Description : After AT Welding First train is to be passed after ? (i) 20 Minutes from pouring of weld metal. (ii) 35 Minutes from pouring of weld metal. (iii) 30 Minutes from pouring of weld metal.* (iv) 25 Minutes from pouring of weld metal.

Last Answer : (iii) 30 Minutes from pouring of weld metal.*

Description : Duration of lone Hooter is: (a) 20 seconds (b) 25 seconds (c) 30 seconds* (d) 50 seconds

Last Answer : (c) 30 seconds*

Description : In covering a distance of 30 km, Abhay takes 2 hours more than Sameer. If Abhay doubles his speed, then he would take 1 hour less than Sameer. Abhay's speed is? a) 5 kmph b) 6 kmph c) 6.25 kmph d) 7.5 kmph e) None of these

Last Answer : Let Abhay's speed be x km/hr. Then, 30/x-30/2x= 3 6x = 30 x = 5 km/hr. Answer: a)

Description : The frequency of a wave travelling at a speed of 500 ms-1 is 25 Hz. Its time period will be ______. (i) 20 s (ii) 0.05 s (iii) 25 s (iv) 0.04 s

Last Answer : (iv) 0.04 s

Description : he minimum compressive strength of first class brick should be a) 75 kg per centimeter square b) 90 kg per centimeter square c) 100 kg per centimeter square* d) 120 kg per centimeter square

Last Answer : c) 100 kg per centimeter square*

Description : How many sleepers are there in Fan shaped 1 in 12 turnout a. 85 sleepers b. 96 sleepers* c. 90 sleepers d. 100 sleepers

Last Answer : b. 96 sleepers*

Description : The minimum design speed for hairpin bends in hill roads is taken as (A) 20 kmph (B) 30 kmph (C) 40 kmph (D) 50 kmph

Last Answer : Answer: Option A

Description : Kishore is travelling on his bike and has calculated to reach point P at 4 pm if he travels at 20 kmph. He will reach there at 12 noon if he travels at 30 kmph. At what speed must he travel to reach P at 2 pm? a) 18 kmph b) 12 kmph c) 24 kmph d) 16 kmph

Last Answer : C Let the distance be x km Travelling at 20 kmph, Kishore will reach point P at 4pm. Travelling at 30 kmph, Kishore will reach point P at 12noon. Therefore, time taken when travelling at 20km - ... his travelling time must be (12-2)=10 hours Hence, required speed =240/10=24 kmph

Description : The power of a locomotive is 315 kW and the total weight of the train is 2000 kN. If the track resistance is 15 N per kN, the maximum speed that the locomotive can attain on level track will be a.43 kmph b.83 kmph c.103 kmph d.107 dynes e.38 kmph

Last Answer : e. 38 kmph

Description : Minimum rail section recommended for section having traffic more than 20 GMT is (a) 90 UTS (b) 52 Kg. (c) 60 Kg.* (d) None of the above.

Last Answer : (c) 60 Kg.

Description : The depth of frog in a brick is a) 15 mm b) 10 mm c) 6. 25 mm* d) 3 mm

Last Answer : c) 6. 25 mm*

Description : Finishing tolerances are measured by? (i) On 30 cm scale (ii) 1 MT straightedge or 10 CM straightedge.* (iii) On 15 cm straight edge (iv) On 30 cm straight edge

Last Answer : (ii) 1 MT straightedge or 10 CM straightedge.*

Description : ormal size of brick used in India is a) 22 x 11.2 x 7 cm* b) 25 x 16 x 8 cm c) 19 x 12 x 9 cm d) 20 x 10 x 5 cm

Last Answer : a) 22 x 11.2 x 7 cm*

Description : Anjana walked at 4 kmph for a certain part of his journey and took an auto, travelling at 25 kmph for the rest of the journey. If he took 42 minutes for the entire journey, what part of the journey did he walk given that his ... journey was 10 kmph? a) 2 km b) 1.5 km c) 3.5 km d) 4 km e) 1 km

Last Answer : Total time = 42 minutes = 0.7 hours. Average speed = 10 kmph Total distance = 0.7×10 = 7 km Let distance walked = W W/4 + (7-W)/25 = 0.7 Solving W = 2 Answer: a)

Description : Maximum tilt specified during sinking of well foundation is a) 1 in 10 b) 1 in 50 c) 1 in 100* d) 1 in 150

Last Answer : c) 1 in 100*

Description : The project report of the reconnaissance survey should be accompanied by Index map area at a scale of 1 cm = ---- km. (a) 2.5 km* (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km

Last Answer : (a) 2.5 km*

Description : The project report of the reconnaissance survey should be accompanied by a map of the area at a scale of 1 cm= --- km. (a) 2.5 km (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km*

Last Answer : (e) 20.0 km*

Description : Distance between the two detonators should be (i) 15 Mt. (ii) 10 Mt.* (iii) 20 Mt (iv) None of the above

Last Answer : (ii) 10 Mt.*

Description : Painting of weld is done up to (i) 10 CM minimum both side of weld & on welded surface .* (ii) 15 CM minimum both side of weld & on welded surface (iii) 20 CM minimum both side of weld & on welded surface (iv) None of the above

Last Answer : (i) 10 CM minimum both side of weld & on welded surface .*

Description : Minm. deflection during transverse breaking load test is? (i) 5 mm (ii) 10 mm (iii) 15 mm* (iv) 20 mm

Last Answer : (iii) 15 mm*

Description : Requirement of water for apron washing a. 5 litre per square metre per day b. 10 litre per square metre per day * c. 15 litre per square metre per day d. 20 litre per square metre per day

Last Answer : b. 10 litre per square metre per day *

Description : Requirement of water for platform washing is a)5 litre per square metre per day * b)10 litre per square meter per day c) 15 litre per square metre per day d)20 litre per square metre per day

Last Answer : a)5 litre per square metre per day *

Description : From distribution main of 50 mm size, number of service pipes of 15 mm size can be taken off are ------ a) 6 b)10 c) 12 e):20*

Last Answer : e):20*

Description : Duration of short hooter is…….. (a) 5 seconds* (b) 10 seconds (c) 15 seconds (d) 20 seconds