Permissible speed of Turnout with 1 in 8.5 curved switches a. 40 kmph
b. 25 kmph*
c. 15 kmph
d. 20 kmph

1 Answer

Answer :

b. 25 kmph*

Related questions

Description : Permissible speed of Turnout with 1 in 12 curved switches a. 40 kmph* b. 25 kmph c. 15 kmph d. 20 kmph

Last Answer : a. 40 kmph*

Description : The maximum permissible speed recommended for Indian Railways for 1 in 8 and half crossing is a)16 kmph* b) 20 kmph c)24 kmph

Last Answer : a)16 kmph*

Description : Flat tyre causes maximum damage at a speed of (a) 90 to 100 kmph (b) 25 to 30 kmph* (c) 10 to 15 kmph (d) 15 to 20 kmph

Last Answer : (b) 25 to 30 kmph*

Description : Speed restriction required for using CC cribs as temporary arrangement is a) 20 kmph* b) 40 kmph c) 35 kmph d) 30 kmph

Last Answer : a) 20 kmph*

Description : Speed restrictions is suggested for distressed bridges on Group II a) upto maximum of 15 kmph b) 25 kmph to 50 kmph* c) 75 kmph d) 60 kmph

Last Answer : b) 25 kmph to 50 kmph*

Description : Speed restrictions is suggested for distressed bridges on Group I a) upto maximum of 15 kmph* b) 25 kmph c) 50 kmph

Last Answer : a) upto maximum of 15 kmph*

Description : Minimum speed restriction to be imposed for Track renewal is:- (a) Stop dead & 10 Kmph (b) 10 Kmph (c) 15 Kmph (d) 20 Kmph*

Last Answer : (d) 20 Kmph*

Description : .Minimum wing rail clearance opposing nose of crossing on Fan shaped turnout a. 45 mm b. 40 mm c. 41 mm* d. 44 mm

Last Answer : c. 41 mm*

Description : Overall length of fan shaped 1 in 12 Turnout a. 39975 mm* b. 41004 mm c. 28613 mm d. None of above

Last Answer : a. 39975 mm*

Description : How many sleepers are there in Fan shaped 1 in 12 turnout a. 85 sleepers b. 96 sleepers* c. 90 sleepers d. 100 sleepers

Last Answer : b. 96 sleepers*

Description : 32 kmph 11.What is the weight per meter length of 52 kg Rail? a. 54.14 kg b. 50.25 kg c. 51.89 kg* d. 53.85 kg

Last Answer : c. 51.89 kg*

Description : What is the speed restriction to be observed for train passing? (i) Necessary speed restriction shall be observed until the grinding operation is over.* (ii) 30KMPH (iii) 45 KMPH (iv) Not required

Last Answer : (i) Necessary speed restriction shall be observed until the grinding operation is over.*

Description : What is the frequency of track recording of the sections having speed more than 110 kmph to 130 kmph a. 4 Months b. 2 Months c. 6 Months d. 3 Months

Last Answer : d. 3 Months

Description : What is the Highest speed of train in Indian Railway a. 140 KMPH b. 120 kmph c. 160 kmph* d. 130 kmph

Last Answer : c. 160 kmph*

Description : Track structure for private siding with operating speed 50 to 80 kmph is the same as track structure as specified for a)Group A route b) Group B route c) Group D route d)Group E route*

Last Answer : d)Group E route*

Description : Track Structure for private siding with operating speed of 80 to 100 kmph is same as the track structure as specified for a) Group B route b) Group A route c) Group D route* d)Group C route

Last Answer : c) Group D route*

Description : Permissible wear of web & foot of rail due to corrosion is:- (a) 15 mm. (b) 1.5 mm.* (c) 0.5 mm. (d) 2.5 mm.

Last Answer : (b) 1.5 mm

Description : Vertical wear permissible for 60kg/90UTS. rails is:- (a) 23 mm. (b) 10 mm. (c) 13 mm.* (d) 15 mm.

Last Answer : (c) 13 mm.

Description : Formation width for cuttings for B.G. single line section is (a) 5.40 m (b) 6.20 m (c) 6.25 m* (d) 6.50 m

Last Answer : (c) 6.25 m*

Description : Minimum permissible speed on high speed roads, is decided on the basis of (A) 15 percentile cumulative frequency (B) 20 percentile cumulative frequency (C) 30 percentile cumulative frequency (D) 40 percentile cumulative frequency

Last Answer : Answer: Option A

Description : What is speed restriction on deep screening site done by BCM and tamped by machine followed with DGS? (a) 20 (b) 30 (c) 40* (d) 10

Last Answer : (c) 40*

Description : The minimum design speed for hairpin bends in hill roads is taken as (A) 20 kmph (B) 30 kmph (C) 40 kmph (D) 50 kmph

Last Answer : Answer: Option A

Description : What is the time of removal the tensor from the newly executed A T Weld? (i) 15 minutes after pouring. (ii) 20 minutes after pouring* (iii) 25 minutes after pouring. (iv) 30 minutes after pouring.

Last Answer : (ii) 20 minutes after pouring*

Description : arthwork in embankment for railway with manual compaction should be done in layers not exceeding-------------- a) 15 centimeter b) 20 centimeters c) 25 centimeters d) 30 centimeters*

Last Answer : d) 30 centimeters*

Description : The concrete under water minimum grade of cement recommended by IS code a) M 10 b) M 15 c) M 20* d) M 25

Last Answer : c) M 20*

Description : Demand of water for passengers on railway station is a)10 litres per passenger b)15 litres per passenger c) 20 litres for passenger d) 25 litres per passenger*

Last Answer : d) 25 litres per passenger*

Description : Tilting of rails is done at a slope of a. 1 in 30 b. 1 in 25 c. 1 in 20* d. 1 in 15

Last Answer : c. 1 in 20*

Description : The frequency of a wave travelling at a speed of 500 ms-1 is 25 Hz. Its time period will be ______. (i) 20 s (ii) 0.05 s (iii) 25 s (iv) 0.04 s

Last Answer : (iv) 0.04 s

Description : Speed breaker of approved design shall be provided on either side of level crossing at ------ within Railway boundary a) 5 meters b) 15 meters c) 20 meters* d0 30 meters

Last Answer : c) 20 meters

Description : In case of a curved track on electrified, double line, BG section a) Duty hut cannot be provided for a level crossing. b) Duty hut should be on the inside of the curve. c) Duty hut should be on the outside of the curve.* d) Duty hut can be provided on any side of the curve.

Last Answer : c) Duty hut should be on the outside of the curve.*

Description : Speed breaker has to be provided on road approaches of level crossing at maximum feasible distance within Railway boundary but not exceeding a) 10 meters b) 15 meters c) 20 meters* d) 200 meters

Last Answer : c) 20 meters*

Description : ormal size of brick used in India is a) 22 x 11.2 x 7 cm* b) 25 x 16 x 8 cm c) 19 x 12 x 9 cm d) 20 x 10 x 5 cm

Last Answer : a) 22 x 11.2 x 7 cm*

Description : Two stations X and Y are 170 km apart on a straight line. One train starts from X at 6 a.m. and travels towards Y at 25 kmph. Another train starts from Y at 8 a.m. and travels towards X at a speed of 35 kmph. At what time will they meet? a) 11. 30 a.m b) 10.30 a.m c) 11 a.m d) 9 a.m e) 10 am

Last Answer : e Suppose they meet z hours after 6 a.m. Distance covered by X in z hours = 25× z km. Distance covered by Y in (z - 2) hours = 35(z - 2) km. Therefore 25z + 35(z- 2) = 170 60z = 240 x = 4. So, they meet at 10 a.m.

Description : Permissible creep in track is m. 50 mm n. 100 mm o. 125 mm p. 150 mm.*

Last Answer : p. 150 mm.*

Description : Minimum permissible vertical wear on nose of a 52 kg CMS crossing on Rajdhani route is i) 6mm ii) 8mm* iii) 10mm iv) 12 mm

Last Answer : ii) 8mm*

Description : For high level flush the nominal dia of flush pipe shall be (a) 32 mm* (b) 40 mm (c) 25 mm (d) None of these

Last Answer : a) 32 mm*

Description : There should not be any combination joint on level crossing proper and its approaches up to a) 15 meters b) 30 meters c) 40 meters d) 50 meters

Last Answer : d) 50 meters

Description : From distribution main of 40 mm size , number of service pipe of 15 mm size can be taken off are--------- a) 3 b) 6 c) 10 d) 12*

Last Answer : d) 12*

Description : Nishu is standing on a railway bridge which is 180 m long. He finds that a train crosses the bridge in 20 seconds but himself in 8 seconds. Find the speed of the train? A.35 kmph B.54 kmph C.62 kmph D.70 kmph E.None of these

Last Answer : Answer - B (54 kmph) Explanation - Let the length of the train be x metres. Then, the train covers x metres in 8 seconds (train is actually covering itself because length of man is very less compartable to train)and (x + ... /8]m/sec (convert to km/hr i.e x 18/5) =[120/8] x 18/5kmph = 54 kmph.

Description : Rails used for A T Welding shall not normally be welded? (i) 20 years old . (ii) 30 years old (iii) 40 years old (iv) 50 years old*

Last Answer : iv) 50 years old*

Description : Cross slope of the formation to have good drainage of Ballast section is a) 1 in 40* b) 1 in 50 c) 1 in 30 d) 1 in 20

Last Answer : a) 1 in 40*

Description : From the distribution main of 40 mm size, number of service pipe of 20 mm size can be taken off are ------- a)3 B) 6* c) 10 d) 12

Last Answer : B) 6*

Description : A person travels from P to Q at a speed of 40 kmph and returns by increasing his speed by 50%. What is his average speed for the both the trips? A.35 kmph B.4o kmph C.48 kmph D.55 kmph E.None of these

Last Answer : Answer – C (48 kmph) Explanation – Speed on return trip = 150% of 40 = 60 kmph Average speed = [2 x 40 x 60] / [40 + 6]km/hr =4800/100km/hr = 48 km/hr.

Description : The depth of frog in a brick is a) 15 mm b) 10 mm c) 6. 25 mm* d) 3 mm

Last Answer : c) 6. 25 mm*

Description : Anjana walked at 4 kmph for a certain part of his journey and took an auto, travelling at 25 kmph for the rest of the journey. If he took 42 minutes for the entire journey, what part of the journey did he walk given that his ... journey was 10 kmph? a) 2 km b) 1.5 km c) 3.5 km d) 4 km e) 1 km

Last Answer : Total time = 42 minutes = 0.7 hours. Average speed = 10 kmph Total distance = 0.7×10 = 7 km Let distance walked = W W/4 + (7-W)/25 = 0.7 Solving W = 2 Answer: a)

Description : In covering a distance of 30 km, Abhay takes 2 hours more than Sameer. If Abhay doubles his speed, then he would take 1 hour less than Sameer. Abhay's speed is? a) 5 kmph b) 6 kmph c) 6.25 kmph d) 7.5 kmph e) None of these

Last Answer : Let Abhay's speed be x km/hr. Then, 30/x-30/2x= 3 6x = 30 x = 5 km/hr. Answer: a)

Description : Under Liberalised Remittance Scheme, PAN card need not be insisted upon for remittance made towards permissible current account transactions up to __________ A. USD 25,000 B. USD 20,000 C. USD 15,000 D. USD 10,000 E. None of the Above

Last Answer : A. USD 25,000 Explanation: PAN card need not be insisted upon for remittance made towards permissible current account transactions up to USD 25,000 per financial year.

Description : Thickness of Lining/Charge is kept? (i) 20 mm. (ii) 25 mm* (iii) 30 mm (iv) As decided by the site supervisor

Last Answer : (ii) 25 mm*

Description : After AT Welding First train is to be passed after ? (i) 20 Minutes from pouring of weld metal. (ii) 35 Minutes from pouring of weld metal. (iii) 30 Minutes from pouring of weld metal.* (iv) 25 Minutes from pouring of weld metal.

Last Answer : (iii) 30 Minutes from pouring of weld metal.*

Description : In cement pressure grouting G.I pipes of diameter …… and ……length, should be fixed in drilled holes a) 12 to 20 mm, 200 mm* b) 12 to 20 mm, 300 mm c) 12 to 25 mm, 500 mm d) 20 to 25 mm, 300 mm

Last Answer : a) 12 to 20 mm, 200 mm*