While doing final location survey, the centre line is fully marked with pegs at --- metre
distance
(a) 10m
(b) 20m*
(c) 30m
(d) 50m

1 Answer

Answer :

(b) 20m*

Related questions

Description : eripheral velocity of impact cutter is about: A.50m/sec B.20m/sec C.10m/sec D.5m/sec

Last Answer : A.50m/sec

Description : The minimum distance required for an echo to occur is _______. a)30m b)17.2m c)100m d)20m

Last Answer : b)17.2m

Description : A detailed project report of the proposed railway line is made after (a) Preliminary survey (b) Reconnaissance survey (c) Final location survey* (d) Traffic survey

Last Answer : (c) Final location survey*

Description : Which of the following survey are required to be done before the construction of new railway line. (a) Traffic survey (b) Reconnaessarice survey (c) Preliminary survey (d) Final location survey (e) All the above

Last Answer : e) All the above

Description : In racing over a given distance, A can beat B by 20m, B can beat C by 10m, A can beat C by 28m. The racing distance is? a) 58 m b) 116 m c) 100 m d) 120 m e) cannot be determined

Last Answer : Let the uniform speeds of A,B,C be vA,vB,vC, respectively. Let t1 be the time taken for the race between A and B and t2 be the time taken for race between B and C Since A covers the distance in time t1, race between A and C ... ) = VB/ VC = d/(d-10) Thus (d-20)(d-10)=d(d-28).Hence, d=100. Answer: c)

Description : During last phase of the reconnaissance, details of the grade line is recorded on 2 metre poles to indicate (A) Direction of the proposed alignment (B) Distance between the previous and forward pegs (C) Relative elevations of pegs (D) All the above

Last Answer : Answer: Option D

Description : The project report of final location survey gives tabulated statement of the following (a) Curve abstract (b) Gradient abstract (c) Bridge abstract (d) Important bridges (e) Station machinery (f) Stations and stations sites (g) All the above*

Last Answer : g) All the above*

Description : Investigation for important bridges may be carried out in which stage a) Technical feasibility study (reconnaissance survey) b) Techno-economic feasibility study (preliminary engineering survey) c) Detailed survey and project report stage (final location survey) d) All the above *

Last Answer : d) All the above

Description : A,B are start walking around a Circular park of radius 70m. They start at the same point, and A goes clockwise at 10m/s, while b goes anti-clockwise at 20m/s.How many times will they cross each other at the starting point if they walk for 30 minutes? a) 20 b) 40 c) 60 d) 80 e) None of the above

Last Answer : Radius = 70m, So circumference = 2 (22/7) 70 =440m Relative speed = 10 +20 = 30m/s They will meet everytime at the starting point when the distance covered by both put together is a multiple of 440 ... =1800/44 =40.9 So they will meet 40 times (we need to ignore the decimal part). Answer : b

Description : A,B are start walking around a Circular park of radius 70m. They start at the same point, and A goes clockwise at 10m/s, while b goes anti-clockwise at 20m/s. How many times will they cross each other at the starting point if they walk for 30 minutes? a) 20 b) 40 c) 60 d) 80 e) None of the above

Last Answer : Radius = 70m, So circumference = 2 (22/7) 70 =440m Relative speed = 10 +20 = 30m/s They will meet everytime at the starting point when the distance covered by both put together is a multiple of 440 ... =1800/44 =40.9 So they will meet 40 times (we need to ignore the decimal part). Answer : b

Description : Cleaning of sugarcane is obtained at peripheral speed A. 12-15m/sec B. 18-20m/sec C. 20-25m/sec D. 25-30m/sec

Last Answer : B. 18-20m/sec

Description : Height gauges should be located at a minimum distance of….. from gate post. (a) 5 m (b) 7.5m (c) 8m* (d)10m

Last Answer : (c) 8m*

Description : The purpose of reconnaissance survey (a) To determine technical fenibility of the line* (b) To assess whether such a line is required or not (c) To decide the final alignment of the railway line (d) None of the above

Last Answer : (a) To determine technical fenibility of the line*

Description : The resistance of a material with conductivity 2millimho/m 2 , length 10m and area 50m is a) 500 b) 200 c) 100 d) 1000

Last Answer : c) 100

Description : Spacing of Trolley refuges a) Every 100m b) If span is more than 100m, on each pier c) Ballasted deck bridges – every 50m d) All the above*

Last Answer : d) All the above*

Description : A bridge is generally specified as “Br. No. 180 (5x9.10m G) at km 345/5-6”. a) Effective Span b) Width of bridge c) Clear Span* d) Overall length of bridge

Last Answer : c) Clear Span*

Description : While taking sample of water from well, sample is collected a)About 2 metre above the bottom of wel b) About 1 metre above the bottom of well * c)About 1 metres below the bottom of well d) none of the above

Last Answer : b) About 1 metre above the bottom of well *

Description : Minimum distance of duty hut from centre line of nearest track on BG is a) 2 meters b) 3 meters c) 4 meters d) 6 meters*

Last Answer : d) 6 meters*

Description : Minimum distance of gate post from centre line of nearest track on BG is a) 2 meters b) 3 meters* c) 4 meters d) 5 meters

Last Answer : b) 3 meters*

Description : A goat is tethered to one end of a rope of length 20m, while the other end is fixed at the centre of a large circular field. -Maths 9th

Last Answer : (b) 3.5 x 100πThe goat can graze the area CABEODC + quarter circle CDF + quarter circle FEB= \(rac{3}{4}\)x π x (20)2 + \(rac{1}{4}\) x π x (10)2 + \(rac{1}{4}\) x π x (10)2 = 300π + 25π + 25π= 3.5 x 100π.

Description : Addition gain of 10 db is used for testing. (i) ‘D’ marked rails on single lines. (ii) ‘D’ marked rails on double lines. (iii) Testing on single line and ‘D’ marked rails on double/multiple lines section.* (iv) None of above.

Last Answer : (iii) Testing on single line and ‘D’ marked rails on double/multiple lines section.*

Description : State the uses of following instruments in survey: i)Cross staff ii) Chain iii) Pegs iv) Arrows

Last Answer : i) Cross-Staff: To set up perpendicular or right angle to given chain line OR to find foot of perpendicular from given object to a chain line. ii) Chain: Chains are used for measuring distances. iii) ... on survey lines. iv) Arrows : They are used to mark the end of each chain during chaining. 

Description : Write the uses of following survey instruments i) Ranging Rod ii) Pegs iii) Cross-staff iv) Plumb bob

Last Answer : i) Ranging Rod : Ranging rod are used for ranging. ii) Pegs : Pegs are used for marking the positions of stations or terminals points of survey lines. iii) Cross-staff : It is used ... It is also used for accurate centering of the surveying instruments like theodolite, compass, plane table etc. 

Description : On an unmanned level crossing stop board should be provided at a distance of --------- from the centre of nearest track a) 5 meters * b) 6 meters c) 3 meters d) 7.5 meters

Last Answer : a) 5 meters

Description : The minimum centre to centre distance of a B.G. track in mid-section is ……….. mm (a) 4200 (b) 4265* (C) 4350 (d) 4000

Last Answer : (b) 4265*

Description : What is the minimum distance centre to centre of straight tracks for new works/alterations to existing works. a. 4265 mm. b.3660 mm. c.5300 mm.* d 4365 mm.

Last Answer : c.5300 mm.*

Description : Traffic survey is done to find out (a) The most promising route for the railway in the area (b) The possible traffic the railway line will carry (c) Standard of railway line to be followed (d) All the above*

Last Answer : d) All the above*

Description : In new Rail as well as second hand rails how much end bends of the rails in lateral direction are permitted when checked with one metre straight edge before welding? (i) ± 0.2 mm in lateral direction (ii) ± 0.3 mm in lateral direction (iii) ± 0.5 mm in latera

Last Answer : (iii) ± 0.5 mm in latera

Description : RBG loading caters for maaaaximum axle load of…….tones for locomotive with trailing loadof…… tonnes/metre of track with maximum axle load of…….tonnes for wagons a)22.9,7.67,25 b)22.5,7.67,22.9* c)25,7.67,22.9, d)None of above

Last Answer : b)22.5,7.67,22.9*

Description : GML loading caters for maaaaximum axle load of…….tonnes for locomotive with trailing load of………tonnes/metre. a)22.9,7.67* b)22.5,7.67 c)25,7.67 d)None of above

Last Answer : a)22.9,7.67*

Description : Requirement of water for apron washing a. 5 litre per square metre per day b. 10 litre per square metre per day * c. 15 litre per square metre per day d. 20 litre per square metre per day

Last Answer : b. 10 litre per square metre per day *

Description : Requirement of water for platform washing is a)5 litre per square metre per day * b)10 litre per square meter per day c) 15 litre per square metre per day d)20 litre per square metre per day

Last Answer : a)5 litre per square metre per day *

Description : The main drawback of centrifugal pump is a)necessity of priming b) discharge from pump varies with the load of water c) For high heads efficiency is low up to 50% d) the suction lift is limited to 6 metre e) all of the above*

Last Answer : e) all of the above*

Description : The spacing of tube wells should generally be more than ----------from the circle of influence a)10 metre b)50 metre c)100 metre* d) 500 metre

Last Answer : c)100 metre*

Description : Specific yield of well is a) Discharge per unit time b) Yield of well per metre of drawdown* c) Velocity of water per unit time d)None of the above

Last Answer : b) Yield of well per metre of drawdown*

Description : For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of A. 100 cm B. 120 cm C. 140 cm D. 160 cm

Last Answer : ANS: D

Description : Weather date of welding is marked on weld? (i) Yes (ii) As decided by the site supervisor (iii) No* (iv) None of the above

Last Answer : (iii) No*

Description : Flood level gauge to be marked a) commencing from bed level to top b) commencing from bottom of girder towards bed level* c) commencing from Rail level d) commencing from Danger level

Last Answer : b) commencing from bottom of girder towards bed level*

Description : Flood level gauge to be marked in a) All important bridges* b) All major bridges c) All minor & major bridges d) All bridges

Last Answer : a) All important bridges*

Description : The danger level should be marked with a bright red band …… wide centrally over a white band …… wide for a length of……… a) 5 cm, 10 cm, 60 cms* b) 10 cm, 20 cm, 60 cm c) 15 cm, 30 mm, 60 cm d) None of the above

Last Answer : a) 5 cm, 10 cm, 60 cms*

Description : n Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 12.20 < 30.5 m a) 300 mm b) 600 mm* c) 500 mm d) 450 mm

Last Answer : b) 600 mm*

Description : In Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 6.10 < 12.2 m a) 300 mm b) 600 mm c) 450 mm* d) 500 mm

Last Answer : c) 450 mm*

Description : For taking track measurement at accident site stations shall be marked at …….. Apart. (a) 1 m (b) 2m (c) 3m* (d) 5m

Last Answer : (c) 3m*

Description : The centre to centre spacing formation width for double line section is (a) 4725 mm (b) 5025 (c) 5330* (d) 5500

Last Answer : c) 5330*

Description : Centre to Centre spacing of formation for double railway line for Broad Gauge is a) 1676 mm b) 4725 mm c) 4265mm d) 5300 mm*

Last Answer : d) 5300 mm*

Description : 1. Which of the statements with regard to formation is correct (1) One of the Functions of the formation is to facilitate drainage (2) Width of bank for double railway line is 12.155 meters (3) Width of cutting for double railway track is 11. ... a) 2, 3, 5 b) 3, 4, 5* c) 2, 3, 4 d) 2, 4, 5

Last Answer : b) 3, 4, 5*

Description : Stop boards on either side of approaches of all unmanned level crossings shall be provided at -------------from the centre line of nearest track. a) 3meters b) 5 meters* c) 6 meters d) 10 meters

Last Answer : b) 5 meters*

Description : While painting with Aluminium paint, a little quantity of ………..shall be added to the paint while doing the first coat to distinguish it from the second coat a) little blue paint* b) lamp black c) red paint d) green paint

Last Answer : a) little blue paint*

Description : While painting with red oxide paint, a little quantity of ………..shall be added to the paint while doing the first coat to distinguish it from the second coat a) little blue paint b) lamp black* c) red paint d) green paint

Last Answer : b) lamp black*

Description : The piston of a steam engine moves in S.H.M. The crank rotates at 180 r.p.m. and the stroke length is 2 metres. The linear velocity of the piston when it is at a distance of 1 metre from the centre is a.8.88 m/sec b.16.32 m/sec c.5.88 m/sec d.8.16 m/sec e.Zero