Before constructing a dam, the factor to be considered for controlling sedimentation, is
(A) Selection of dam site
(B) Construction of check dams
(C) Providing vegetation screens
(D) All the above

1 Answer

Answer :

(D) All the above

Related questions

Description : Why do people oppose the construction of Tehri Dam on the river Ganga and Sardar sarover project on the river Narmada. (Or) Mention three disadvantage of producing hydroelectricity by ... construction of dams for production of electricity adversely affects the environment of that place. -Biology

Last Answer : Answer. Large area is required to build the dam that result rehabilitation of displaced people.Large eco-systems are destroyed when submerged under the water in dams.The vegetation which is submerged rots ... and gives rise to large amounts of methane gas which leads to a green-house effect.

Description : Dams are designed to reduce flooding by ____________. a) Protecting river banks from erosion b) Providing storage for flood water c) Increasing the downstream velocity of flood water ‘ d) Trapping sediment behind the dam so it can't be deposited downstream

Last Answer : b) Providing storage for flood water

Description : Dams are designed to reduce flooding by _______________. a) Protecting river banks from erosion b) Providing storage for flood water c) Increasing the downstream velocity of flood water d) Trapping sediment behind the dam so it can't be deposited downstream

Last Answer : b) Providing storage for flood water

Description : The uplift pressure on a dam can be controlled by (i) Constructing cut-off under upstream face (ii) Constructing drainage channels between the dam and its foundation (iii) By pressure grouting in foundation The correct answer is ... ) and (ii) (C) Both (i) and (iii) (D) (i), (ii) and (iii)

Last Answer : Answer: Option D

Description : Enumerate the various benefits and drawbacks of constructing dams.

Last Answer : ✔ Dams are built to control flood and store flood water. ✔ Sometimes dams are used for diverting part or all of the water from river into a channel. ✔ Dams are used mainly for drinking and ... ✔ Dams are used for recreational purposes. ✔ Navigation and fishery can be developed in the dam areas.

Description : Reena's father works with a company that builds dams. Once he took her to the site where a dam was being built. Reena saw a group of people sitting there and shouting slogans against the ... the peaceful resolution of the conflict proved to boon for many citizens of the country. How? -Biology

Last Answer : (i) Because she convinced the people by explaining them the advantage of constructing dam and come with a solution of rehabilitation of displaced peoples. So the contribution to the peaceful resolution of ... (c) Low cost of production of electricity gives monetary gain which is a boon to citizens.

Description : To check the expansion of Thar desert which one of the following methods is expected to yield the best results? (a) Artificial rain (b) Construction of canals (c) Afforestation (d) Construction of Dams

Last Answer : Ans: (c)

Description : The picture shown here is a check dam. Which of the following benefit it does not provide. A. Increasing ground water level. B. Controlling the floods. C. Reducing soil erosion. D. Fishing activity.

Last Answer : D. Fishing activity.

Description : Which of the following is a disaster mitigation strategy? a. Constructing cyclone shelters b. Giving loans from banks c. Providing cheap electricity d. Providing school uniforms to children

Last Answer : a. Constructing cyclone shelters

Description : What is the difference between Dam and Barrage? What benefits are obtained by constructing a big dam?

Last Answer : Ans:A dam is a storage of water, while a barrage is made to increase the water depth. Benefits of Dams: Leverage to agriculture, by making use of the rain water also. Ensures regulated flow in ... a big dam. By the constructoin of big dams, we get an employment channel for our talented Pakistanis.

Description : The fundamental factor in the selection of pavement type is (A) Climatic condition (B) Type and intensity of traffic (C) Sub-grade soil and drainage conditions (D) Availability of funds for the construction project

Last Answer : Answer: Option B

Description : Water supply system includes  (A) Digging a well for water  (B) Construction of dams  (C) Construction of canals  (D) Entire arrangement from source to distribution 

Last Answer : (D) Entire arrangement from source to distribution 

Description : Pozzolana cement is used with confidence for construction of (A) Dams (B) Massive foundations (C) R.C.C. structures (D) All the above

Last Answer : (D) All the above

Description : For the construction of cement concrete dams, the maximum permissible size of the aggregates, is (A) 40 mm (B) 50 mm (C) 60 mm (D) 70 mm

Last Answer : Answer: Option A

Description : At FOBs in electrified section the electrocution by live OHE wires is prevented by providing a) smoke gaurds b) Roofing c) Bottom lateral bracings d) protective screens*

Last Answer : d) protective screens*

Description : Seepage through foundation in an earthen dam is controlled by providing (A) Rock toe (B) Horizontal blanket (C) Impervious cut off (D) Chimney drain

Last Answer : Answer: Option C

Description : The gypsum is added to the cement for (a) Providing high strength to the cement (b) Controlling the initial setting time of cement. (c) Lowering the clinkering temp of cement (d) All the above.

Last Answer : (b) Controlling the initial setting time of cement.

Description : What is dam on which bases dams are constructed -Geography

Last Answer : Dam, structure built across a stream, a river, or an estuary to retain water. Dams are built to provide water for human consumption, for irrigating arid and semiarid lands, or for use in industrial ... be broken or damaged and may result to a massive flood therefore the dam's bases made wilder.

Description : What is a dam? What are the different types of dams? -SST 10th

Last Answer : A dam is a barrier across flowing water that obstructs, directs or retards the flow, often creating a reservoir, lake or impoundment. Dams are classified according to their structure, intended purpose or height ... as: . Large dams or major dams . Low dams . Medium height dams . High dams

Description : Which of the following dams are part of Chambal Project? (a) Maithon, Panchet, Tilaiya, Konar, Bokaro (b) Pravara, Ramagundam (c) Rana Pratap Sagar, Gandhi Sagar (d) Sardar Sarovar Dam

Last Answer : (c) Rana Pratap Sagar, Gandhi Sagar

Description : Which one of the following combination of river and dams is not correct ? (a) Salal dam on Chenab river(b) Koyna on Krishna river (c) BhakraNangal on Satluj river (d) Tehri on Yamuna river.

Last Answer : (d) Tehri on Yamuna river.

Description : The number of damaged gingival tissues after placing rubber dam is greater if: A. The distance between holes is too big B. The distance between holes is too small C. The punctured holes are too big in size D. Not using lubricant when placing rubber dams

Last Answer : B. The distance between holes is too small

Description : The factor for the selection of pumping station site, is  (A) Distance of the source of contamination or pollution  (B) Height above the H.F.L. of the river  (C) Future expansion  (D) All the above

Last Answer : (D) All the above

Description : If Organic sources of carcinogenic compounds in water persist even after chlorination, then what is the correct sequence among treatment processes listed below if all these are considered compulsory ? 1. Coagulation 2. Sedimentation 3. Filtration in ... c) 4- 2- 3- 1- 5 and 6 d) 1-5-2-3-4 and 6

Last Answer : d) 1-5-2-3-4 and 6

Description : For the upstream face of an earthen dam, the most adverse condition for stability of slope is (A) Sudden drawdown (B) Steady seepage (C) During construction (D) Sloughing of slope

Last Answer : Answer: Option A

Description : For dam construction the size of aggregates are (a) 40mm (b) 50mm (c) 60mm (d) 75mm

Last Answer : (a) 40mm

Description : Explain the various problems associated with the construction of large dams. Give examples in support of your answer. -Geography

Last Answer : Dam is built as the barrier to the flowing of water. It is constructed as the reservoir and it mostly improves the irrigation facility of the area. According to the height, dams can ... have been experienced the earthquake, flood and other natural calamities because of the construction of dams.

Description : Explain various problems associated with poor people due to construction of large dams. -SST 10th

Last Answer : (i) Construction of large dams leads to the large-scale displacement of the local communities. (ii) Local people have to give up their land and livelihood. (ii) Pbor people lose ... The landless people have to work as labourers in factories or construction sites. Their lives become miserable.

Description : How does construction of dams and canals create employment in large numbers in rural areas? (a) Large number of engineers are needed

Last Answer : Take the case of Laxmi with her two-hectare plot of unirrigated land. The government can ... (d) Executives and administrators can easily be adjusted

Description : Deccan Plateau is suitable for construction of _____________ a. Dams b. Bridges c. Tanks d. Wells

Last Answer : c. Tanks

Description : Which of the following is the suitable location for the construction of dams in a folded terrain? (A) Crest of the fold (B) Trough of the fold (C) Limbs of the fold (D) None of these

Last Answer : (C) Limbs of the fold 

Description : Which one of the following parameters is considered to determine the reflectance of a vegetation canopy? (A) Solar zenith angle (B) Azimuth angle (C) Look angle (D) All of these

Last Answer : Answer: Option D

Description : During treatment of water, sedimentation is done  (A) Before filtration  (B) After filtration  (C) Simultaneously with filtration  (D) Along with chlorination 

Last Answer : (A) Before filtration 

Description : The 'function generator' of the control circuit illustrated _______________. EL-0095 A. can be programmed to produce a non-linear output for a linear input depending on operating conditions B. is used for ... which or how many engines are needed for a required vessel speed D. all of the above

Last Answer : Answer: A

Description : Brick nogging type of partition wall, is constructed by (A) Laying bricks as stretchers in cement mortar (B) Laying bricks as headers in cement mortar (C) Reinforcing brick wall with iron straps (D) Constructing brick work within a wooden framework

Last Answer : Answer: Option D

Description : For constructing a terrazzo floor, Pick up the incorrect statement from the following: (A) A base course is prepared as in cement concrete flooring (B) A 32 mm thick layer of cement concrete ... final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material

Last Answer : Answer: Option B

Description : If Coca-Cola wished to examine its general environment before constructing its business strategy, the company would explore all of the following environments except (a) Sociocultural ; (b) Knowledge ; (c) Global ; (d) Economic

Last Answer : (b) Knowledge ;

Description : Most important factor to be considered in the selection of packings for absorbers is the __________ of packing. (A) Size (B) Durability (C) Porosity (D) Cost

Last Answer : (C) Porosity

Description : Web site to link multiple screens through web browser?

Last Answer : Just found it! Junkyard Jumbotron

Description : I'm not sure how my site is rendering on screens with a height greater than 900px. Could you take a look?

Last Answer : looks fine to me at 1080 full screen.

Description : Parameters considered during site selection

Last Answer : Parameters considered during site selection : 1) Availability of land 2) Connectivity to grid 3) Connectivity to the road 4) Easy access to locality/infrastructure 5) Ecology 6) Cost of transmission of energy 7) Cost of land and taxes 8) Transportation facilities

Description : Moist climate is the most favourable factor in the site selection far a (A) Steel plant (B) Textile factory (C) Petroleum refinery (D) Coke oven battery

Last Answer : (B) Textile factory

Description : Explain any four factor that affects selection of site.

Last Answer : Factors that affecting on selection of site. 1. Availability of raw material: As far as possible the site selected should be near the source of raw materials so that cost of transportation can be ... attitude: Mindset of the local people is also important, many times they oppose the work. 

Description : Corrosion of well pipes may not be reduced by  (A) Reducing the draw down and the pumping rate  (B) Reducing the flow velocity  (C) Using thicker pipes  (D) Using screens having larger area of openings 

Last Answer : (D) Using screens having larger area of openings 

Description : Dynamite is a tool that can be used to cut down trees. To cut a tree 18 inches in diameter requires five sticks of dynamite: one on the north, south, east and west sides of the tree, and the ... you instruct the diver to put the fifth stick of dynamite if you wanted the tree to fall north? -Riddles

Last Answer : It doesn't matter where the fifth stick is placed, since the tree won't fall in any direction. Being wood, it will float and rise to the surface.

Description : When was the Hoover dam construction completed?

Last Answer : In 1936.

Description : What body of water was formed by the construction of the glen canyon dam?

Last Answer : lake powell -apex

Description : True to false after the construction of the Ithai Dam, water levels in the lake lowered, severely impacting fishing in Athaphums?

Last Answer : yes

Description : The construction of Tehri dam is done across which river

Last Answer : Bhagirathi

Description : Flood can be controlled by: a) Afforestation (b) Construction of dam (c) Both a & b (d) None of these

Last Answer : (c) Both a & b