The fundamental factor in the selection of pavement type is
(A) Climatic condition
(B) Type and intensity of traffic
(C) Sub-grade soil and drainage conditions
(D) Availability of funds for the construction project

1 Answer

Answer :

Answer: Option B

Related questions

Description : Design of flexible pavement, involves (A) Wheel loads (B) Intensity of traffic (C) Climate of the region (D) Sub-grade conditions

Last Answer : Answer: Option C

Description : To prevent movement of moisture from sub-grade to road pavement at the same level as that of water-table, thickness of a cut off layer of coarse sand, is (A) 15 cm (B) 20 cm (C) 30 cm (D) 45 cm

Last Answer : Answer: Option A

Description : Bottom-most component of a flexible pavement, is (A) Sub-grade (B) Sub-base (C) Base (D) Base course

Last Answer : Answer: Option A

Description : Bottom most layer of pavement is known as (A) Wearing course (B) Base course (C) Sub-base course (D) Sub-grade

Last Answer : Answer: Option D

Description : To prevent movement of moisture from sub-grade to road pavement on embankments about 0.6 m to 1 m higher than water table, the thickness of cut off layer of coarse sand used, is (A) 15 cm (B) 20 cm (C) 30 cm (D) None of these

Last Answer : Answer: Option D

Description : Flexible pavement distribute the wheel load (A) Directly to sub-grade (B) Through structural action (C) Through a set of layers to the sub-grade (D) None of the above

Last Answer : Answer: Option C

Description : Which of the following correspond to the recommendations of IRC for pavement thickness determination by CBR Method ? 1. CBR tests are to be conducted in-situ 2. Static compression is best adopted 3. The top 50 cm of sub grade ... 1, 2 and 3 (b) 1 and 2 only (c) 2 and 3 only (d) 1 and 3 only

Last Answer : (c) 2 and 3 only

Description : In a concrete pavement, during summer, at and soon after mid-day, the combined stress at the interior of the slab is equal to : (a) Wheel load stress + Temperature warping stress + Sub ... + Sub grade resistant stress (d) Wheel load stress - Temperature warping stress − Sub grade resistant stress

Last Answer : (b) Wheel load stress + Temperature warping stress – Sub grade resistant stress

Description : Thickness of a pavement may be reduced considerably by (A) Compaction of soil (B) Stabilisation of soil (C) Drainage of soil (D) Combination of all the above

Last Answer : Answer: Option D

Description : Name the condition which influences the development of plants into distinctive forms. (1) Climatic conditions (2) Soil conditions (3) Environmental conditions (4) Social conditions

Last Answer : (1) Climatic conditions Explanation: The development of plants into diverse and distinctive forms is mainly due to climatic fact ors such as temperature, precipitation, etc, which arc in turn ... Koeppen's classification, we can identify different climates by the types of plants that grow there.

Description : Name the condition which influences the development of plants into distinctive forms. (1) Climatic conditions (2) Soil conditions (3) Environmental conditions (4) Social conditions 

Last Answer : Climatic conditions

Description : Tangible Tangible costs include include which of the following? following? a. climatic climatic conditions conditions b. availability of public availability of public transportation transportation ... quality and attitude attitude of prospective prospective employees employees e. zoning regulations

Last Answer : c. taxes

Description : Shoulders for high traffic volume roads, should (A) Be stable throughout the year to be used by vehicles in the case of emergency (B) Support and protect the ends of carriage ways (C) Not allow entrance of water to sub-grade (D) All the above

Last Answer : Answer: Option D

Description : The pavement width of a road depends upon (A) Terrain (B) Type of traffic (C) Number of lanes (D) All the above

Last Answer : Answer: Option C

Description : The factor affecting per capita demand, is (A) Size of the city (B) Climatic conditions (C) Pressure in water mains (D) All the above

Last Answer : (D) All the above

Description : What is Traffic Engineering? Define the term busy hour, traffic intensity and grade of service.

Last Answer : Traffic engineering provides the basis for analysis and design of telecommunication network to carry a given traffic at a particular loss probability. It provides a means to determine the quantum of common equipments ... A0  Where  A= offered traffic  A0 = carried traffic  A-A0= lost traffic    

Description : The width of pavement in addition to a gravelled berm 1 m on either side for a two directional traffic recommended by Nagpur Conference of Chief Engineers, is (A) 4.7 m (B) 5.7 m (C) 6.7 m (D) 7.7 m

Last Answer : Answer: Option C

Description : Concrete pavement is provided if daily traffic per lane exceeds (A) 500 tonnes (B) 750 tonnes (C) 1000 tonnes (D) 1250 tonnes

Last Answer : Answer: Option C

Description : The drainage area of a town is 12 hectares. Its 40% area is hard pavement ( K = 0.85), the 40% area is unpaved streets (K = 0.20) and the remaining is wooded areas (K = 0.15). Assuming the time of concentration ... 60) the maximum run off is A. 0.10 cumec B. 0.12 cumec C. 0.15 cumec D. 0.20 cumec

Last Answer : ANS: C

Description : Traffic surveys are carried out (A) To know the type of traffic (B) To determine the facilities to traffic regulations (C) To design proper drainage system (D) All the above

Last Answer : Answer: Option D

Description : A foundation rests on (A) Base of the foundation (B) Sub-grade (C) Foundation soil (D) Both (b) and (c

Last Answer : Answer: Option D

Description : For a poorly graded sub-grade soil, thickness of sub-base, is (A) 10 cm (B) 15 cm (C) 20 cm (D) 30 cm

Last Answer : Answer: Option D

Description : Time factor for a clay layer is (A) A dimensional parameter (B) Directly proportional to permeability of soil (C) Inversely proportional to drainage path (D) Independent of thickness of clay layer

Last Answer : (B) Directly proportional to permeability of soil

Description : If Cv is the coefficient of consolidation, is the time and is drainage path of one dimensional consolidation of soil, the time factor Tv, is given by (A) Tv = d²/Cv t (B) Tv = t²/d²Cv (C) Tv = Cv3 /d²t (D) Tv = Cv t/dt

Last Answer : Answer: Option D

Description : Before constructing a dam, the factor to be considered for controlling sedimentation, is (A) Selection of dam site (B) Construction of check dams (C) Providing vegetation screens (D) All the above

Last Answer : (D) All the above

Description : To indicate proper control of consistency of a freshly mixed concrete for pavement construction, the slump should be between (A) 3 to 5 cm (B) 4 to 6 cm (C) 5 to 7 cm (D) 7 to 10 cm

Last Answer : Answer: Option D

Description : The binder normally used in flexible pavement construction is (A) Cement (B) Lime (C) Bitumen (D) None of the above

Last Answer : Answer: Option C

Description : Which of the following are elements of International Strategy framework? A. Climatic Conditions B. Country specific migrants C. Lingual Advancements D. Factor Conditions

Last Answer : Factor Conditions

Description : Name a state which produces short staple cotton. Which climatic and soil conditions favour the cultivation of cotton in the state mentioned ? -Geography

Last Answer : Maharashtra. Climate condition: Temperature: 20°C to 32°C at least 200 frost free climate. Rainfall: Between 50 cm to 120 cm abundant sunshine is required during ripening. Soil: Black Cotton soil is ideal.

Description : Name the process by which laterite soil is formed. What climatic conditions are responsible for its formation ? -Geography

Last Answer : Laterite soils are formed by Leaching'. Leaching is a process in which the nutrients of the soil get percolated down below the soil due to heavy rainfall, leaving behind the top soil ... climatic condition responsible for it is high temperature and heavy rainfall with alternate dry and wet period.

Description : The processes of ............ and .........go on simultaneously and generally there is a balance between the two ? (a) Denudation and erosion (b) Soil formation and erosion (c) Soil formation and denudation (d) Climatic conditions and soil erosion

Last Answer : (b) Soil formation and erosion

Description : Following type of pavement is generally known as flexible pavement (A) Water-bound macadam roads (B) Stabilised soil roads (C) Road constructed with various layers of building material well compacted (D) All the above

Last Answer : Answer: Option D

Description : Suggest the minimum grade of concrete for following exposure condition. i) RCC work ii) Water retaining structure iii) Sea water construction iv) Pre-stressed concrete

Last Answer : Minimum grade of concrete for following exposure condition: i) RCC work = M 20 ii) Water retaining structure = M 25 iii) Sea water construction = M 20 for PCC and M 30 for RCC iv) Pre-stressed concrete = M 30

Description : ed planting is practiced for row crops in (a) Semi-arid conditions to place seed deep in moist soil (b) High rainfall areas to improve surface drainage (c) Irrigated areas leaving more space for operation of equipments (d) Both (b) and (c)

Last Answer : d) Both (b) and (c)

Description : Lister planting or furrow planting is practiced for (a) High rainfall areas to improve surface drainage (b) Semi-arid conditions to place seed deep in moist soil (c) Areas where natural moisture conditions are favourable (d) Irrigated areas leaving more space for operation of equipments

Last Answer : (b) Semi-arid conditions to place seed deep in moist soil

Description : Traffic intensity in Queuing Theory is also called........................... a. Service factor b. Arrival factor c. Utilisation factor d. None of these

Last Answer : c. Utilisation factor

Description : Preliminary project report for a road project must contain (A) The detailed estimated cost based on detailed design (B) The several alternatives of the project that have been considered (C ... , traffic survey, concept design and approximate cost (D) The contract documents for inviting tenders

Last Answer : (C) The soil survey, traffic survey, concept design and approximate cost

Description : While filling the tender for any work, the contractor considers (A) Site survey (B) Availability of construction materials (C) Availability of labour (D) All the above

Last Answer : (D) All the above

Description : Why Are Separation Membranes Used Between Concrete Pavement Slab And Sub-base?

Last Answer : Answer : The purpose of separation membrane between the concrete pavement slab and the sub-base are as follows:  The separation membrane reduces the frictional forces between the concrete slabs and ... of it. A good example of a separation membranes is polythene sheeting which is commonly used.

Description : In ideal pavement is constructed with (A) Bricks (B) Hard soil (C) Portland cement concrete (D) Tar

Last Answer : Answer: Option C

Description : Pavement is said to be flexible if it contains (A) Water bound macadam surface (B) Stabilised soil base constructed of lime cement or tar (C) Bitumen-bound stone layer of varying aggregates (D) All the above

Last Answer : Answer: Option D

Description : For shear strength, triaxial shear test is suitable because (A) It can be performed under all three drainage conditions (B) Precise measurement of the pore pressure and volume change during the test is possible (C) Stress distribution on the failure plane, is uniform (D) All the above

Last Answer : (D) All the above

Description : A triaxial shear test is preferred to direct shear test, because (A) It can be performed under all three drainage conditions with complete control (B) Precise measurement of pore pressure and change in ... possible (C) Stress distribution on the failure plane, is non uniform (D) None of these

Last Answer : Answer: Option A

Description : From which of the following factor has not influence the drainage density: (A) Climate (B) Topography (C) Soil infiltration capacity (D) Anthropogenic activity (E) Vegetation (F) Geology

Last Answer : (D) Anthropogenic activity 

Description : Write the procedure of construction of cement concrete pavement showing its components. 

Last Answer : Construction procedure of Concrete Roads: 1) Preparation of subgrade by proper compaction 2) Provision of sub base to support subgrade 3) Placing of forms i.e. Steel channels 4) Batching and ... method 11) Filling of joints using joint sealers 12) Opening of traffic after cleaning

Description : State the two uses of the following construction materials: i) Hollow blocks ii) Pavement blocks 

Last Answer : i) Hollow Blocks: a) Used for external load bearing walls, b) Panel walls, c) Columns, d) Retaining Walls e) Compound Walls, f) Used for sound insulation g) It Keeps the house cool in summer ... give pleasant look d) Petrol pumps e) gardens f) Airports g) Kids play area h) Jogging tracks

Description : If the group index value of sub-grade is between 5 and 9, then the sub-grade is treated as (A) Good (B) Fair (C) Poor (D) Very poor

Last Answer : Answer: Option C

Description : A structure is erected on an impervious clay whose thickness is 12 m. Drainage is possible both at upper and lower surfaces. Coefficient of consolidation is 0.015 cm2 per minute. For attaining 50% consolidation with a ... 20, the number of days required (A) 3233 (B) 3123 (C) 33331 (D) 3313

Last Answer : Answer: Option C

Description : The area of a drainage basin whose axial length is 100 km is 2500 sq. km. Its form factor is (A) 0.10 (B) 0.20 (C) 0.25 (D) 0.35

Last Answer : Answer: Option C

Description : The form factor of a drainage basin is obtained by dividing (A) Area of the basin by the axial length (B) Average width of the basin by the axial basin (C) Area of the basin by the square of the axial length (D) Both (b) and (c

Last Answer : Answer: Option D