Description : During project estimation, project manager estimates following A. project cost B. project duration C. project effort D. all of the above
Last Answer : D. all of the above
Description : When using a function point estimation worksheet, there are 14 factors that impact the complexity of a project. These factors include _____. a. data communications, time tradeoffs, and ... programming language d. reports printed and PCA e. x-rays, extensibility, and operational conversion
Last Answer : b. end-user efficiency, data communications, and reusability
Description : The process of assigning values for the time and effort needed to perform a system project is called _____. a. analysis b. estimation c. identifying d. planning
Last Answer : b. estimation
Description : This activity is undertaken once the development activities start? A. Project Planning B. Project Monitoring and Control C. Project size estimation D. Project cost estimation
Last Answer : B. Project Monitoring and Control
Description : Which of the following serves as metrics for project size estimation? A. Lines of codes B. function point C. Number of persons D. Only A & B
Last Answer : D. Only A & B
Description : Science bases its estimation of the size of a product on a) Files (Fi), Flows (Fl) and Processes (Pr) b) Lines of Code (kLOC) c) Function Points (FP) d) operands and operators e) Feature Points (FeP).
Last Answer : d) operands and operators
Description : _____ is the process of planning and controlling the development of a system within a specified time frame at a minimum cost with the right functionality. a. Project management b. Symantic timeline c. Task identification d. Time estimation e. Work plan
Last Answer : a. Project management
Description : Function points are used to measure the estimated _____ of a project. a. complexity b. effort required c. program size d. time required
Last Answer : c. program size
Description : Algorithmic cost estimation in different organisations may be different for the same application development, because a) Different organisations consider complexity factors differently b) Different organisations may use ... measurement of productivity may vary e) All of the above may be true.
Last Answer : e) All of the above may be true.
Description : Which technique is applicable when other projects in the same analogy application domain have been completed? a) Algorithmic cost modelling b) Expert judgement c) Estimation by analogy d) Parkinson’s Law
Last Answer : c) Estimation by analogy
Description : A is developed using historical cost information that relates some metric to the project cost. a) Algorithmic cost modelling b) Expert judgement c) Estimation by analogy d) Parkinson’s Law
Last Answer : a) Algorithmic cost modelling
Description : In estimation of cost functions, variations in a single activity level represents the A. related total costs B. related fixed cost C. related variable cost D. related per unit cost
Last Answer : A. related total costs
Description : Relationship based on unrelated level of activity and past data of cost is measured with help of A. cost estimation B. price estimation C. unit estimation D. production estimation
Last Answer : A. cost estimation
Description : In the project planning, which of the following is considered as the most basic parameter based on which all other estimates are made? A. project size B. project effort C. project duration D. project schedule
Last Answer : A. project size
Description : Problems with using Lines of Code to measure the size of a product include(s) a) The creation of source code is only part of the development effort b) The Lines of Code (LOC) will differ between ... The final size (kLOC) can only be determined once the product is delivered e) All of the above.
Last Answer : e) All of the above.
Description : Which of the following are parameters involved in computing the total cost of a development project? a) Hardware and costs b) Effort costs c) Travel and training costs d) All of the mentioned
Last Answer : d) All of the mentioned
Description : Which stage of project management life cycle requires the maximum time of completion A.Conceptualization B.Planning C.Execution D.Estimation
Last Answer : C.Execution
Description : . Which of the following is empirical estimation technique? (i) expert judgement (ii) Delphi estimation (iii) COCOMO (iv) Critical path Method A. only i, ii & iii B. only i & ii C. only i, iii & iv D. All of the above
Last Answer : B. only i & ii
Description : Heuristics estimation technique depends on A. educated guess B. prior experience C. Common sense D. All of the above
Last Answer : D. All of the above
Description : Which of the following serves as project estimation technique? A. Empirical estimation B. Heuristic technique C. Analytical estimation D. All of the above
Description : Which of the following activity is not the part of project planning? A. project estimation B. project scheduling C. project monitoring D. risk management
Last Answer : C. project monitoring
Description : In the stock-price beta estimation for the Coca-Cola Company, the dependent variable is the: A. return on Coca-Cola. B. price of Coca-Cola stock. C. return on the S&P 500. D. value of the S&P 500 Index.
Last Answer : A. return on Coca-Cola.
Description : Which of the following is/are main parameters that you should use when computing the costs of a software development project? a) travel and training costs b) hardware and software costs c) effort costs (the costs of paying software engineers and managers) d) all of the mentioned
Last Answer : d) all of the mentioned
Description : Complete the following statement. In a weak matrix environment, the project manager, Eric, has to constantly make an effort to influence his project team and stakeholders to ensure project success. ... managers. d. there are no functional managers. e. Eric has flexibility on authority.
Last Answer : b. Eric has no or little authority.
Description : Project management is a rationally planned and organised effort to achieve a specific goal. (True/False)
Last Answer : Ans. True
Description : Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model
Last Answer : c) A reuse model
Description : computing the costs of a development project? (A)travel and training costs (B) hardware and costs (C) effort costs (the costs of paying engineers and managers) (D)All of the mention
Last Answer : (D)All of the mention
Description : Scope creep is only a minor factor in projects running over schedule, and every effort should be made to incorporate any changes into the present system if they would truly be beneficial.
Last Answer : Ans: False
Description : Assume a systems development project effort calculation determines that the system will require 240 function points. If the developers choose to implement this system in the C programming language, approximately ... without more information c. exactly the same d. much greater e. much less
Last Answer : e. much less
Description : A Communications Management Plan does the following: A. Coordinates an effort to communicate in meetings effectively B. Lays out a plan on how to communicate with your Project ... and efficiently. D. Coordinates the communication between project leaders and uninterested project members
Last Answer : C. Lays out the approach and method for delivering information effectively and efficiently.
Description : How does a project differ from an ongoing work effort? A. It is unique B. It involves more than one person C. It has a project manager D. It is not a repetitive process that follows an organization’s existing procedures (Ans.)
Last Answer : D. It is not a repetitive process that follows an organization’s existing procedures (Ans.)
Description : To assist in budget control, it is suggested that the estimate occur at the _____ ____ ______ level of the WBS 1. Highest 2. Lowest 3. Major work effort 4. Third
Last Answer : 2. Lowest
Description : What Is Effort Variance?
Last Answer : Effort Variance = (Actual effort – Estimated Effort) / Estimated Effort.
Description : The time with which direct cost does not reduce with the increase in time is known as A.crash time B.normal time C.optimistic time D.standard time
Last Answer : B.normal time
Description : )The fixed price contract is advantageous to the buyer because it: 1. requires extremely well defined specifications 2. requires formal procedures for scope changes 3. contractor assumes financial and technical risk 4. has a known cost
Last Answer : 3. contractor assumes financial and technical risk
Description : The return available by investing the capital elsewhere is known as (A) profit rate (B) discount rate (C) opportunity cost (D) return on investment
Last Answer : (C) opportunity cost
Description : Which of the following can estimate size of project directly from problem specification? A. LOC B. Function Point Metric C. Both D. None
Last Answer : B. Function Point Metric
Description : "Larger code size doesnot necessarily mean better quality or higher efficiency." A. True B. False C. NA D. NA
Last Answer : A. True
Description : Lines of Code measures the size of project by counting A. the number of source instructions B. the comments in the code C. the header lines D. All of the above
Last Answer : A. the number of source instructions
Description : It is often difficult to estimate size at an early stage in a project when only a specification is available a) True b) False
Last Answer : a) True
Description : What is related to the overall functionality of the delivered ? a) Function-related metrics b) Product-related metrics c) Size-related metrics d) None of the mentioned
Last Answer : b) False
Description : You are working in CareerRide as a project manager. What will you do to minimize the risk of failure? a. Request a large budget b. You will increase the team size c. Track progress d. None of the above
Last Answer : c. Track progress
Description : A function point is a measure of program size based on the number and complexity of inputs, outputs, queries, files and program interfaces.
Last Answer : Ans: True
Description : A(n) ____________ is a measure of program size based on the number and complexity of inputs, outputs, queries, files, and program interfaces. a. function point b. line of code c. project plan d. standard module e. workplan
Last Answer : a. function point
Description : To identify the tasks for a work plan the project manager can _____. a. control and direct the project b. estimate the size, staff the project, and remember technical skills c. establish a ... of the SDLC and the steps that occur in each e. set conservative numbers for the project software
Last Answer : d. list the four phases of the SDLC and the steps that occur in each
Description : Political unrest, budget overruns, size and complexity of the project Answer: B (8)Decision trees are best used for : 1. Determining the interaction of the amount at stake and the expected ... and the associated events 4. A flow chart which determines the standard deviation of the risk event
Last Answer : 3. An illustration of how to see the interactions between decisions and the associated events
Description : )Which of the following fit the category of external risks? 1. Project delays, budget under-runs, movement of city utilities 2. Regulatory, currency changes, taxation 3. Natural disasters, ... , design, social impact 5. Political unrest, budget overruns, size and complexity of the project
Last Answer : 2. Regulatory, currency changes, taxation
Description : Project performance consists of (A) Time (B) Cost (C) Quality (D) All of the above
Last Answer : (C) Quality
Description : Which one of the following statements best defines an estimate? a. An approximation of project time and cost targets, refined throughout the project life cycle. b. A prediction of a future ... . A situation that affects or influences the outcome of the project expressed in time or cost terms
Last Answer : a. An approximation of project time and cost targets, refined throughout the project life cycle.