In Intermediate COCOMO the mode that represents complex 

products is referred to as

a) Embedded

b) Semidetached

c) Organic

d) Multiplicative

e) onolithic.

1 Answer

Answer :

a) Embedded

Related questions

Description : A software company needs to develop a project that is estimated as 1000 function points and is planning to use JAVA as the programming language whose approximate lines of code per function point is accepted as 50. Considering a=1. ... ? (1) 11.2 months (2) 12.2 months (3) 13.2 months (4) 10.2 months

Last Answer : Generally, any projects are measured in weeks. However, the complex project might take more time depending on the level of object re-use available.

Description : . Which of the following is empirical estimation technique? (i) expert judgement (ii) Delphi estimation (iii) COCOMO (iv) Critical path Method A. only i, ii & iii B. only i & ii C. only i, iii & iv D. All of the above

Last Answer : B. only i & ii

Description : Which of the following technique overcomes drawback related to LOC? A. Project Planning Sheet B. Function Point Metric C. COCOMO D. COCOMO2

Last Answer : B. Function Point Metric

Description : The COCOMO model takes into account different approaches to development, reuse, etc. a) True b) False

Last Answer : b) False

Description :  The COCOMO model to convert lines of code estimates into person-month estimates  was designed by Allen Albrecht of IBM.

Last Answer : Ans: False

Description : The model that assumes that effort and development time are functions of product size alone is (A) Basic COCOMO model (B) Intermediate COCOMO model (C) Detailed COCOMO model (D) All the three COCOMO models

Last Answer : (A) Basic COCOMO model

Description : A project whose acceptance requires the acceptance of one or more alternative projects is referred to as . A. a mutually exclusive project. B. an independent project. C. a dependent project D. a contingent project E. none of the above

Last Answer : A. a mutually exclusive project.

Description : A project whose acceptance requires the acceptance of one or more alternative projects is referred to as . A. a mutually exclusive project. B. an independent project. C. a dependent project D. a contingent project E. none of the above

Last Answer : A. a mutually exclusive project.

Description : Fill in the blank. A __ represents the sequence of the activities needed to  complete the project. Select one: a. work break down structure b. scope of work c. project logic diagram d. run chart e. step change

Last Answer : c. project logic diagram

Description : Fill in the blank. Risk represents the likelihood that an event will happen during  the life of the project that will negatively affect the ________________ of project goals. Select one: a. scope creep b. achievement c. float d. rough order of magnitude e. slack

Last Answer : b. achievement

Description : As a new project manager, Karen was worried about a statement from  her client: your project deliverable is in low quality with low grade .  According to PMBOK, how can you help Karen ... quality with high grade is always desirable to your client. e. High quality always  represents high grade.

Last Answer : c. Low quality represents a true problem, but low grade might not be the case.

Description : Which of the following statements is true regarding contracts? Select one: a. They are the filters through which project members screen information that is shared. b. They do not lend ... information-rich  environment will suffer. e. Contracts promote the growth of a trusting project culture.

Last Answer : b. They do not lend themselves to create an environment of trust.

Description : Michelle has decided to use a shortcut to determine the complexity of the project she  is currently managing. She has assigned the adjusted project complexity (PCA) a value  of .65. She has determined that ... _____.  a. bi-lateral  b. complex c. microconvergent  d. normal  e. very simple

Last Answer : e. very simple

Description : Kathryn has little experience estimating the time it will take to complete a systems  project. She has just completed the planning phase of the project. What method should she use to estimate the ... b. function points  c. industry standards  d. Microsoft Project  e. more complex approach

Last Answer : c. industry standards

Description :  ____ structures are also referred to as the Organisational Chart.

Last Answer : Ans. Organisational

Description : The life cycle can be said to consist of a series of phases. The  classical model is referred to as the waterfall model. Which phase  may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation

Last Answer : (a) Requirements

Description : Requirements traceability is one of the most important part requirement management. It may also be referred to as the heart of requirement management. a) True b) False

Last Answer : a) True

Description :  The project team has just determined that the deadline for completion will not be met.  In order to deliver a high quality system on schedule, the team has requested that the  features be ... that a fixed deadline be imposed for the project. This technique  is referred to as SDLC methodology.

Last Answer : Ans: False

Description :  In a project schedule, the sequence of activities which cannot be delayed during the  course of the project without extending the project end date is referred to as the:  A. Action plan B. Critical path C. Schedule baseline D. Slack line

Last Answer : B. Critical path

Description : The time necessary to complete a project is referred to as: 1. Implementation time  2. Life cycle  3. Operations cycle  4. Production cycle

Last Answer : 2. Life cycle

Description : The amount of current assets that varies with seasonal requirements is referred to as  working capital. A. permanent B. net C. temporary D. gross

Last Answer : C. temporary

Description : The amount of current assets required to meet a firm's long-term minimum needs is  referred to as working capital. A. permanent B. temporary C. net D. gross

Last Answer : A. permanent

Description : A project whose acceptance requires the acceptance of one or more alternative projects is referred to as . A. a mutually exclusive project B. an independent project C. a dependent project D. None of the above

Last Answer : B. an independent project

Description : A project whose acceptance precludes the acceptance of one or more alternative projects is referred to as . A. a mutually exclusive project. B. an independent project. C. a dependent project. D. a contingent project.

Last Answer : A. a mutually exclusive project.

Description : A project whose acceptance precludes the acceptance of one or more alternative projects is referred to as . A. a mutually exclusive project. B. an independent project. C. a dependent project D. a contingent project

Last Answer : C. a dependent project

Description : A project whose acceptance precludes the acceptance of one or more alternative projects is referred to as . A. a mutually exclusive project. B. an independent project. C. a dependent project D. a contingent project

Last Answer : C. a dependent project

Description : Which of the following statements regarding the complement system are true? a. Complement activation yields products which are directly cytotoxic as well as products which act indirectly via activated ... and classical pathways converge proximal to generating the membrane attack complex (C5b-9)

Last Answer : Answer: a, d The complement system is composed of two different but linked sequences, the classic and alternative pathways. The pathways involve serum proteins that act to amplify the inflammatory-immune ... the C5 level proximal to generating the membrane attack complex (C5b-9) (Figure 6-3)

Description : Which of the following represents the estimated value of the work actually  accomplished?  A. Earned value (EV)  B. Planned value (PV)  C. Actual cost (AC  D. Cost variance (CV)

Last Answer : A. Earned value (EV)

Description : On a project the project manager should strive for a "Quality Level" that : 1. is the highest level possible  2. is as close to the project objectives as possible  3. represents the least cost to the project.  4. Exceeds the specified requirements of the project.

Last Answer : 2. is as close to the project objectives as possible

Description : Which from the following represents the correct project cycle? (A) Planning→Initiating→Executing→Closing (B) Planning→Executing→Initiating→Closing (C) Initiating→Planning→Executing→Closing (D) Initiating→Executing→Planning→Closing

Last Answer : (C) Initiating→Planning→Executing→Closing

Description : In estimation of cost functions, variations in a single activity level represents the A. related total costs B. related fixed cost C. related variable cost D. related per unit cost

Last Answer : A. related total costs

Description : Constantine suggests four “organizational paradigms” for  engineering teams. The best project team organizational model to use when handling extremely complex problems is  a. Random paradigm b. Open paradigm c. Synchronous paradigm d. Closed paradigm

Last Answer : a. Random paradigm

Description : The activities that make up the project are not simple, repetitive  acts, such as mowing the lawn, painting the house, washing the car, or loading the delivery truck. a. They are complex b. They are simple c. Different d. Same

Last Answer : a. They are complex

Description : the variations are...................in nature a. Random b. Consistent c. Complex d. Compound

Last Answer : a. Random

Description : A project is a sequence of a. Unique b. Complex c. connected activities d. all the above

Last Answer : d. all the above

Description : Using the shortcut method to determine the complexity of a systems project, a very  complex system having 300 unadjusted function points would have 405 adjust function  points.

Last Answer : Ans: True

Description : The most significant challenge to project managers is _____.  a. lack of project management training  b. no one really understands how to manage a complex systems development project  ... tools that can assist in controlling project progress  d. unrealistic schedule demands by project sponsors

Last Answer : d. unrealistic schedule demands by project sponsors

Description :  You need to convey some very complex, detailed information to the project  stakeholders. What is the best method for communicating this kind of information?  A. Verbal  B. Vertical  C. Horizontal  D. Written

Last Answer : D. Written

Description : The number of function points of a proposed system is calculated as 500. Suppose that the system is planned to be developed in Java and the LOC/FP ratio of Java is 50. Estimate the effort (E) required to ... ) 25 person months (B) 75 person months (C) 62.5 person months (D) 72.5 person months

Last Answer : (C) 62.5 person months 

Description : Dr APJ Abdul Kalam, inaugurated state-of-the-art Navigation and Embedded Computers Complex on 9 Dec 2011 at (a) RCI (b) FRL (c) ITR (d) DFRL

Last Answer : a) RCI

Description : is a branch of Science which deals with the helping machine find solutions to complex problems in a more human like fashion a. Artificial Intelligence b. Internet Od Things c. Embedded system d. cyber Security

Last Answer : a. Artificial Intelligence

Description : ______ is a branch of computer science which deals with helping machines finds solutions to complex problems in a more human like fashions A. Artificial Intelligence B. Internet of Things C. Embedded System D. Cyber Security

Last Answer : A. Artificial Intelligence 

Description : The electrophile, `E^((o+))` attacks the benzene ring to generate the intermediate `sigma`-complex. Of the following which `sigma`-complex is of lowes

Last Answer : The electrophile, `E^((o+))` attacks the benzene ring to generate the intermediate `sigma`-complex. Of the ... is of lowest energy? A. B. C. D.

Description : The advantage of following the IEEE Standard for drawing up a Project Management Plan (SPMP) - see IEEE Standard 1059.1 1987 - is a) It is drawn up by representatives from major  ... each organisation for a  particular applicationarea, development team or  technique. e) All of the above.

Last Answer : e) All of the above.

Description : Engineering: a) Is a set of rules about developing products b) Has been around as a discipline since the early 50's c) Started as a response to the so-called Crisis' of the ... with all the  aspects of production e) Is now a mature discipline on par with other established  engineeringfields

Last Answer : d) Is an engineering discipline concerned with all the  aspects of production

Description : Two successive translations are a.Multiplicative b.Inverse c.Subtractive d.Additive

Last Answer : d.Additive

Description : We can combine the multiplicative and translational terms for 2D into a singlematrix representation by expanding a.2 x 2 matrix into 4x4 matrix b.2 x 2 matrix into 3 x 3 c.3 x 3 matrix into 2 x 2 d.Only c

Last Answer : b.2 x 2 matrix into 3 x 3

Description : What is the multiplicative inverse of 1/4?

Last Answer : 0.25