Routine maintenance of dry-type transformers should include ______________. A. preventing the entrance of water from broken pipe lines steam lines B. keeping protective surfaces and insulating bushings free of dirt and conductive debris C. periodic testing of insulation resistance with a megger D. all of the above

1 Answer

Answer :

Answer: D

Related questions

Description : Routine maintenance of a ship's service alternator should include ______________. A. changing the pedestal bearing insulation yearly B. megger testing of all rectifying diodes C. lubricating excitation slip rings D. periodic cleaning of the air filters or screens

Last Answer : Answer: D

Description : Routine maintenance of dry-type transformers should include ____________. A. cleaning the windings, if accessible, with a vacuum cleaner or very low pressure air B. measuring and recording the winding ... . making sure that the units are close to bulkheads or corners to protect them from damage

Last Answer : Answer: A

Description : Which of the following statements, concerning the general maintenance of a brushless generator, is correct? A. Paint should be applied to insulating surfaces on an annual basis. B. Alcohol should be used to ... . D. Accessible generator parts should be wiped with a clean dry rag on a periodic basis.

Last Answer : Answer: D

Description : Routine A.C. motor maintenance should include periodic ______________. A. thermometer readings at normal loads to detect abnormal temperature rises B. inspection of the motor's internals for loose rotor bars ... C. bearing replacement each year using sealed units if available D. all of the above

Last Answer : Answer: A

Description : In addition to testing the calibration of a circuit breaker, maintenance should include all of the following EXCEPT ______________. A. changing out of magnetic elements and thermal heaters yearly B. ... for loose or missing parts D. making sure foreign matter does not block tripping element

Last Answer : Answer: A

Description : Proper storage battery maintenance includes ____________. A. keeping connections tight and casing surfaces clean B. making sure electrolyte level is below the separator plates C. insulating the terminals with naval jelly D. maintaining a high charging rate at all times

Last Answer : Answer: A

Description : Select insulating materials for following parts : (i) Insulation between heating element and base plate of electric iron. (ii) Insulation used over copper or aluminium conductor used for making coils. (iii) Transformer bushings. (iv) Insulation between transmission line and pole.

Last Answer : Parts Insulating Materials  Insulation between heating element and base plate of electric iron. Mica Insulation used over copper or aluminium conductor used for making coils.  ... Transformer bushings Porcelain  Insulation between transmission line and pole. Porcelain

Description : Complete controller maintenance includes _____________. A. periodic testing of protective devices B. checking for loose or worn contacts and weak springs C. maintaining a sufficient supply of spare parts D. all of the above

Last Answer : Answer: D

Description : The need for insulation cleaning may be determined by _____. A. visual inspection for dirt accumulation B. high megger readings C. low operating temperature D. the time period since the last cleaning

Last Answer : Answer: A

Description : Routine maintenance of lead acid batteries should include _____________. A. keeping the terminals clean B. coating cable connections with petroleum jelly C. maintaining a trickle charge D. all of the above

Last Answer : Answer: D

Description : Two contributors of electronic console failures are heat and vibration. To combat some of their effects, preventive maintenance procedures should include ______________. A. systematic rotation of circuit cards with those ... bolts and changing of the air in the control room D. all of the above

Last Answer : Answer: B

Description : A steam pipe is intended to be insulated with two layers of insulating materials of different thermal conductivities. For minimum heat transfer to take place (A) The better insulation material should be put just ... to which insulating material is to be put inside (i.e., just next to the pipe)

Last Answer : (A) The better insulation material should be put just next to pipe (i.e., inside)

Description : Electrical machinery insulation will break down more rapidly due to _________________. A. low loading of motors and generators B. frequent megger testing C. high temperatures and vibration D. high operating frequencies

Last Answer : Answer: C

Description : How bushings are terminated inside the transformers?

Last Answer : By grooving method or by binding wire method.  

Description : As part of a routine maintenance program for deck machinery, you should ___________. A. inspect electrical wiring and pushbutton switches for evidence of corrosion or burned insulation B. disassemble ... covers and ventilate as weather permits D. Check drum switch contact pressure every three months

Last Answer : Answer: A

Description : When troubleshooting motor controllers, a shorted relay or contactor coil is often indicated by _______________. A. a resistance reading of 'infinity' on an ohmmeter B. charred insulation and/or a blown ... of the coil's leads to ground D. a higher-than-normal voltage reading across the winding

Last Answer : Answer: B

Description : Before testing insulation with a megohmmeter, the windings of large machines should be grounded for about 15 minutes just prior to the test as the ______________. A. insulation may be damaged ... number of leakage paths D. larger machines may acquire a charge of static electricity during operation

Last Answer : Answer: D

Description : You are testing the insulation in an AC generator with a megohmeter. The resistance value of a dry, clean winding will ____________. A. continue to rise as the test potential is maintained, ... fairly steady after 5 to 7 minutes D. stabilize after approximately 2 to 4 minutes of fluctuation

Last Answer : Answer: A

Description : Periodic testing by a shoreside support technician using a special camera which can detect potentially dangerous loose or corroded bus bar and controller connections is termed ______________. A. heat sensitive thermography B. visual pyrotronics C. corrosion electrolysis D. electric vibroanalysis

Last Answer : Answer: A

Description : 76 The changes in volume of transformer cooling oil due to variation of atmospeheric temperature during day and night is taken care of by which part of transformer? A. Conservator B. Breather C. Bushings D. Buchholz relay

Last Answer : A. Conservator

Description : The reading at 'K' on the megger scale shown in the illustration, is ______________. EL-0044 A. 400 ohms B. 4,000 ohms C. 40,000 ohms D. 400,000 ohms

Last Answer : Answer: D

Description : A steam carrying pipeline is insulated with two layers of insulating materials with the inferior insulation material forming the inner part. If the two insulating layers are interchanged, the heat conducted ... ) Remain unaffected (D) May increase or decrease; depends on the thickness of each layer

Last Answer : Option C

Description : If the bearings of an electrical generator are failing more frequently than expected and the lubricating oil is sludging then you should ______________. A. check the connections to the output leads B. ... replace the bearing with a sealed roller type D. replace the thrust bearing of the prime mover

Last Answer : Answer: B

Description : In a co-current double pipe heat exchanger used for condensing saturated steam over the inner tube, if the entrance and exit conditions of the coolant are interchanged, then the rate of condensation ... Decrease (C) Remain unchanged (D) Either increase or decrease; depends on the coolant flow rate

Last Answer : (C) Remain unchanged

Description : A generator has been exposed to water and is being checked for its safe operation. Therefore, it is necessary to _______________. A. check for shorted coils with a growler B. take moisture readings with a ... a megger D. ground the commutator, or slip rings and run it at half load for 12 hours

Last Answer : Answer: C

Description : Which of the conditions listed will indicate the need to clean the insulation on the windings of an electric motor? A. Higher than normal operating temperature. B. Excessive vibration at normal speed. C. Sparking at the brushes. D. High megger readings.

Last Answer : Answer: A

Description : Which of the listed conditions could indicate the need for cleaning electrical insulation? A. Low ambient temperature B. Low operating temperature C. High dielectric strength D. Low megger readings

Last Answer : Answer: D

Description : Complete maintenance of electrical motors should include periodic checks for machine _____________. A. vibration B. watertight integrity C. speed droop D. reactive power

Last Answer : Answer: A

Description : A megger is to measure insulation resistance of a cable. The cable should be connected to   (a) Battery (b) DC supply (c) AC supply (d) No supply  

Last Answer : majorly in DC as well as AC......but ans is Battery

Description : To measure insulation resistance of equipments of voltage rating upto 440 V the megger generator must generate   (a) 220 V (b) 440 V (c) 500 V (d) None of these 

Last Answer : 500 V

Description : What is the Difference Between "Insulating", "Isolating", and "Shielded Winding" Transformers?

Last Answer : Insulating and Isolating transformers are identical. These terms are used to describe the isolation of the primary and secondary windings, or insulation between the two. A shielded winding transformer, ... are connected to each other electrically, are not of the insulating or isolating variety.

Description : Biological functions of lipids include (A) Source of energy (B) Insulating material (C) Maintenance of cellular integrity (D) All of these

Last Answer : Answer : D

Description : As shown in the illustration, what maintenance would be required of the circuit components? EL-0058 A. Change out both 'C' units monthly. B. Clean the glass surrounding 'E1' & 'E2' as needed. C. File ... upper end of 'G' every six months. D. Take megger readings on 'E1' & 'E2' windings quarterly.

Last Answer : Answer: B

Description : Magnet chatter or 'pumping' occurring in a magnetic contactor can be caused by ______________. A. dirt or grease on pole faces B. mechanical interference in the contacts C. chattering contacts on the control relay D. magnetic lock out of the contacts

Last Answer : Answer: C

Description : If your multimeter gives a reading in ohms when testing each end of each conductor of a three-conductor cable, this indicates ______________. A. continuity of the conductor B. an infinite resistance C. the presence of a partial ground D. that the conductor is not short circuited

Last Answer : Answer: A

Description : Which of the following statements best describes the material known as varnished cambric? A. Felted asbestos sealed with varnish. B. Cotton cloth coated with insulating varnish. C. Rubber ... Paper impregnated with mineral oil, specially wrapped with nonmetallic tape, and coated with varnish.

Last Answer : Answer: B

Description : Electrical leads and insulation on a motor should be painted with ____________. A. heat-resisting acrylic B. heat-resisting aluminum C. insulating varnish D. insulating white lead

Last Answer : Answer: C

Description : Grease coatings on electrical contact surfaces increase contact resistance and should be removed with a/an _______________. A. small wire brush B. compressed air jet C. clean dry cloth D. 10% solution carbon solvent and water

Last Answer : Answer: C

Description : Electrical failures in motors are caused by the breakdown of insulation, which may be caused by _____________. A. penetration of moisture B. accumulation of dirt C. overheating D. all of the above

Last Answer : Answer: D

Description : The greatest detrimental effect on idle electrical equipment, such as cargo pump motors, is the _____________. A. loss of residual magnetism B. absorption of moisture in the insulation C. insulation varnish flaking D. dirt collecting on the windings

Last Answer : Answer: B

Description : The advantage of using dental floss over rubber point interdentally: A. Remove plaque and debris in interproximal surfaces B. Polish C. Massage of the interdental papillae D. Aid and recognise subgingivally

Last Answer : A. Remove plaque and debris in interproximal surfaces

Description : When testing for blown fuses in a three-phase supply circuit to a motor, you should first ___________________. A. apply the megger across the tops of the line fuses B. apply an ammeter diagonally across ... of the line fuses D. ensure the circuit is de-energized, and then use a continuity tester

Last Answer : Answer: D

Description : Discharge switches are often located on hand-driven meggers. The purpose of these switches is to discharge capacitive charges stored in the _____________. A. megger hand generator B. megger movement coils C. tested equipment while conducting test D. tested equipment after testing

Last Answer : Answer: D

Description : In addition to undercutting the mica, proper maintenance of a D.C. motor's commutator includes _______________. A. side-cutting the copper segments and insulating the slots B. coating the copper surface with light machine ... in an oven at a maximum of 95°C for not over 8 hours D. all of the above

Last Answer : Answer: A

Description : Dropwise condensation occurs on __________ surfaces. (A) Clean and dirt free (B) Smooth clean (C) Contaminated cooling (D) Polished

Last Answer : (C) Contaminated cooling

Description : Part of the insulation of practically all electrical machinery is in the form of organic compounds which contain some amount of ______________. A. asbestos B. water C. fibre D. plastic

Last Answer : Answer: B

Description : During maintenance of circuit breakers, _______________. A. always smooth roughened contact surfaces with a file B. never pass more than rated breaker current through the overload heater element C. ... wear and misalignment of main contacts D. assume heater elements installed are of correct size

Last Answer : Answer: C

Description : Is Doble Testing valid on "Dry Type" transformers What is ANSI or IEEE 's opinion?

Last Answer : Refer this url to know about IEEE/ANSI