How do you calculate sales per labour hour?

1 Answer

Answer :

You findthe total value of sales,the total number of hours worked by all employees.Then divide the first by the second.

Related questions

Description : A contractor wishes to determine a suitable combination of manual labour and machine work for the excavation of a multistory construction. For every cum of excavation, 3 man-hours are needed; or 0.2 machine-hour. Costs ... total cost will be (a) 1500 cum (b) 1800 cum (c) 2250 cum (d) 2500 cum

Last Answer : (d) 2500 cum

Description : . A job is budgeted to require 3,300 productive hours after incurring 25% idle time. If the total labour  cost budgeted for the job is Rs36,300. What is the labour cost per hour( to the nearest cent)? (a) Rs 8.25 (b) Rs 8.80 (c) Rs 11.00 (d) Rs 14.67

Last Answer : (a) Rs 8.25

Description : CG Co manufactures a single product T. Budgeted production output of product T during June is  200 units. Each unit of product T requires 6 labour hours for completion and CG Co anticipates 20 per  cent idle time. Labour is paid at ... for March is (a) Rs 6,720 (b) 8,400 (c) 10,080 (d) 10,500

Last Answer : (d) 10,500

Description : During September, 300 labour hours were worked for a total cost of Rs 4800. The variable  overhead expenditure variance was Rs 600 (A). Overheads are assumed to be related to direct labour  hours of active working. What was the standard cost per labour hour? (a) Rs 14 (b) Rs 16.50 (c) Rs 17.50

Last Answer : (a) Rs 14

Description : During a period 17, 500 labour hours were worked at a standard cost of Rs 6.50 per hour. The  labour efficiency variance was Rs 7,800 favourable. How many standard hours were produced? (a) 1,200 (b) 16,300 (c) 17,500 (d) 18,700

Last Answer : (d) 18,700

Description : The formula used for calculation of labour rate variance is A. Total standard labour cost of actual output - Total actual cost of actual output B. (Standard rate per hour - Actual rate per hour) ... time - Actual time) * Standard rate per hour D. Abnormal idle hours * Standard hourly rate

Last Answer : B. (Standard rate per hour - Actual rate per hour) * Actual Hours

Description : In a heat treatment shop, steel components are heat-treated in batches of 80 Tons. The  heat treatment cycle is as follows;  Increase temperature from 30 OC to 850 OC in 3 hours.  ... efficiency of 80%, for same requirement. The investment towards installation of  the new furnace is Rs. 50

Last Answer : Quantity of steel treated per batch - 80 Tons a. Efficiency of Furnace: Useful heat supplied to steel - 80000 x 0.12 x (850 - 30)   = 7872000 kcal/batch .1 mark Total heat ... = Rs. 64400/batch Efficiency of new LPG furnace - 80% Heat supplied in new LPG furnace - 7872000/0.8

Description : If profit of the company is Rs 20,000 , sales is 10 per unit and variable cost is Rs 4 per unit calculate Margin of safety. a) Rs 33,333.33 b) Rs 16,666.67 c) Rs 10,000 d) Rs 20,000

Last Answer : a) Rs 33,333.33

Description : Calculate the labour turnover rate according to Separation method from the following: No. of workers on the payroll: - At the beginning of the month: 500 - At the end of the month: 600 During the month, 5 workers left ... engaged for an  expansion scheme. (a) 4.55% (b) 1.82% (c) 6% (d) 3%

Last Answer : (a) 4.55%

Description : Calculate the labour turnover rate according to replacement method from the following: No. of workers on the payroll: - At the beginning of the month: 500 - At the end of the month: 600 During the month, 5 workers left ... engaged for an expansion scheme. (a) 4.55% (b) 1.82% (c) 6% (d) 3%

Last Answer : (b) 1.82%

Description : Calculate workers recruited and joined from the following: Labour turnover rates are 20%, 10% and 6% respectively under Flux method, Replacement method and  Separation method. No. of workers replaced during the quarter is 80. (a) 112 (b) 80

Last Answer : (a) 112

Description : Calculate workers left and discharged from the following: Labour turnover rates are 20%, 10% and 6% respectively under Flux method, Replacement method and  Separation method. No. of workers replaced during the quarter is 80. (a) 112 (b) 80 (c) 48 (d) 64

Last Answer : (c) 48

Description : Calculate the prime cost from the following information: Direct material purchased: Rs. 1,00,000 Direct material consumed: Rs. 90,000 Direct labour: Rs. 60,000 Direct expenses: Rs. 20,000 Manufacturing overheads: Rs. 30,000 (a) Rs. 1,80,000 (b) Rs. 2,00,000 (c) Rs. 1,70,000 (d) Rs. 2,10,000

Last Answer : (c) Rs. 1,70,000

Description : Which of the following is not a method of cost absorption? (a) Percentage of direct material cost (b) Machine hour rate (c) Labour hour rate (d) Repeated distribution method

Last Answer : d) Repeated distribution method

Description : An artificial satellite is moving in a circular orbit of radius 42.250 km (approx). Calculate its linear velocity if takes 24 hour to revolve around earth.? -Science

Last Answer : Given r =42.250 km , T= 24 hour Linear velocity in circular motion is given by v=2πrT=2×3.14×42.25024=11.05km/hrv=2πrT=2×3.14×42.25024=11.05km/hr

Description : Calculate the number of free electrons passing through the filament of an electric lamp in one hour when the current through the filament is 0.32 A.

Last Answer : Calculate the number of free electrons passing through the filament of an electric lamp in one hour when the current through the filament is 0.32 A.

Description : Calculate the recoverable waste heat (Q, in kCal/hour) from flue gases using the followingparameters: V (flow rate of the substance) 2000 m3/hr r (density of the flue gas): 0.9 kg/m3 Cp (specific heat ... (temperature difference): 120 oC h (recovery factor): 50% a. 21600 b. 43200 c. 25600 d. 34000

Last Answer : 21600

Description : Calculate cost of sales from the following: Net Works cost: Rs. 2,00,000 Office & Administration Overheads: Rs. 1,00,000 Opening stock of WIP: Rs. 10,000 Closing Stock of WIP: Rs. 20,000 Closing stock of finished goods: Rs. ... Rs. 2,70,000 (b) Rs. 2,80,000 (c) Rs. 3,00,000 (d) Rs. 3,20,000

Last Answer : (b) Rs. 2,80,000

Description : There are 2 plants manufacturing the same product under one corporate management which has decided to merge them. Calculate Break -even point of the merged plant. Particulars Plant I Plant II Capacity operation 100% ... 000 2,40,000 Variable cost 4,40,000 1,80,000 Fixed cost 80,000 50,000simpl

Last Answer : c) Rs 5,00,000

Description : Alex has been asked to calculate the sales potential for a new line of electronic games his company has acquired. He has developed a general economic forecast for the next two years, used this to estimate ... The approach he is using appears to be: A)build up B)delphi C)break down D)regression

Last Answer : C)break down

Description : Some organizations have escalator clause in their labour agreements. What does this clause provide for ? (A) Automatic increase in wage/salary depending on seniority (B) Wage increase depending on output ... index (D) Automatic increase in wage/salary depending on increase in profits of the firm

Last Answer : Answer: Automatic increase in wage/salary depending on increase in profits of the firm

Description : A rising Per Capita Income will indicate a better welfare if it is accompanied by - (1) unchanged Income distribution overall. (2) changed Income distribution in favour of rich. (3) changed Income distribution in favour of poor. (4) changed Income disribution in favour of Industrial Labour.

Last Answer : (3) changed Income distribution in favour of poor. Explanation: Per capita income has lately been viewed as a better determinant of economic development and welfare. However, high inequality can still ... no quarters deprived as after all, economic welfare is a part and parcel of social welfare.

Description : The supply of labour in the economy depends on - (1) Population (2) National income (3) Per capita income (4) Natural resources

Last Answer : (1) Population Explanation: The supply curve for labor depends on variables such as population, wage rates, etc. in developing countries, the vast population base explains the relatively lower wage ... accessibility to labour supply. This is just the opposite in the case of developed countries.

Description : Process B had no opening inventory. 13,500 units of raw material were transferred in at Rs 4.50  per unit. Additional material at Rs1.25per unit was added in process. Labour and overheads were Rs 6.25  per completed unit and Rs ... 6562.50 (b) Rs. 12,250.00 (c) Rs. 14,437.50 (d) Rs. 25,375.00

Last Answer : (a) Rs 142,485

Description : A rising Per Capita Income will indicate a better welfare if it is accompanied by (1) unchanged Income distribution overall. (2) changed Income distribution in favour of rich. (3) changed Income distribution in favour of poor. (4) changed Income disribution in favour of Industrial Labour. 

Last Answer : changed Income distribution in favour of poor. 

Description : The supply of labour in the economy depends on (1) Population (2) National income (3) Per capita income (4) Natural resources

Last Answer : Population

Description : Preethi bought 240 reams of brown sheet at Rs 200 per ream and the expenditure on transport Was Rs 960. she had to pay an octroi duty of 1Rs per ream and the labour charges were Rs 120. What should she charge per ream to gain 80%(in Rs)?

Last Answer : Total CP= Rs(240*200)=Rs. 48000 Total expenditure=(960+1*240+120)= Rs. 1320 totalCp= 48000+1320=Rs. 49320 gain= 80% sp of 240reams = 49320*180/100 = Rs.88776 Sp per ream= 88776/240= Rs 369.9

Description : Is there a formula that can calculate rainfall on a gallons-per-square-mile basis?

Last Answer : answer:It's a relatively straightforward conversion problem. Once you figure out how big the drops are (and if you have a good count of drops per minute per area) then it's not hard at all. The tough ... but your example is close enough to that). EDIT: 1 Acre-Foot of water is 325,852 US gallons.

Description : Do you calculate the per unit cost of fun activities or services?

Last Answer : I calculate the savings in buying a Cineworld Unlimited card for the cinema. Over the summer I haven't been going much so it hasn't been cost effective but overall in the year it is a good buy for me. If ... and see some films because I have the card whereas if I had to pay I would give them a miss.

Description : How do advertisers calculate cost per impression?

Last Answer : answer:I think in this sense, CPM stands for cost per thousand not cost per mile. We do direct marketing. To calculate cost per thousand, take the cost of all the materials that went into a mailing ... by those materials. We take the resulting number and multiply it by 1000 to come up with the CPM.

Description : How to calculate the rate of rotation, in revolutions per minute.

Last Answer : answer:I’m going with 1.56 revs/min. Circumference = pi*d = 376.8 m Rate of rotation = 9.8 m/s, so it takes 38.4s to complete one rev. 60/38.4 = 1.56

Description : An electric bulb of 100 W is used for 8 h per day. Calculate the 'units' of energy consumed in one day by the bulb? -Physics 9th

Last Answer : Given : t=6 hrs P=0.06 kW Thus energy consumed per day is: E=Pt=0.06×6=0.36 kWh=0.36 units

Description : A 2.5 pound bag of apples cost $2.99. Calculate the unit rate showing pounds of apples per dollar and the unit rate showing dollars per pound of apples?

Last Answer : 2.99/2.5=1.196, so about $1.20 per pound of apples.

Description : Calculate the enthalpy of vaporisation per mole for ethanol. Given `DeltaS = 109.8 J K^(-1) mol^(-1)` and boiling point of ethanol is `78.5^(@)`.

Last Answer : Calculate the enthalpy of vaporisation per mole for ethanol. Given `DeltaS = 109.8 J K^(-1) mol^(-1)` ... KJ mol^(-1)` D. Some more data is required

Description : How do you calculate Average guests per day?

Last Answer : Need answer

Description : How do you calculate drops per minute?

Last Answer : Need answer

Description : How do you calculate assets per share?

Last Answer : Take total assets from the balance sheet and divide it by total number of shares

Description : Calculate the shaft diameter on rigidity basis if torsional moment is 196000N-mm, length of shaft is 1000mm. Permissible angle of twist per meter is 0.5’ and take G=79300N/mm2. a) None of the listed b) 41.2mm c) 35.8mm d) 38.8mm

Last Answer : b) 41.2mm

Description : Calculate the energy stored per unit volume in a dielectric medium due to polarisation when P = 9 units and E = 8 units. a) 1.77 b) 2.25 c) 36 d) 144

Last Answer : c) 36

Description : Calculate the polarisation vector of the material which has 100 dipoles per unit volume in a volume of 2 units. a) 200 b) 50 c) 400 d) 0.02

Last Answer : a) 200

Description : A butt weld has been made by MMA in a 50mm thick impact tested steel plate. The welding electrode used was a basic type, 5mm diameter. The measured welding parameters for one of the runs was 250 amps, 24 volts, using DC ... given to calculate the arc energy b) 1.9 kJ/mm c) 1.87 kJ/mm d) 2.0 kJ/mm

Last Answer : d) 2.0 kJ/mm

Description : From the following information, calculate the extra cost of material by following EOQ: Annual consumption: = 45000 units Ordering cost per order: = Rs. 10  Carrying cost per unit per annum: = Rs. 10  Purchase price per unit = Rs. ... ) No saving (b) Rs. 2,00,000 (c) Rs. 2,22,010 (d) Rs. 2,990

Last Answer : (d) Rs. 2,990

Description : Calculate re-order level from the following: Safety stock: 1000 units Consumption per week: 500 units It takes 12 weeks to reach material from the date of ordering. (a) 1000 units (b) 6000 units (c) 3000 units (d) 7000 units

Last Answer : (d) 7000 units

Description : Calculate EOQ (approx.) from the following details: Annual Consumption: 24000 units Ordering cost: Rs. 10 per order Purchase price: Rs. 100 per unitCarrying cost: 5% (a) 310 (b) 400 (c) 290 (d) 300

Last Answer : (a) 310

Description : Calculate Re-order level from the following: Consumption per week: 100-200 units Delivery period: 14-28 days (a) 5600 units (b) 800 units (c) 1400 units (d) 200 units

Last Answer : (b) 800 units

Description : Standard quantity of material per unit 5KG. Standard Price Rs 5 per KG. actual number of units 400 units. Actual quantity 2,200KG and price of material Rs 4.80 per kg. Calculate material price. a) 100(F) b) 500(A) c) 440(F) d) 600(F)

Last Answer : The standard quantity of material per unit is 5KG, so the standard quantity for 400 units would be: Standard quantity = 5KG/unit x 400 units = 2000KG The standard price per KG is Rs 5, so the ... material cost was lower than the standard material cost. Option (c) is the correct answer: 440(F).

Description : Calculate the shaft diameter on rigidity basis if torsional moment is 196000N-mm, length of shaft is 1000mm. Permissible angle of twist per meter is 0.5’ and take G=79300N/mm². a) None of the listed b) 41.2mm c) 35.8mm d) 38.8mm

Last Answer : b) 41.2mm

Description : What base year is used to calculate per capita income in India? (a) 2004-05 (b) 2011-12 © 2001-02 (d) 2014-15

Last Answer : (b) 2011-12