Indication post for detonator should be provided at a distance of ---------meter and ---------  meter for BG level crossing
a) 400 meters in 800 meters
b) 500 meters and 1200 meters  
c) 600 meters and 1200 meter *
d)600 meters and 1000 meters

1 Answer

Answer :

c) 600 meters and 1200 meter *

Related questions

Description : For protection of level crossing gate in an emergency on BG double line the Gateman should place one detonator at one place and 3 detonators at a subsequent place at a distance of ------- a) and------ ... c) 500 meters and 1000 meters d) 600 meters and 1200 meters* e) 800 meters in 1500 meters

Last Answer : d) 600 meters and 1200 meters*

Description : On Broad gauge tracks whistle indicator shall be provided at a distance of ---------- from level crossing along the track a) 400 meters b) 600 meters* c) 350 meters d) 500 meters

Last Answer : b) 600 meters*

Description : Ist detonator is planted at a distance of (i) 1200 Mt. from welding site .* (ii) 600 mtrs from welding site (iii) 30 mtrs from welding site (iv) None of the above

Last Answer : (i) 1200 Mt. from welding site .*

Description : Clear distance between consecutive sleepers not to exceed on bridges in BG is a) 450 mm* b) 600 mm c) 510 mm d) 500 mm

Last Answer : a) 450 mm*

Description : In case of a curved track on electrified, double line, BG section a) Duty hut cannot be provided for a level crossing. b) Duty hut should be on the inside of the curve. c) Duty hut should be on the outside of the curve.* d) Duty hut can be provided on any side of the curve.

Last Answer : c) Duty hut should be on the outside of the curve.*

Description : In LWR track on BG a) Level crossing should be separated by providing SEJs b) Level crossing cannot be provided in LWR. c) Level crossing should not fall within the breathing length of LWR* d) Level crossing should be laid with rail free fastenings.

Last Answer : c) Level crossing should not fall within the breathing length of LWR*

Description : Minimum distance of gate post from centre line of nearest track on BG is a) 2 meters b) 3 meters* c) 4 meters d) 5 meters

Last Answer : b) 3 meters*

Description : .In a temporary signaling arrangements for a bridge work in BG section, caution board shall be placed in advance of ……. m from start of the bridge/ work spot. a) 30 m b) 1200 m* c) 677 m d) 1000 m

Last Answer : b) 1200 m*

Description : On Broad Gauge tracks Banner flag at a level crossing shall be provided at a distance of--- ---------- from ends of check rail before opening the gate for road traffic. a) 5 meters* b) 3 meters c) 6 meters d) 30 meters

Last Answer : a) 5 meters*

Description : Speed breaker has to be provided on road approaches of level crossing at maximum feasible distance within Railway boundary but not exceeding a) 10 meters b) 15 meters c) 20 meters* d) 200 meters

Last Answer : c) 20 meters*

Description : On an unmanned level crossing stop board should be provided at a distance of --------- from the centre of nearest track a) 5 meters * b) 6 meters c) 3 meters d) 7.5 meters

Last Answer : a) 5 meters

Description : The maximum gradient in station yards should be ……. Unless special safely devices are adopted and/or special rules enforced. (a) 1 in 400* (B) 1 in 500 (c) 1 in 1000 (D) 1 In 600

Last Answer : (a) 1 in 400*

Description : Speed of the cutter bar in case of combine (grain) is :- a) 400 – 550 rpm b) 500 – 800 rpm C) 800 - 1000 rpm d) 1000 – 1200 rpm

Last Answer : a) 400 – 550 rpm

Description : Speed breaker of approved design shall be provided on either side of level crossing at ------ within Railway boundary a) 5 meters b) 15 meters c) 20 meters* d0 30 meters

Last Answer : c) 20 meters

Description : Minimum distance of duty hut from centre line of nearest track on BG is a) 2 meters b) 3 meters c) 4 meters d) 6 meters*

Last Answer : d) 6 meters*

Description : The Height Gauge for a level crossing should be located at least --------- from the gate post a) 3 meters b) 5 meters c) 8 meters* d) 10 meters

Last Answer : c) 8 meters*

Description : In case of Shot Welded Rails the fish plated joint should be avoided on Level Crossings within a distance of --------- from end of level crossing a) 3 meters b) 4 meters c) 5 meters d) 6 meters*

Last Answer : d) 6 meters*

Description : Last flag man is deputed at which distance from last detonator during protection of welding site . (i) 30 mts (ii) 50 mts (iii) 45 (iv) 60 mts

Last Answer : (iv) 60 mts

Description : Banner flag is planted at a distance of (i) At the site of work (ii) At 1200 mtrs from welding site (iii) At 30 mtrs from welding site (iv) 600 Mt. from welding site .*

Last Answer : iv) 600 Mt. from welding site .

Description : What is the assessed GMT service life of 60 kg 90 UTS rail? a. 650 GMT b. 600 GMT c. 800 GMT* d. 500 GMT

Last Answer : c. 800 GMT*

Description : What is Pre Heating Temperature of rail ends in AT Welding? (i) 300 ± 20oC (ii) 400 ± 20oC (iii) 500 ± 20oC (iv) 600 ± 20oC *

Last Answer : (iv) 600 ± 20oC *

Description : The average threshing outrun of a paddy in kg/hr is (A) 500 (B)650 (C)800 (D)1000

Last Answer : (B)650

Description : An important bridge is one which has total waterway of equal to or more than a) 1000 sq.metres.* b) 800 sq. metres c) 500 sq. metres d) 300 sq. metres

Last Answer : a) 1000 sq.metres.*

Description : Production at 60% activity is Rs 600 units, if flexible budget needs to be calculated at 80% activity what will be units produced? a) Rs 800 b) Rs 600 c) Rs 1200 d) Rs 1000

Last Answer : a) Rs 800

Description : The ruling gradient is 1 in 200 on a section of the BG track. If the track is laid in that place at a curve of 5 degrees then the allowable ruling gradient on the curve will be a) 1 in 16.7 b) 1 and 400 c) 1 in 240 d) 1 in 333*

Last Answer : d) 1 in 333*

Description : Number of bricks required for 1 cubic meter of brick masonry is a)400 b) 450 c) 500* d) 550

Last Answer : c) 500*

Description : Conversion of yellow phosphorous to red phosphorous is done by heating it in covered retorts at __________ °C in absence of air. (A) 50-80 (B) 250-400 (C) 1000-1200 (D) 800-900

Last Answer : (B) 250-400

Description : The cutter bar of a tractor operated on owner makes strokes/min (a) 400 – 500 (b) 500 – 750 (c) 800 – 1200 (d) 1250 – 1500

Last Answer : (c) 800 – 1200

Description : There should not be any combination joint on level crossing proper and its approaches up to a) 15 meters b) 30 meters c) 40 meters d) 50 meters

Last Answer : d) 50 meters

Description : Fish plated joint shall be avoided in check raisl and on the running rails within--------- from the end of level crossing a) 3 meters* b) 5 meters c) 10 meters d) 12 meters

Last Answer : a) 3 meters*

Description : The rail joint should be located at ----------- from the end of level crossing a) 2 meters b) 3 meters * c) 5 meters d)6 meters

Last Answer : b) 3 meters

Description : Check supervisor in RMS the standard for test sorting will be a) 500 article per hour b) 800 article per hour c) 1000 article per hour d) 1200 article per hour

Last Answer : a) 500 article per hour

Description : If the frequency spectrum of a signal has a bandwidth of500 Hz with thehighest frequency at 600 Hz, what shouldbe the samplingrate, according to the Nyquist theorem? A) 200 samples/s B) 500 samples/s C) 1000 samples/s D) 1200 samples/s

Last Answer : 1200 samples/s

Description : On Indian Railways a new level crossing can be provided with the approval of a) Chief engineer b) General Manager c) Commissioner of Railway Safety d) None of the above*

Last Answer : d) None of the above

Description : The clear distance between consecutive sleepers laid over unballasted bridge on BG should not exceed a)300mm b)400mm c)450mm* d)550mm

Last Answer : c)450mm*

Description : n Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 12.20 < 30.5 m a) 300 mm b) 600 mm* c) 500 mm d) 450 mm

Last Answer : b) 600 mm*

Description : In Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 6.10 < 12.2 m a) 300 mm b) 600 mm c) 450 mm* d) 500 mm

Last Answer : c) 450 mm*

Description : What is the threshold for water indicating scarcity in cubic meters per capita per annum as per UNDP? [a] 500 [b] 1000 [c] 1500 [d] 1200 [e] None of the above

Last Answer : [b] 1000

Description : Minimum excretory urinary volume for waste products elimination during 24 hrs is (A) 200–300 ml (B) 200–400 ml (C) 500–600 ml (D) 800 ml

Last Answer : Answer : C

Description : Water requirement in Maize (a) 400-500mm (b) 600- 800 mm (c) 500- 800 mm (d) 600- 700 mm

Last Answer : (c) 500- 800 mm

Description : Number of meiotic divisions required to produce 200/400 seeds of pea would be (a) 200/400 (b) 400/800 (c) 300/600 (d) 250/500

Last Answer : (d) 250/500.

Description : Height of Low level platform for passengers for BG is --- high (a) 0.455 m* (b) 0.560 m (c) 0.650 m (d) 0.760 m

Last Answer : (a) 0.455 m*

Description : Height of high level platform for passengers for BG is --- high (a) 0.455 m (b) 0.560 m (c) 0.650 m (d) 0.760 m*

Last Answer : (d) 0.760 m*

Description : The minimum and maximum clearances of check rails at all BG level crossings shall be a) 51 to 57 mm* b) 44 to 48 mm c) 41 to 45 mm d) 55 to 70 mm

Last Answer : a) 51 to 57 mm*

Description : What is maximum height above rail level for low-level passenger platform for BG? (a) 300mm (b) 455mm* (c) 525mm (d) 550mm

Last Answer : (b) 455mm

Description : The recommended maximum gradient in the year for B.G is- (a) 1 in 1000 (b) 1 in 1200* ( c) 1 in 1500 (d) 1 in 1800

Last Answer : (b) 1 in 1200*

Description : Minimum length of check rail for square crossing shall be -------- more than the width of gate a) 1 meters b) 2 meters* c) 3 meters d) 5 meters

Last Answer : b) 2 meters*

Description : Stop boards on either side of approaches of all unmanned level crossings shall be provided at -------------from the centre line of nearest track. a) 3meters b) 5 meters* c) 6 meters d) 10 meters

Last Answer : b) 5 meters*

Description : Service life of CMS crossing ( 52 Kg rail) is:- (a) 400 GMT. (b) 300 GMT. (c) 200 GMT. (d) 150 GMT.*

Last Answer : (d) 150 GMT.*

Description : A father runs after his son, who is 1000 meters ahead. The father runs at a speed of 1 kilometre every 8 minutes, and the son runs at a speed of 1 kilometer every 12 minutes. How much distance has ... father overtakes him? a) 2500 meters b) 2000 meters c) 1500 meters d) 1000 meters e) 1200 meters

Last Answer : Time taken is same for both father and son Let x be the distance son travelled before being overtaken by his father Time taken by son = x/5 km/hour Time taken by father = (1000 + x) / 7.5 km/hr Since, time taken is same x/5 = (1000 + x) / 7.5 or x = 2000m Answer: b)