What is the clear distance between two consecutive bridge Timbers or Girder bridge?  (a) 450 mm
 (b) 510 mm*
 (c) 500 mm
 (d) 520 mm

1 Answer

Answer :

(b) 510 mm*

Related questions

Description : What is the clear distance between two consecutive steel channel sleepers on Girder bridges? (a) 450 mm* (b) 510 mm (c) 500 mm (d) 460 mm

Last Answer : (a) 450 mm*

Description : Clear distance between consecutive sleepers not to exceed on bridges in BG is a) 450 mm* b) 600 mm c) 510 mm d) 500 mm

Last Answer : a) 450 mm*

Description : n Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 12.20 < 30.5 m a) 300 mm b) 600 mm* c) 500 mm d) 450 mm

Last Answer : b) 600 mm*

Description : In Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 6.10 < 12.2 m a) 300 mm b) 600 mm c) 450 mm* d) 500 mm

Last Answer : c) 450 mm*

Description : The clear distance between consecutive sleepers laid over unballasted bridge on BG should not exceed a)300mm b)400mm c)450mm* d)550mm

Last Answer : c)450mm*

Description : In cement pressure grouting holes should be drilled at spacing in both direction at a) 150 – 500 mm b) 450 mm c) 500 – 750 mm* d) 1000 mm

Last Answer : c) 500 – 750 mm*

Description : A bridge having super structure with “Single or duplicate girders with cross sleepers on top flanges” is classified as a) RSJ girder bridge b) Cross Girder c) Deck plate girder* d) Open web girder

Last Answer : c) Deck plate girder*

Description : Length of bridge timber in BG a) outer to outer of girder plus 305mm b) 2440mm c) whichever is more in a) & b)* d) whichever is less in a) & b)

Last Answer : c) whichever is more in a) & b)*

Description : When as small area of girder bridge should be painted when requiring immediate painting; known as a) patch painting* b) periodical through painting c) Any of the above d) None of the above

Last Answer : a) patch painting*

Description : Entire steel work of girder bridge should be painted at regular interval; known as a) patch painting b) periodical through painting* c) Any of the above d) None of the above

Last Answer : b) periodical through painting*

Description : Super structure of a bridge includes a) Girder/Slab* b) Abutment c) Piers d) Bed block

Last Answer : a) Girder/Slab*

Description : Sub structure of a bridge does not include a) Abutment b) Girder/Slab* c) Piers d) Wing and Return walls

Last Answer : b) Girder/Slab*

Description : Depth of construction in a girder bridge means the depth from a) RL to HFL b) RL to top of bed block * c) RL to bottom of bed block d) RL to Bed level

Last Answer : b) RL to top of bed block *

Description : Maximum vertical clearance (VC) for a slab/ girder bridges with discharge above 3000 cumecs is a) 300 mm b) 1500 mm c) 1800 mm* d) 600 mm

Last Answer : c) 1800 mm*

Description : Minimum vertical clearance (VC) for a slab/ girder bridges with discharge of 0-30 cumecs is a) 300 mm b) 1500 mm c) 1800 mm d) 600 mm*

Last Answer : d) 600 mm*

Description : In a single span bridge, the clear span is the distance between a) Centres of Abutments b) Inner faces of Abutments* c) Outer faces of Abutments d) Width of Abutment

Last Answer : b) Inner faces of Abutments*

Description : A boat takes 38 hrs for travelling downstream from point p to point q and coming back to a point r midway between p and q. If the velocity of the stream is 8 km/hr and the speed of the boat in still water is 28 km/hr. What is the distance between p and q? A) 720 B) 640 C) 510 D) 450

Last Answer : ANSWER: A Explanation: Speed downstream = (28 + 8)km/hr = 36 km/hr Speed upstream = (28 – 8)km/hr = 20 km/hr Let the distance between p and q be ‘x’km Then, x/36 + (x/2)/20 = 38 x/36 +x/40 = 38 19x = 13680 X = 720 km Therefore the distance between p and q is 720km

Description : Number of bricks required for 1 cubic meter of brick masonry is a)400 b) 450 c) 500* d) 550

Last Answer : c) 500*

Description : A bridge is generally specified as “Br. No. 180 (5x9.10m G) at km 345/5-6”. a) Effective Span b) Width of bridge c) Clear Span* d) Overall length of bridge

Last Answer : c) Clear Span*

Description : The embankment width in approach of the bridge shall be a) 5870 mm b) 6525 mm c) 6850 mm* d) 6000 mm

Last Answer : c) 6850 mm*

Description : The minimum vertical clearance of foot over bridge gangway is a) 2100 mm b) 3660 mm c) 6525 mm d) 2710 mm

Last Answer : d) 2710 mm

Description : The vertical clearance of bottom most foot over bridge structure above rail level is a) 6525 mm* b) 3660 mm c) 5330 mm d) 6250 mm

Last Answer : a) 6525 mm*

Description : The horizontal clearance of edge of foot over bridge structure from face of platform is a) 6525 mm b) 3660 mm* c) 5330 mm d) 5300 mm

Last Answer : b) 3660 mm*

Description : Minimum Free Board required in a bridge is a) 1 m* b) 1.20 m c) 600 mm d) 300 mm

Last Answer : a) 1 m*

Description : An important bridge is one which has total waterway of equal to or more than a) 1000 sq.metres.* b) 800 sq. metres c) 500 sq. metres d) 300 sq. metres

Last Answer : a) 1000 sq.metres.*

Description : Greasing of bearings of Steel girder bridges is done once in years.

Last Answer : Three

Description : Metallising is the process of spraying of …. on the surface prepared girder.

Last Answer : Zinc.. or ..Aluminium.

Description : Piano wire is used for measuring the a) Distortion b)Camber in PSC girder c)Both a & b* d)None of above

Last Answer : c)Both a & b*

Description : The depth of 19.81 mlong service girder is about……… a)1.67 m b)1.16 m* c)0.95 m d)1.52 m

Last Answer : b)1.16 m*

Description : Shallow type girder can be used in a) ROBs b) RUBs* c) FOBs

Last Answer : b) RUBs*

Description : Flood level gauge to be marked a) commencing from bed level to top b) commencing from bottom of girder towards bed level* c) commencing from Rail level d) commencing from Danger level

Last Answer : b) commencing from bottom of girder towards bed level*

Description : Corrosion in Steel girder bridges may be prevented by : a) Protective coatings by painting b) Metallising c) Use of epoxy based paints d) All the above*

Last Answer : d) All the above*

Description : Renewal of slack rivets should be taken up in steel girder bridges: a) All rivets which are hand loose or which have lost 50% of their head by corrosion. b) All hammer loose rivets where corrosion has set ... . c) In end stiffeners when the percentage of hammer loose rivets is >30% d) All the above*

Last Answer : d) All the above*

Description : Temporary arrangements for rebuilding of Railway bridges can be executed by providing a) Temporary girder b) Temporary diversion c) Any of the above* d) None of the above

Last Answer : c) Any of the above*

Description : Steel channel sleepers are provided in bridges with superstructure of a) PSC slab b) PSC girder c) Steel girder* d) RCC Box

Last Answer : c) Steel girder*

Description : Temporary staging for casting PSC Box Girder for a ROB over the Railway span shall be removed a) after hardening of concrete b) before hardening of concrete c) during concreting d) after stressing the cables

Last Answer : d) after stressing the cables

Description : The load transferred from rails to web of girders is in a) deck type girder b) through type girder c) semi-through type girder* d) plate girder

Last Answer : c) semi-through type girder*

Description : The load transferred from rails to bottom flanges is in a) deck type girder b) through type girder* c) semi-through type girder d) plate girder

Last Answer : b) through type girder*

Description : In shallow type girders, the rail level shall be a) 25mm above the top flange of girder* b) near the bottom of the girder c) near the middle of the girder d) below the girder

Last Answer : a) 25mm above the top flange of girder*

Description : Camber in steel triangulated girder is provided to compensate for deflection a) Under live load and dead load* b) Under live load c) Under dead load d) None of the above

Last Answer : a) Under live load and dead load*

Description : The date of painting of steel work should be painted in white on the out side of the left girder a) of the 1st span only b) first span only but on all spans for Imp. Bridges* c) of the all spans d) None of the above

Last Answer : b) first span only but on all spans for Imp. Bridges*

Description : Initial inspection for PSC girders / Welded girder bridges as per IRBM 1998 a) Within one year of installation* b) Once in 3 years d) Once in 2 years d) Once in 5 years

Last Answer : a) Within one year of installation*

Description : Free board given in septic tank is about (a) 100 mm (b) 200 mm (c) 300 mm* (d) 500 mm

Last Answer : (c) 300 mm*

Description : In cement pressure grouting G.I pipes of diameter …… and ……length, should be fixed in drilled holes a) 12 to 20 mm, 200 mm* b) 12 to 20 mm, 300 mm c) 12 to 25 mm, 500 mm d) 20 to 25 mm, 300 mm

Last Answer : a) 12 to 20 mm, 200 mm*

Description : The thickness of web for unstiffened plate girder with clear distance‘d’ between the flanges shall be not less than

Last Answer : d/85

Description : Clear perpendicular distance between inner faces of two rails is a. Gauge of track* b. Inner gauge c. Wheel base d. Wheel gauge

Last Answer : a. Gauge of track*

Description : The minimum centre to centre distance of a B.G. track in mid-section is ……….. mm (a) 4200 (b) 4265* (C) 4350 (d) 4000

Last Answer : (b) 4265*

Description : What is the minimum distance centre to centre of straight tracks for new works/alterations to existing works. a. 4265 mm. b.3660 mm. c.5300 mm.* d 4365 mm.

Last Answer : c.5300 mm.*

Description : What is the standard distance between lines in Broad Gauge a. 1670 mm b. 1676 mm* c. 1665 mm d. 1680 mm

Last Answer : b. 1676 mm*

Description : On Broad gauge tracks whistle indicator shall be provided at a distance of ---------- from level crossing along the track a) 400 meters b) 600 meters* c) 350 meters d) 500 meters