For Box Culverts Danger level is to be taken as
a) at the top of slab
b)one third height below bottom of slab
c) at the bottom of slab*
d) None of the above

1 Answer

Answer :

c) at the bottom of slab*

Related questions

Description : n Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 12.20 < 30.5 m a) 300 mm b) 600 mm* c) 500 mm d) 450 mm

Last Answer : b) 600 mm*

Description : In Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 6.10 < 12.2 m a) 300 mm b) 600 mm c) 450 mm* d) 500 mm

Last Answer : c) 450 mm*

Description : Flood level gauge to be marked a) commencing from bed level to top b) commencing from bottom of girder towards bed level* c) commencing from Rail level d) commencing from Danger level

Last Answer : b) commencing from bottom of girder towards bed level*

Description : In shallow type girders, the rail level shall be a) 25mm above the top flange of girder* b) near the bottom of the girder c) near the middle of the girder d) below the girder

Last Answer : a) 25mm above the top flange of girder*

Description : The toe projection of foundation slabs is taken (A) As one third of the base (B) As one sixth of overall height of the wall (C) Equal to heel slab (D) Below ground surface

Last Answer : Answer: Option A

Description : Steel channel sleepers are provided in bridges with superstructure of a) PSC slab b) PSC girder c) Steel girder* d) RCC Box

Last Answer : c) Steel girder*

Description : Which one of the following statements regarding septic tanks is wrong? A. A gap of 7.5 cm between the bottom of the covering slab and the top level of scum is provided B. The outlet invert level is kept ... . The minimum width of septic level is 90 cm D. The depth of tank is kept equal to its width

Last Answer : ANS: D

Description : Marking on weld should be done (i) On centre of the rail head (ii) 10 mm below the top surface of rail head.* (iii) 10 mm above the bottom surface of rail head. (iv) None of the above

Last Answer : ii) 10 mm below the top surface of rail head.*

Description : The bottom of side drains should be below the formation level by at least------------ a) 45 cm b )30 cm* c) 15 cm d) 60 cm

Last Answer : b )30 cm*

Description : Depth of construction in a girder bridge means the depth from a) RL to HFL b) RL to top of bed block * c) RL to bottom of bed block d) RL to Bed level

Last Answer : b) RL to top of bed block *

Description : The danger level should be marked with a bright red band …… wide centrally over a white band …… wide for a length of……… a) 5 cm, 10 cm, 60 cms* b) 10 cm, 20 cm, 60 cm c) 15 cm, 30 mm, 60 cm d) None of the above

Last Answer : a) 5 cm, 10 cm, 60 cms*

Description : In case of water crossing danger level in bridges a) speed restriction be imposed b) traffic be suspended till water recedes c) traffic be suspended till a responsible person inspects the site and declares it safe for running traffic* d) bridge watchman is to be posted

Last Answer : c) traffic be suspended till a responsible person inspects the site and declares it safe for running traffic*

Description : Free Board is the level difference between Formation Level and ……………. a) Rail Level b) HFL* c) Bed Level d) Danger Level

Last Answer : b) HFL*

Description : Maximum height of low level cistern from top of W.C. pan should be (a) 65 cm. (b) 30 cm. (c) 8 (d) 120 cm. (e) 80 cm.

Last Answer : b) 30 cm. (c) 8

Description : While taking sample of water from well, sample is collected a)About 2 metre above the bottom of wel b) About 1 metre above the bottom of well * c)About 1 metres below the bottom of well d) none of the above

Last Answer : b) About 1 metre above the bottom of well *

Description : Minimum depth of ballast cushion below the bottom of sleeper at the rail seat on BG group A route should be :- (a) 350 mm. (b) 250 mm. (c) 300 mm.* (d) 325 mm.

Last Answer : (c) 300 mm.*

Description : The Frog of a brick is normally made on its a) Top face* b) Bottom face c) Longer face d) Shorter side

Last Answer : a) Top face*

Description : The vertical clearance of bottom most foot over bridge structure above rail level is a) 6525 mm* b) 3660 mm c) 5330 mm d) 6250 mm

Last Answer : a) 6525 mm*

Description : Vertical Clearance (VC) in water way bridges is the level difference between a) HFL and Formation level b) Bed level and bottom of superstructure c) HFL and bottom of superstructure* d) Rail level and Formation level

Last Answer : c) HFL and bottom of superstructure*

Description : Maximum vertical clearance (VC) for a slab/ girder bridges with discharge above 3000 cumecs is a) 300 mm b) 1500 mm c) 1800 mm* d) 600 mm

Last Answer : c) 1800 mm*

Description : Minimum vertical clearance (VC) for a slab/ girder bridges with discharge of 0-30 cumecs is a) 300 mm b) 1500 mm c) 1800 mm d) 600 mm*

Last Answer : d) 600 mm*

Description : Super structure of a bridge includes a) Girder/Slab* b) Abutment c) Piers d) Bed block

Last Answer : a) Girder/Slab*

Description : Sub structure of a bridge does not include a) Abutment b) Girder/Slab* c) Piers d) Wing and Return walls

Last Answer : b) Girder/Slab*

Description : Torch is kept at height from top surface of rail head? (i) 30 to 55 mm (ii) 35 to 40 mm (iii) 40 to 45 mm

Last Answer : (iii) 40 to 45 mm

Description : Height of crucible is kept from top surface of mould? (i) 30 mm (ii) 40 mm (iii) 50 mm* (iv) 60 mm

Last Answer : (iii) 50 mm*

Description : The thickness of base slab of a retaining wall generally provided, is (A) One half of the width of the stem at the bottom (B) One-third of the width of the stem at the bottom (C) One fourth of the width of the steam at the bottom (D) Width of the stem at the bottom

Last Answer : Answer: Option D

Description : In a precision planter the height of seed drop: A. Should be as close to be ground level as is possible. B. Should be at least 1 m from the ground level. C. Is not a factor to be considered? D. None of These

Last Answer : A. Should be as close to be ground level as is possible.

Description : Height of Low level platform for passengers for BG is --- high (a) 0.455 m* (b) 0.560 m (c) 0.650 m (d) 0.760 m

Last Answer : (a) 0.455 m*

Description : Height of high level platform for passengers for BG is --- high (a) 0.455 m (b) 0.560 m (c) 0.650 m (d) 0.760 m*

Last Answer : (d) 0.760 m*

Description : Height of platform of a flag station in cutting above rail level is (a) Same height as Rail level (b) 305 mm above rail level (c) 455 mm above rail level (d) 840mm above rail level*

Last Answer : (d) 840mm above rail level*

Description : The Height Gauge for a level crossing should be located at least --------- from the gate post a) 3 meters b) 5 meters c) 8 meters* d) 10 meters

Last Answer : c) 8 meters*

Description : The maximum height above rail level for B.G. goods platform is ……. Mm (a) 1000mm (b) 1050mm (c) 1065mm* (d) 1075mm

Last Answer : (c) 1065mm*

Description : What is maximum height above rail level for low-level passenger platform for BG? (a) 300mm (b) 455mm* (c) 525mm (d) 550mm

Last Answer : (b) 455mm

Description : Maximum height above rail level of high passenger Platform a. 860 mm b. 900 mm c. 840 mm&* d. 875 mm

Last Answer : c. 840 mm&*

Description : The neutral axis of a T-beam exists (A) Within the flange (B) At the bottom edge of the slab (C) Below the slab (D) All the above

Last Answer : Answer: Option D

Description : Dumpy level is most suitable when (a) The instrument is to be shifted frequently (b) Fly leveling is being done over long distance (c) Many readings are to be taken from a single setting of the instrument* (d) All of the above

Last Answer : (c) Many readings are to be taken from a single setting of the instrument*

Description : bridge foundation having less then 2M depth below bed level in case of arch bridges and 1.2M depth below bed level in case of other bridges is termed as

Last Answer : …Shallow foundation..

Description : Pick up the incorrect statement from the following: (A) In the stem of a retaining wall, reinforcement is provided near the earth side (B) In the toe slab of a retaining wall, reinforcement is ... slab of a retaining wall, reinforcement is provided at the top of the slab (D) None of these

Last Answer : Answer: Option D

Description : In cement concrete pavements, tensile stress is due to: (A) Bending or deflection under wheel loads (B) Difference in temperature of the top and bottom of pavement (C) Contraction of slab during falling temperature (D) All the above

Last Answer : Answer: Option D

Description : The reinforcement in a continuous slab is provided (a) At the top of the slab portion over the intermediate supports. (b) At the bottom of the slab portion over the intermediate supports. (c) All the middle of the slab portion over the intermediate supports (d) All the above

Last Answer : (a) At the top of the slab portion over the intermediate supports.

Description : Knowledge of hydrology is necessary for civil engineers for (A) Designing and construction of irrigation structures (B) Designing and construction of bridges and culverts (C) Flood control works (D) All the above

Last Answer : Answer: Option D

Description : List the types of culverts

Last Answer : Types of culverts: 1. Arch culvert 2. Box culvert 3. Slab culvert 4. Pipe culvert

Description : At FOBs in electrified section the electrocution by live OHE wires is prevented by providing a) smoke gaurds b) Roofing c) Bottom lateral bracings d) protective screens*

Last Answer : d) protective screens*

Description : The minimum vertical clearance above R.L. to bottom of ROB near the yard shall be a) 6525 mm* b) 5870 mm c) 2360 mm d) 6250 mm

Last Answer : a) 6525 mm*

Description : The load transferred from rails to bottom flanges is in a) deck type girder b) through type girder* c) semi-through type girder d) plate girder

Last Answer : b) through type girder*

Description : Ignition rod can be ignited from ? (i) Match box (ii) Ignition match* (iii) From fire (iv) None of the above

Last Answer : (ii) Ignition match

Description : .Minimum earth cushion required over RCC Box is a) 300 mm b) 600 mm c) 0* d) 1000 mm

Last Answer : c) 0*

Description : Temporary staging for casting PSC Box Girder for a ROB over the Railway span shall be removed a) after hardening of concrete b) before hardening of concrete c) during concreting d) after stressing the cables

Last Answer : d) after stressing the cables

Description : Draw a sketch and explain how to find height of chajja or slab using dumpy level.

Last Answer : Explanation : 1. First the back sight reading is taken on floor level whose RL is known to us; from which RL of instrument axis can be find out by adding RL of BM and BS reading. 2. Now ... staff reading. 4. Finally height of chajja is calculated as RL of slab bottom -  RL of floor top.

Description : In order to do fly levelling the following type of methodology is adopted (a) Rise & fall method (b) Height of instrument method (c) Both the above* (d) None of the above

Last Answer : c) Both the above*