Under slung girders can be used in
a) Plain section
b) Ghat section*
c) Aquaduct
d) Viaduct

1 Answer

Answer :

b) Ghat section*

Related questions

Description : A bridge having super structure with “Single or duplicate girders with cross sleepers on top flanges” is classified as a) RSJ girder bridge b) Cross Girder c) Deck plate girder* d) Open web girder

Last Answer : c) Deck plate girder*

Description : At locations where access to the new bridge construction is available by rail, the launching of girders upto 18.3 m which method is ideal. a) slew in slew out method b) gantry method c) Launching of girders with the help of a BFR*: d) Pantoon method

Last Answer : c) Launching of girders with the help of a

Description : riodicity of recording of camber in PSC girders a) Once in a year* b) Once in two years c) Once in three years d) During the detailed inspection of SE/Br.

Last Answer : a) Once in a year*

Description : n Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 12.20 < 30.5 m a) 300 mm b) 600 mm* c) 500 mm d) 450 mm

Last Answer : b) 600 mm*

Description : In Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 6.10 < 12.2 m a) 300 mm b) 600 mm c) 450 mm* d) 500 mm

Last Answer : c) 450 mm*

Description : For railway bridges with spans in excess of 30.5m, generally provided with a) deck type girders b) open web through girders* c) semi through girders d) shallow type girders

Last Answer : b) open web through girders*

Description : Bearings for plate girders are -- a) roller bearing b) sliding bearings c) centralised articulated bearings* d) None of the above

Last Answer : c) centralised articulated bearings*

Description : The load transferred from rails to web of girders is in a) deck type girder b) through type girder c) semi-through type girder* d) plate girder

Last Answer : c) semi-through type girder*

Description : In shallow type girders, the rail level shall be a) 25mm above the top flange of girder* b) near the bottom of the girder c) near the middle of the girder d) below the girder

Last Answer : a) 25mm above the top flange of girder*

Description : Periodical inspection of PSC & Composite girders a) Once in 3 years b) Once in 5 years * c) Once in 2 years d) Once in 5 years

Last Answer : b) Once in 5 years *

Description : Periodical inspection of Welded girders a) Once in 3 years b) Once in 3 years* c) Once in 2 years d) Once in 5 years

Last Answer : b) Once in 3 years*

Description : Initial inspection for PSC girders / Welded girder bridges as per IRBM 1998 a) Within one year of installation* b) Once in 3 years d) Once in 2 years d) Once in 5 years

Last Answer : a) Within one year of installation*

Description : The commonly used lime in white washing is a) Hydraulic lime b) Slaked lime c) Plain lime d) White lime*

Last Answer : d) White lime*

Description : Would building a kind of national aquaduct be practical?

Last Answer : answer:Great question. I was thinking about the same thing when the wildfires and the dustbowl conditions and crop losses hit. I mean, we can borrow money right now at near zero interest. With the financial ... that is stopping us. They knew how to do this stuff 2,200 years ago in ancient Rome.

Description : Padma The bridge Viaduct How much? Kilometers ?

Last Answer : 3 . 16 Kilometers.

Description : Padma The bridge Viaduct Pillar How many ?

Last Answer : Total 61 Viaduct Pillar.

Description : Number of Elastic clips used for one K to BG single line section having 13 length & concrete sleepers of M+7 sleeper density are (a) 5280 (b) 6160* (c) 6250 (d) 6500

Last Answer : (b) 6160*

Description : The number of standard rails (13 m) for one km. BG section single line section is (a) 120 (b) 154* (c) 168 (d) 196

Last Answer : (b) 154*

Description : The centre to centre spacing formation width for double line section is (a) 4725 mm (b) 5025 (c) 5330* (d) 5500

Last Answer : c) 5330*

Description : Formation width for bank for M.G. double line section is (a) 8.50 m (b) 8.84 m (c) 9.65 m (d) 9.81 m*

Last Answer : (d) 9.81 m*

Description : Formation width for bank for B.G. double line section is (a) 10.82 m (b) 11.0 m (c) 11.58 m (d) 12.155 m*

Last Answer : (d) 12.155 m*

Description : Formation width for cuttings for B.G. single line section is (a) 5.40 m (b) 6.20 m (c) 6.25 m* (d) 6.50 m

Last Answer : (c) 6.25 m*

Description : Formation width for banks for B.G. single line section is (a) 6.10 m (b) 6.50 m (c) 6.85 m* (d) 7.0 m

Last Answer : (c) 6.85 m*

Description : In case of emergency, land can be acquired urgently by operation of special section (a) Section 4 & 6 (b) Section 9 & 17* (c) Section 8 & 10 (d) None of them

Last Answer : (b) Section 9 & 17*

Description : For rolling mark 60 kg/Sail/X/2010 the first testing in the field after initial testing of rails in rail manufacturing plant, will be done. (i) After test free period of 25%. (ii) After passage of every 40 ... period.* (iii) After passage of 200 GMT. (iv) On the basis of annual GMT of the section.

Last Answer : (ii) After passage of every 40 GMT traffic during test free period.*

Description : On Rajdhani routes testing frequency of rail testing for rail section of 60kg with annual GMT 80, will be. (i) 4 months (ii) 1 1⁄2 months (iii) 1 months* (iv) None of above.

Last Answer : (iii) 1 months*

Description : Addition gain of 10 db is used for testing. (i) ‘D’ marked rails on single lines. (ii) ‘D’ marked rails on double lines. (iii) Testing on single line and ‘D’ marked rails on double/multiple lines section.* (iv) None of above.

Last Answer : (iii) Testing on single line and ‘D’ marked rails on double/multiple lines section.*

Description : Cross slope of the formation to have good drainage of Ballast section is a) 1 in 40* b) 1 in 50 c) 1 in 30 d) 1 in 20

Last Answer : a) 1 in 40*

Description : In case of a curved track on electrified, double line, BG section a) Duty hut cannot be provided for a level crossing. b) Duty hut should be on the inside of the curve. c) Duty hut should be on the outside of the curve.* d) Duty hut can be provided on any side of the curve.

Last Answer : c) Duty hut should be on the outside of the curve.*

Description : If the SSE/SE/JE/ Br. working in the section is not readily available, another SSE/SE/JE may be authorised by …………….. to witness payment on the section. a) DEN b) SSE/SE/JE/ c) AEN (Bridges)* d) Office clerk

Last Answer : c) AEN (Bridges)

Description : Payment to bridge staff on the section will be made by the pay clerk in the presence of a) SSE/SE/JE/ P.Way b) SSE/SE/JE/ Br.* c) SSE/SE/JE/ Works d) Office clerk

Last Answer : b) SSE/SE/JE/ Br.*

Description : In case of LWR track, full ballast section as specified in LWR Manual should be provided up to ……….. from the bridge abutment. a) 200 m b) 50 m c) 300 m d) 100 m*

Last Answer : d) 100 m

Description : At FOBs in electrified section the electrocution by live OHE wires is prevented by providing a) smoke gaurds b) Roofing c) Bottom lateral bracings d) protective screens*

Last Answer : d) protective screens*

Description : In a temporary signaling arrangements for a bridge work in BG section, speed board shall be placed in advance of 30 m from the a) C.L. of the bridge b) Termination Board c) Start of the bridge/work spot* d) Caution Board

Last Answer : c) Start of the bridge/work spot*

Description : .In a temporary signaling arrangements for a bridge work in BG section, caution board shall be placed in advance of ……. m from start of the bridge/ work spot. a) 30 m b) 1200 m* c) 677 m d) 1000 m

Last Answer : b) 1200 m*

Description : The minimum centre to centre distance of a B.G. track in mid-section is ……….. mm (a) 4200 (b) 4265* (C) 4350 (d) 4000

Last Answer : (b) 4265*

Description : Minimum rail section recommended for section having traffic more than 20 GMT is (a) 90 UTS (b) 52 Kg. (c) 60 Kg.* (d) None of the above.

Last Answer : (c) 60 Kg.

Description : What is the difference between rail flange of 60 kg & 52 rail section a. 20 mm b. 18 mm c. 14 mm* d. 16 mm

Last Answer : c. 14 mm

Description : What is the width of Head of 52 kg Rail section a. 70 mm b. 75 mm c. 67 mm* d. 60 mm

Last Answer : c. 67 mm*

Description : What is the height of 60 kg rail section? a. 180 mm b. 172 mm* c. 185 mm d. 165 mm

Last Answer : b. 172 mm*

Description : The ruling gradient is 1 in 200 on a section of the BG track. If the track is laid in that place at a curve of 5 degrees then the allowable ruling gradient on the curve will be a) 1 in 16.7 b) 1 and 400 c) 1 in 240 d) 1 in 333*

Last Answer : d) 1 in 333*

Description : The temporary girders are generally required for the bridge works a) on traffic condition* b) under mega block c) in cut and open method d) in new route

Last Answer : a) on traffic condition*

Description : What are the main characters of Jasimuddin's poem 'Sojan Badiyar Ghat' ?

Last Answer : Sojan and Duli are the main characters in Jasimuddin's poem 'Sojan Badiyar Ghat' .

Description : Who wrote Kanakari of Sat Ghat ?

Last Answer : Written by Mamtajuddin Ahmed.

Description : What is the feminine form of the word ghat ?

Last Answer : The feminine form of the word ghat is - ghati.

Description : What is Ghat ?

Last Answer : A sum with an indicator or base is called an index / exponent.

Last Answer : Very A little Of time Too much Large Quality That Tell me No Of the object On Applied Is Him Powers Tell me Says.