riodicity of recording of camber in PSC girders a) Once in a year*
b) Once in two years
c) Once in three years
d) During the detailed inspection of SE/Br.

1 Answer

Answer :

a) Once in a year*

Related questions

Description : Periodicity of Under water inspection a) Once in a year b) Once in two years* c) Whenever high flood occurs d) Along with detailed inspection of SE/Br

Last Answer : b) Once in two years*

Description : Initial inspection for PSC girders / Welded girder bridges as per IRBM 1998 a) Within one year of installation* b) Once in 3 years d) Once in 2 years d) Once in 5 years

Last Answer : a) Within one year of installation*

Description : Periodical inspection of PSC & Composite girders a) Once in 3 years b) Once in 5 years * c) Once in 2 years d) Once in 5 years

Last Answer : b) Once in 5 years *

Description : Periodical inspection of Welded girders a) Once in 3 years b) Once in 3 years* c) Once in 2 years d) Once in 5 years

Last Answer : b) Once in 3 years*

Description : Piano wire is used for measuring the a) Distortion b)Camber in PSC girder c)Both a & b* d)None of above

Last Answer : c)Both a & b*

Description : If the SSE/SE/JE/ Br. working in the section is not readily available, another SSE/SE/JE may be authorised by …………….. to witness payment on the section. a) DEN b) SSE/SE/JE/ c) AEN (Bridges)* d) Office clerk

Last Answer : c) AEN (Bridges)

Description : Payment to bridge staff on the section will be made by the pay clerk in the presence of a) SSE/SE/JE/ P.Way b) SSE/SE/JE/ Br.* c) SSE/SE/JE/ Works d) Office clerk

Last Answer : b) SSE/SE/JE/ Br.*

Description : Conventional method of camber recording a) Piano wire with counter weight* b) By using leveling instrument c) Offset method d) None of the above

Last Answer : a) Piano wire with counter weight*

Description : Foundation and substructure of the bridge should be inspected by SE/P.Way/Works a) Once a year any time b) Once a year before monsoon* c) Once a year after monsoon d) Once in 3 month

Last Answer : b) Once a year before monsoon*

Description : Special inspection of distressed bridges Group II shall be carried out by Inspector (Concerned) is a) Once in three months* b) Once in two months c) Once in a month d) Once in six months

Last Answer : a) Once in three months*

Description : Special inspection of distressed bridges shall be carried out by Asst. Engineer is a) Once in three months b) Once in two months* c) Once in a month d) Once in six months

Last Answer : b) Once in two months*

Description : Curve inspection shall be carried out by Sectional PWI a. Once in three months b. Once in six months c. Once in four months* d. None of above

Last Answer : c. Once in four months

Description : Frequency of TTM tamping on PSC sleepers track a. 2 years or 100 GMT which ever is earlier* b. 2 years or 150 GMT which ever is earlier c. 1.5 years or 200 GMT which ever is earlier d. 2 years or 175 GMT which ever is earlier

Last Answer : a. 2 years or 100 GMT which ever is earlier*

Description : Temporary staging for casting PSC Box Girder for a ROB over the Railway span shall be removed a) after hardening of concrete b) before hardening of concrete c) during concreting d) after stressing the cables

Last Answer : d) after stressing the cables

Description : A bridge having super structure with “Single or duplicate girders with cross sleepers on top flanges” is classified as a) RSJ girder bridge b) Cross Girder c) Deck plate girder* d) Open web girder

Last Answer : c) Deck plate girder*

Description : At locations where access to the new bridge construction is available by rail, the launching of girders upto 18.3 m which method is ideal. a) slew in slew out method b) gantry method c) Launching of girders with the help of a BFR*: d) Pantoon method

Last Answer : c) Launching of girders with the help of a

Description : Under slung girders can be used in a) Plain section b) Ghat section* c) Aquaduct d) Viaduct

Last Answer : b) Ghat section*

Description : n Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 12.20 < 30.5 m a) 300 mm b) 600 mm* c) 500 mm d) 450 mm

Last Answer : b) 600 mm*

Description : In Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 6.10 < 12.2 m a) 300 mm b) 600 mm c) 450 mm* d) 500 mm

Last Answer : c) 450 mm*

Description : For railway bridges with spans in excess of 30.5m, generally provided with a) deck type girders b) open web through girders* c) semi through girders d) shallow type girders

Last Answer : b) open web through girders*

Description : Bearings for plate girders are -- a) roller bearing b) sliding bearings c) centralised articulated bearings* d) None of the above

Last Answer : c) centralised articulated bearings*

Description : The load transferred from rails to web of girders is in a) deck type girder b) through type girder c) semi-through type girder* d) plate girder

Last Answer : c) semi-through type girder*

Description : In shallow type girders, the rail level shall be a) 25mm above the top flange of girder* b) near the bottom of the girder c) near the middle of the girder d) below the girder

Last Answer : a) 25mm above the top flange of girder*

Description : PSC is the abbreviation of…

Last Answer : Prestressed Concrete

Description : Steel channel sleepers are provided in bridges with superstructure of a) PSC slab b) PSC girder c) Steel girder* d) RCC Box

Last Answer : c) Steel girder*

Description : Track structure for CC+8 t+ 2 t loaded trains is:- (a) 52 Kg 90 UTS;PSC 1540 sleepers/ Km.; 250 mm ballast. (b) 60 Kg 90 UTS;PSC 1660 sleepers/ Km.; 300 mm ballast.* (c) 52 Kg 72 UTS;PSC 1540 sleepers/ Km.; 300 mm ballast. (d) 90 R;PSC 1340 sleepers/ Km.; 250 mm ballast.

Last Answer : b) 60 Kg 90 UTS;PSC 1660 sleepers/ Km.; 300 mm ballast.*

Description : Camber in steel triangulated girder is provided to compensate for deflection a) Under live load and dead load* b) Under live load c) Under dead load d) None of the above

Last Answer : a) Under live load and dead load*

Description : A bridge is generally specified as “Br. No. 180 (5x9.10m G) at km 345/5-6”. a) Effective Span b) Width of bridge c) Clear Span* d) Overall length of bridge

Last Answer : c) Clear Span*

Description : Testing of welds by a) Dye penetrant test b) Magnetic particle inspection c) Radiographic inspection d) All the above*

Last Answer : d) All the above

Description : A detailed project report of the proposed railway line is made after (a) Preliminary survey (b) Reconnaissance survey (c) Final location survey* (d) Traffic survey

Last Answer : (c) Final location survey*

Description : Investigation for important bridges may be carried out in which stage a) Technical feasibility study (reconnaissance survey) b) Techno-economic feasibility study (preliminary engineering survey) c) Detailed survey and project report stage (final location survey) d) All the above *

Last Answer : d) All the above

Description : The frequency of census at a level crossing having TVU between 75000 to 1 lakh will be once a) In 2 years b) In 3 years* c) In 4 years d) Every year

Last Answer : b) In 3 years*

Description : Periodical Census of traffic at unmanned level Crossings should be done once in a) Once in 6 years b) Every year c) Once in 3 years* d) Once in 5 years

Last Answer : c) Once in 3 years*

Description : Deep screening of entire track must be done at least:- (a) Once in a quarter. (b) Once in a year. (c) Once in 5 years. (d) Once in 10 years.*

Last Answer : (d) Once in 10 years.*

Description : Greasing of bearings of Steel girder bridges is done once in years.

Last Answer : Three

Description : what is the value of long chord for measuring unevenness in track recording a. 3.6 meter b. 9.6 meter* c. 7.2 meter d. 4.8 mete

Last Answer : b. 9.6 meter*

Description : What is the formula of TGI for track recording a. UI+4TI+6GI+AI/10 b. 2UI+TI+GI+6AI/10* c. 3UI+TI+2GI+5AI/10 d. 2UI+2tI+2GI+4AI/10

Last Answer : b. 2UI+TI+GI+6AI/10*

Description : What is the frequency of track recording of the sections having speed more than 110 kmph to 130 kmph a. 4 Months b. 2 Months c. 6 Months d. 3 Months

Last Answer : d. 3 Months

Description : What is the full form of OMS used for track recording a. Outer most Surface b. Oscillation Monitoring system* c. Only measuring system d. Official measurement system

Last Answer : b. Oscillation Monitoring system*

Description : Lubrication of ERC and inserts in corrosion prone areas and platform line is done:- (a) Once in a month. (b) Once in a fortnight. (c) Once in a week. (d) Once in a year.*

Last Answer : (d) Once in a year.*

Description : Sensitivity calibration against temp. variation shall be carried out. (i) At least once in month* (ii) quarterly. (iii) at least once in six months (iv) Any of above.

Last Answer : i) At least once in month*

Description : The Assistant Divisional Engineer should inspect the equipment at every manned level crossing on the subdivision once in a) 2 months b) 3 months c) 4 months d) 6 months*

Last Answer : d) 6 months

Description : What is the validity after Refresher course for welders (TW-2)? (i) Six monyhs (ii) One year (iii) Two years.* (iv) All are wrong

Last Answer : (iii) Two years.*

Description : What is the life of portion? (i) 2 years (ii) No specific life.* (ii) 6 months (iv) 1 year

Last Answer : (ii) No specific life.*

Description : Frequency of overhauling for a level crossing with PRC sleepers shall be a) Every year c) Every 2 years* c) Every 3 years d) Every 5 years

Last Answer : c) Every 2 years*

Description : How many detonators are planted during protection of track for welding site ? (i) One (ii) Two (iii) Three* (iv) None of the above

Last Answer : iii) Three*

Description : Once project planning is complete, project managers document their plan in A. SPMP document B. SRS document C. Detailed Design document D. Excel Sheet

Last Answer : A. SPMP document

Description : Once the project is approved and moves into the planning stage, what happens  in the next phase of the project life cycle? Select one: a. Agreements for risk sharing need to be concluded. ... activities. e. A risk response plan can be used to identify increasing levels of detailed risk analysis

Last Answer : d. Risks are identified with each major group of activities.

Description : Once the project is approved and moves into the planning stage, what  happens in the next phase of the project life cycle? Select one: a. Agreements for risk sharing need to be concluded. ... activities. e. A risk response plan can be used to identify increasing levels of detailed risk analysis

Last Answer : d. Risks are identified with each major group of activities.