The capacity of automatic flushing cistern connected with three urinal shall be
(a) 05 litrs.
(b) 10 litrs.
(c) 12.5 litrs.*
(d) None of these

1 Answer

Answer :

(c) 12.5 litrs.*

Related questions

Description : The capacity of automatic flushing cistern connected with two urinal shall be (a) 10 litrs.* (b) 12.5 litrs. (c) 05 litrs. (d) None of these

Last Answer : (a) 10 litrs.*

Description : The capacity of automatic flushing cistern connected with one urinal shall be (a) 05 litrs. (b) 10 litrs. (c) 12.5 litrs. (d) None of these

Last Answer : (a) 05 litrs.

Description : The urinal basin shall be connected with (a) High level floating cistern* (b) Low level floating cistern (c) Automatic floating cistern (d) Any one of the above

Last Answer : (a) High level floating cistern*

Description : The capacity of high level flushing cistern is generally (a) 7.5 ltrs. (b) 10 ltrs.* (c) 12.5 ltrs. (d) None of these

Last Answer : b) 10 ltrs.*

Description : Maximum height of low level cistern from top of W.C. pan should be (a) 65 cm. (b) 30 cm. (c) 8 (d) 120 cm. (e) 80 cm.

Last Answer : b) 30 cm. (c) 8

Description : Fish plated joint shall be avoided in check raisl and on the running rails within--------- from the end of level crossing a) 3 meters* b) 5 meters c) 10 meters d) 12 meters

Last Answer : a) 3 meters*

Description : The maximum time lag between the primer coat and the Ist finishing coat shall not exceed a) 3 days b) 7 days* c) 4 days d) 12 days

Last Answer : b) 7 days*

Description : The maximum time lag between surface preparation and the application of primer coat shall not exceed a) 12 hours b) 24 hours* c) 48 hours d) 36 hours

Last Answer : b) 24 hours*

Description : The frequency of a wave travelling at a speed of 500 ms-1 is 25 Hz. Its time period will be ______. (i) 20 s (ii) 0.05 s (iii) 25 s (iv) 0.04 s

Last Answer : (iv) 0.04 s

Description : Indian type W.C. pan shall have 10cm. S.C.I. trap P or S type with effective seal of (a) 5 cm.* (b) 10 cm. (c) 7.5 cm (d) None of these

Last Answer : (a) 5 cm.*

Description : What is the validity after supervisors course (TW-3)? (i) Normally, supervisors shall not be required to undergo the course again. However, they may be sent for course on performance basis.* (ii) 2 years (iii) 5 Years (iv) 10 Years

Last Answer : (i) Normally, supervisors shall not be required to undergo the course again. However, they may be sent for course on performance basis.*

Description : Stop boards on either side of approaches of all unmanned level crossings shall be provided at -------------from the centre line of nearest track. a) 3meters b) 5 meters* c) 6 meters d) 10 meters

Last Answer : b) 5 meters*

Description : Special inspection of distressed bridges Group II shall be carried out by Inspector (Concerned) is a) Once in three months* b) Once in two months c) Once in a month d) Once in six months

Last Answer : a) Once in three months*

Description : Special inspection of distressed bridges shall be carried out by Asst. Engineer is a) Once in three months b) Once in two months* c) Once in a month d) Once in six months

Last Answer : b) Once in two months*

Description : Curve inspection shall be carried out by Sectional PWI a. Once in three months b. Once in six months c. Once in four months* d. None of above

Last Answer : c. Once in four months

Description : The increased gain of 10 dbs for single line & ‘D’ marks rails on double/multiple lines shall be employed for classification of defects. (i) defect in weld (ii) defects in rail. * (iii) for both defects on weld & rail. (iv) None of above.

Last Answer : ii) defects in rail. *

Description : Finished tolerance on 10 cm. long st. edge on surface of head shall be? (i) 0 to 0.1 mm (ii) 0 to 0.2 mm (iii) 0 to 0.4 mm* (iv) 0 to 0.3 mm

Last Answer : (iii) 0 to 0.4 mm*

Description : Finished tolerance on 10 cm long st. edge at the centre on gauge side shall be? (i) ± 0.4 mm (ii) ± 0.1 mm (iii) ± 0.2 mm (iv) ± 0.3 mm*

Last Answer : iv) ± 0.3 mm*

Description : The initial deposit for opening of savings account shall be accepted in cash wef a) 01.01.1990 b) 05.02.2000 d) 12.02.2005 d) None of these

Last Answer : a) 01.01.1990

Description : Pressure of Oxygen during pre-heating shall be? (i) 4.0 – 5.0 kg/ sq cm (ii) 5.0 – 6.0 kg/ sq cm (iii) 6.0 – 7.0 kg/ sq cm (iv) 7.0 – 8.0 kg/ sq cm *

Last Answer : (iv) 7.0 – 8.0 kg/ sq cm *

Description : ressure of LPG during pre-heating shall be? (i) 2.0 - 2.5 kg/ sq cm (ii) 2.0 - 2.5 kg/ sq cm (iii) 2.0 - 2.5 kg/ sq cm* (iv) 2.0 - 2.5 kg/ sq cm

Last Answer : (iii) 2.0 - 2.5 kg/ sq cm*

Description : Finished tolerance on 1 Mt. long st. edge on surface of head shall be? (i) 0 to .1 mm (ii) 1 to 1.5 mm (iii) 0 mm (iv) 0 to 1 mm*

Last Answer : (iv) 0 to 1 mm*

Description : Finished tolerance on 1 Mt. st. edge at the centre on gauge side shall be? (i) ± 0.2 mm (ii) ± 0.3 mm (iii) ± 0.5 mm* (iv) ± 1.0 mm

Last Answer : (iii) ± 0.5 mm*

Description : Frequency of overhauling for a level crossing with PRC sleepers shall be a) Every year c) Every 2 years* c) Every 3 years d) Every 5 years

Last Answer : c) Every 2 years*

Description : Minimum length of check rail for square crossing shall be -------- more than the width of gate a) 1 meters b) 2 meters* c) 3 meters d) 5 meters

Last Answer : b) 2 meters*

Description : Speed breaker of approved design shall be provided on either side of level crossing at ------ within Railway boundary a) 5 meters b) 15 meters c) 20 meters* d0 30 meters

Last Answer : c) 20 meters

Description : On Broad Gauge tracks Banner flag at a level crossing shall be provided at a distance of--- ---------- from ends of check rail before opening the gate for road traffic. a) 5 meters* b) 3 meters c) 6 meters d) 30 meters

Last Answer : a) 5 meters*

Description : The minimum pitch of rivets of diameter ‘d’ in steel plates shall be a) 2 x d b) 3 x d c) 1.75 x d d) 2.5 x d*

Last Answer : d) 2.5 x d*

Description : The minimum edge distance for rivets of diameter ‘d’ in steel plates shall be a) 2 x d b) 3 x d c) 1.5 x d* d) 2.5 x d

Last Answer : c) 1.5 x d*

Description : The diameter of hole for 20 dia rivet shall be a) 23 mm b) 18 mm c) 21.5 mm* d) 22 mm

Last Answer : c) 21.5 mm*

Description : The wash hand basin shall be fixed at a height of (a) 75-80 cm* (b) 75 cm (c) 80 cm (d) Not specified

Last Answer : (a) 75-80 cm*

Description : For high level flush the nominal dia of flush pipe shall be (a) 32 mm* (b) 40 mm (c) 25 mm (d) None of these

Last Answer : a) 32 mm*

Description : DFWR weld shall be replaced. (i) Within 2 months of detection. (ii) Within 1 year of detection. (iii) Within 3 months of detection.* (iv) after 3 days of detection.

Last Answer : (iii) Within 3 months of detection.*

Description : Sensitivity calibration against temp. variation shall be carried out. (i) At least once in month* (ii) quarterly. (iii) at least once in six months (iv) Any of above.

Last Answer : i) At least once in month*

Description : Rails used for A T Welding shall not normally be welded? (i) 20 years old . (ii) 30 years old (iii) 40 years old (iv) 50 years old*

Last Answer : iv) 50 years old*

Description : What is the speed restriction to be observed for train passing? (i) Necessary speed restriction shall be observed until the grinding operation is over.* (ii) 30KMPH (iii) 45 KMPH (iv) Not required

Last Answer : (i) Necessary speed restriction shall be observed until the grinding operation is over.*

Description : Traffic census at a level crossing shall be done by a) A team of SSE/ P Way and SSE/ Works b) A team of SSE/ P Way and Traffic inspector c) A team of SSE/ P Way and Signal Inspector d) A multidisciplinary team of SSE/ P Way, Signal Inspector and Traffic Inspector*.

Last Answer : d) A multidisciplinary team of SSE/ P Way, Signal Inspector and Traffic Inspector*.

Description : The minimum and maximum clearances of check rails at all BG level crossings shall be a) 51 to 57 mm* b) 44 to 48 mm c) 41 to 45 mm d) 55 to 70 mm

Last Answer : a) 51 to 57 mm*

Description : On Broad gauge tracks whistle indicator shall be provided at a distance of ---------- from level crossing along the track a) 400 meters b) 600 meters* c) 350 meters d) 500 meters

Last Answer : b) 600 meters*

Description : As per GCC Engineer shall mean_____

Last Answer : DEN / XEN

Description : Greasing of bearing shall be done with

Last Answer : grease graphite

Description : In case of distressed bridge category II, ADEN shall inspect the bridge

Last Answer : once in 6 months

Description : Renewal of loose rivet shall be taken up in end bearing stiffener when the % of hammer loose rivet is

Last Answer : 30%

Description : The URN of minor bridge shall be represented by its

Last Answer : ORN

Description : While painting with Aluminium paint, a little quantity of ………..shall be added to the paint while doing the first coat to distinguish it from the second coat a) little blue paint* b) lamp black c) red paint d) green paint

Last Answer : a) little blue paint*

Description : While painting with red oxide paint, a little quantity of ………..shall be added to the paint while doing the first coat to distinguish it from the second coat a) little blue paint b) lamp black* c) red paint d) green paint

Last Answer : b) lamp black*

Description : The pressure on soil worked out shall be ……… the SBC of the soil. a) more than b) equal to c) not equal to d) less than*

Last Answer : d) less than*

Description : For end bearing piles, the minimum spacing of piles of diameter ‘d’ shall be a) 3d b) 2d c) 2.5d* d) 5d

Last Answer : c) 2.5d*

Description : Facia boards of platform shelters shall have a minimum horizontal clearance of ……. from C.L. of track at a minimum height of 4.61m above RL. a) 2360 mm b) 3660 mm c) 3000 mm d) 1600 mm*

Last Answer : d) 1600 mm*

Description : The embankment width in approach of the bridge shall be a) 5870 mm b) 6525 mm c) 6850 mm* d) 6000 mm

Last Answer : c) 6850 mm*