If the expected time for completion of a project is 10 days with a standard deviation of 2 days, the
expected time of completion of the project with 99.9% probability is
(A) 4 days
(B) 6 days
(C) 10 days
(D) 16 day

1 Answer

Answer :

(D) 16 days

Related questions

Description : If the expected time of completion of a project is 60 weeks with a standard deviation of 5 weeks, the probability of completing the project in 50 weeks and 65 weeks respectively will be (A) 2.3% and 84.1% (B) 97.7% and 84.1% (C) 97.7 % and 15.9% (D) 15.9% and 97.7%

Last Answer : (A) 2.3% and 84.1%

Description : What is the benefit of using PERT/CPM network as integral component of project management? a. They furnish a consistent framework for planning, scheduling, monitoring and controlling project b. They illustrate ... that the project will be completed by a specific date d. All of the above

Last Answer : d. All of the above

Description : Political unrest, budget overruns, size and complexity of the project  Answer: B  (8)Decision trees are best used for : 1. Determining the interaction of the amount at stake and the expected ... and the associated events  4. A flow chart which determines the standard deviation of the risk event

Last Answer : 3. An illustration of how to see the interactions between decisions and the associated events

Description : What is the standard deviation and what is the probability that a student scored higher than 322 if the mean test score is 312 and 16 percent of the scores are under 307?

Last Answer : Assuming a normal distribution:If 16% are less than 307, then 84% are greater than 307.Using single tailed normal tables we want the z value whichgives 84%-50% = 34% = 0.34 to the left of the mean; this is z ≈ ... 1 - 0.977 = 0.023 = 2.3 % are greater than 322→ probability greater than 322 is 2.3%

Description : Dust collection efficiency of electrostatic precipitator can be as high as 99.9%. Maximum temperature and pressure of dust laden gas that can be cleaned in an electrostatic precipitator is respectively. (A) 200°C and 5 atm (B) 1000°C and 10 atm (C) 500°C and 50 atm (D) 1000°C and 500 atm

Last Answer : (B) 1000°C and 10 atm

Description : A measure of risk per unit of expected return A.standard deviation B . Coefficient of variation C.Correlation coefficient D. Beta 

Last Answer : Answer: B 

Description : The sun is made up of 99.9% of -------- and -------? A. Oxygen and Hydrogen B. Hydrogen and Sulfur C. Carbon and Silicon D. Hydrogen and Helium (Answer)

Last Answer : D. Hydrogen and Helium (Answer)

Description : Electrolytic reduction cell used for conversion of calcined Al2O3to Al is a carbon lined furnace operating at 800-900 °C. The purpose of electric current supplied to the furnace is to (A) Achieve very high ... by the generation of heat (C) Electrolytically dissociate alumina (D) Both (B) & (C)

Last Answer : (D) Both (B) & (C)

Description : The probability distribution taken to represent the completion of time in PERT analysis is (a) Normal Distribution (b) Bet Distribution (c) Gamma Distribution (d) Gaussain Distribution

Last Answer : (a) Normal Distribution

Description : Gross assets are Rs.1,01,000, fictitious assets Rs.350 are included in the gross assets. External liabilities are Rs.7,500. 6% prefer share capital is Rs.45,000. Equity capital is 4,500 equity shares of Rs.10 each fully ... . The Net Asset Value Per share is A Rs.11 B Rs.10.70 C Rs.15 D Rs.20

Last Answer : Rs.10.70

Description : If the average compressive strength is 4000 kg/cm2 and standard deviation is 500, the co-efficient of variation is (A) 10 % (B) 12.5 % (C) 15 % (D) 18.5%

Last Answer : Answer: Option B

Description : The hydrologic risk of a 100-year flood occurring during the 2-year service life of a project is (a) 9.8% (b) 9.9% (c) 19.9% (d) 1.99%

Last Answer : (d) 1.99%

Description : B) 4.9% Explanation: India is expected to equal China s 4.9% share of world GDP in 2005 by the middle of next decade and if the country grows faster, the date can be advanced. India s economy grew ... major economy. HSBC said that if India grows at 8% rate, it would achieve the 4.9% share by 2027.

Last Answer : Which payment company launched a new POS terminal which seeks to ease payments across millions of small merchant outlets across India? A) PayUmoney B) Udio C) Paytm D) MoneyGram E) None of these

Description : X,Y and Z can do a certain job in 72,108 and 144 days respectively. They started the job but X left 16 days before the completion of the job while Y left 24 days before the completion. The number of days for which Z worked is. a) 12 days b) 24 days c) 36 days d) 48 days

Last Answer : D Suppose the work was finished in a' days Then X's (a - 16) day's work + Y's (a - 24) days + Z's a days work = 1 (a-16)/72 + (a-24)/108 + a/144 =1 lcm of 72,108,144 is 432 (6(a-16) + 4( ... = 432 6a - 96 +4a - 96 =3a = 432 13a - 192 = 432 13a = 624 => a =48 Therefore Z worked in 48 days.

Description : For completion of a project, the critical path of the network represents (A) Minimum time (B) Maximum time (C) Maximum cost (D) Minimum cost

Last Answer : (A) Minimum time

Description : Updating may result in (A) Change of critical path (B) Decrease of project completion time (C) Increase of project completion time (D) All of the above

Last Answer : (D) All of the above

Description : A bar chart is commonly used because (a) It is simple to draw and easy to understand (b) It indicates at a glance the overall progress of the project (c) It shows critical ... critical activities (d) It incorporates uncertainties for delay in estimation of time required for completion of activities.

Last Answer : (a) It is simple to draw and easy to understand

Description : method requires the following data pertaining annual flood series (i) Mean value (ii) Standard deviation (iii) Length of record (iv) Coefficient of skew The correct answer is (A) (i) and (ii) (B) (i),(i) and (iii) (C) (i), (ii) and (iv) (D) (i), (ii), (iii) and (iv)

Last Answer : Answer: Option B

Description : As per IS: 456-2000, recommended value for standard deviation for concrete mix from M30 to M50 is [ A ] 1 N/mm2 [ B ] 2 N/mm2 [ C ] 4 N/mm2 [ D ] 5 N/mm2

Last Answer : [ D ] 5 N/mm2

Description : As per IS:456, the strength of concrete sample is less than [ A ] The characteristic strength minus 1.35times the standard deviation [ B ] 0.80 times the characteristic strength [ C ] Greater of (a) and (b) [ D ] None of the above

Last Answer : [ C ] Greater of (a) and (b)

Description : According to a statistical report: over 30% of all projects are cancelled before completion and over 70% of the remainder fail to deliver expected features . What must be the reason for such ... change management b) Poor requirements management c) Poor quality control d) All of the mentioned

Last Answer : b) Poor requirements management

Description : The deviation of a reading from the expected value

Last Answer : error

Description : . When estimating project time schedules using industry standards, the estimated  project completion time for a systems project would be _____ person-months if the actual  planning phase were completed in 6 person-months.  a. 30  b. 40  c. 17.14  d. 9  e. 50

Last Answer : b. 40

Description : What is the standard deviation of the following data set rounded to the nearest tenth 52.1 45.5 51 48.8 43.6?

Last Answer : Feel Free to Answer

Description : Provided that the ACT is reasonably normally distributed with a mean of 18 and standard deviation of 6, determine the proportion of students with a 33 or higher. a. 0.0062 b. 0.0109 c. 0.0124 d. 0.0217

Last Answer : a. 0.0062

Description : What is the deviation ratio for an FM-phone signal having a maximum frequency swing of plus or minus 5 kHz and accepting a maximum modulation rate of 3kHz? A. 60 B. 0.16 C. 0.6 D. 1.66

Last Answer : D. 1.66

Description : In quantum chemistry, a nodal surface: w) gives 99 percent contour surface for an orbital x) exists for a 1s orbital y) has quantum number l = 1 z) is an orbital surface on which the probability density is zero

Last Answer : ANSWER: Z -- IS AN ORBITAL SURFACE ON WHICH THE PROBABILITY DENSITY IS ZERO 

Description : Petri is working for Nokia in Finland. He has completed 10 months of his 12-month project, budgeted at $800,000. His earned value analysis shows that variance at  completion is $75,000. What is the estimate at completion value ... : a. 725,000 b. -725,000 c. -$875,000 d. $875,000 e. $800,000

Last Answer : d. $875,000

Description : Rakchita can do a piece of work in 28 days, while Shreya can do the same work in 42 days.They started the work together but 6 days before the completion of the work, Rakchita left the work. The total number of days to complete the work is a) 3 b) 4 c) 5 d) 6 

Last Answer : D 6 days before the completion of the work Rakchita left the work means in last 6 days only Shreya has worked alone So, in last 6 days worked done by Shreya = 6*1/42=6/42=1/7 So, the rest = 1-1/7 =6/7 So 6/7work was done by Rakchita and Shreya worked together=6/7*70/10 =420/70=6 days

Description : For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5, 17 and 8 days respectively, The expected time is (A) 8 days (B) 9 days (C) 10 days (D) 15 days

Last Answer : (B) 9 days

Description : A,B and C can do a work in 20,45 and 120 days respectively.They started the work. A left 10 days before and B left 5 days before the completion of wor

Last Answer : A,B and C can do a work in 20,45 and 120 days respectively.They started the work. A left 10 ... work. In how many days is the total work completed ?

Description : You are a project manager for Move It Now trucking company. Your company specializes in moving household goods across the city or across the country. Your project involves upgrading the nationwide computer network for the ... the weighted average or expected value? A. 54 B. 66 C. 60 D. 30

Last Answer : C. 60

Description : What is the qualifying time for the fastest 5 percent of all runners if the average finishing time is 5 minutes 17 seconds with standard deviation of 12 seconds?

Last Answer : Assuming a normal distribution:For the fastest 5% we need to find the z value which gives 100%- 5% = 95% of the area under the normal curve (from -∞).Using single tailed tables, we need the z value which gives 95%- 50% ... deviation≈ 5 min 17 sec + 1.645 12 sec≈ 5 min 17 sec + 20 s= 5 min 37 sec

Description : In which of the following towns does the LMT (Local Meridian Time) show the greatest deviation from the 1ST (Indian Standard Time) ? [NDA 1991] (a) Delhi (b) Cochin (c) Mumbai (d) Kohima

Last Answer : Ans: (d)

Description : Who orchestrate the completion of the project by inducting the right people at the  right time to address the right issue and make the right decisions?  A.Project Coordinator  B.Project Manager  C.Operations Manager  D.Strategic Business Unit Head

Last Answer : B.Project Manager

Description : Which stage of project management life cycle requires the maximum time of  completion  A.Conceptualization  B.Planning  C.Execution  D.Estimation

Last Answer : C.Execution

Description : What is a project phase? A. A collection of logically related project activities that culminate in the completion  of one or more deliverables (Ans.)  B. A singular activity that completes a ... that has very similar parts D. A consistent period of time that is used throughout a project

Last Answer : A. A collection of logically related project activities that culminate in the completion  of one or more deliverables (Ans.)

Description : A prerequisite of effective time management is:  1. Knowing the dictated project completion date  2. Having the most advanced software package for project planning, scheduling and control  3. ... and the  person responsible for each of them  4. Having a well staffed scheduling department

Last Answer : 1. Knowing the dictated project completion date

Description : An activity whose start or end cannot be delay without affecting total project completion time is called ______ activity a. Dummy b. Non-critical c. Critical d. Important

Last Answer : c. Critical

Description : ........................... is the latest time by which an activity can be finished without delaying the completion of the project. a. LST b. LFT c. EFT d. EST

Last Answer : b. LFT

Description : ..................... is the duration by which an activity can be delayed without delaying the completion of the project. a. Earliest Start Time b. Earliest Finish Time c. Latest Start Time d. Latest Finish Time

Last Answer : c. Latest Start Time

Description : In a PERT network, slack time is _____. (a) The end point that represents the completion of a major activity (b) The time or resources required to progress from one event to another ( ... without delaying the whole Project (d) The longest or most time-consuming sequence of events and activities 

Last Answer : (c) The amount of time an individual activity can be delayed without delaying the whole Project 

Description : What does standard deviation result mean?

Last Answer : It shows you how dispersed the results are.

Description : Standard deviation and mean?

Last Answer : It is very handy to just memorize the 68 – 95 – 99.7 rule. It means 68% of the population is within +/-1 SD, 95% are within 2 SD and 99.7 are within 3 SD.

Description : Statistics question. Finding the standard deviation for these numbers: 1, 2, 98, 100, 105.

Last Answer : Hint: There aren’t going to be any trick questions in statistics. There is enough information to calculate the standard deviation.

Description : How to understand this Standard Deviation question?

Last Answer : So, this question is related to the definition of standard deviation, rather then having to calculate it. I refer you to wikipedia, which has a decent write-up. Specifically the rules for normally distributed data ... the math there is too high-level, just take a good look at the plot on the right.

Description : How do I find the mean and standard deviation from a frequency table?

Last Answer : Do you have a graphing calculator?

Description : Range, and Standard Deviation?

Last Answer : http://en.wikipedia.org/wiki/Range_%28statistics%29 http://en.wikipedia.org/wiki/Arithmetic_mean http://en.wikipedia.org/wiki/Standard_deviation#Basic_example_of_a_population_standard_deviation

Description : How to compute mean and standard deviation for each column of a pandas dataframe -Web-Development

Last Answer : answer:

Description : What is the standard deviation ?