)To be successful in a functional organization, the PM must rely on:

1. Referent power 

2. Formal authority 

3. Informal power structure 

4. Broad span of control 

5. Both a and c

1 Answer

Answer :

5. Both a and c

Related questions

Description : )Which form of power is the LEAST effective from the project manager's viewpoint in terms of influencing functional managers? 1. Formal power  2. Expert power  3. Penalty power  4. Referent power

Last Answer : 3. Penalty power

Description : The most successful project manager usually: 1. works their way up from assistants in the project office to full-fledged project managers,  supplementing that experience with formal ... . Has considerable experience as a functional manager before moving into the project  management arena.

Last Answer : 1. works their way up from assistants in the project office to full-fledged project managers,  supplementing that experience

Description : Which of the following is the employer-employee authority relationship that follows the chain of command? (a) Staff authority ; (b) Referent power ; (c) Line authority ; (d) Functional authority

Last Answer : (c) Line authority ; 

Description : The project manager has the most authority in the __________________ type of  organization. 1. Project expediter  2. Matrix  3. Projectized organization  4. Functional

Last Answer : 3. Projectized organization

Description : Which organization structure does not have duplication of work? a. Formal b. Informal c. Both (a) and (b) d. None of these

Last Answer : a. Formal

Description : To successfully manage a project, the PM must play both a manager and leadership role. In the manager role the PM will do all but which of the following: 1. Develop procedures  2. Align people  3. Produce results for stakeholder  4. Focus on the organization and its structure 5. Both b and d

Last Answer : 2. Align people

Description : Shauna has recently been appointed as a project manager for Project SkyNorth,  which is regarded as an important project in her organization. During the project  planning meeting, ... b. Matrix organization c. Functional organization d. Projectized organization e. Hierarchical organization

Last Answer : d. Projectized organization

Description : “A body of persons elected or appointed to meet on an organised basis for the discussion and dealing of matters brought before it.” It is called– (A) Functional organisation (B) Formal organisation (C) Committee organisation (D) Informal organisation

Last Answer : Answer: Committee organisation

Description : _____ conflict hinders group performance. (a) Formal ; (b) Informal ; (c) Functional ; (d) Dysfunctional

Last Answer : (d) Dysfunctional 

Description : _____ conflict supports the goals of the group and improves its performance. (a) Formal ; (b) Informal ; (c) Functional ; (d) Dysfunctional

Last Answer : (c) Functional ;

Description : Complete the following statement. In a weak matrix environment, the  project manager, Eric, has to constantly make an effort to influence his  project team and stakeholders to ensure project success. ... managers. d. there are no functional managers. e. Eric has flexibility on authority.

Last Answer : b. Eric has no or little authority.

Description : ____________ refers to the network of personal and social relations that is developed spontaneously between people associated with each other. (a) Formal organization ; (b) Informal organization ; (c) Business organization (d) Government organization

Last Answer : (b) Informal organization ;

Description : Which organization is characterized by very formal rules, centralized authority, and narrow spans of control? (a) Boundaryless ; (b) Matrix ; (c) Virtual ; (d) Bureaucracy

Last Answer : d

Description : Wider span of control is effective in organization where– (A) authority delegation is inadequate (B) tasks are complex (C) thorough subordinate training scheme exists (D) the leadership style is authoritarian

Last Answer : Answer: thorough subordinate training scheme exists

Description : (1)Milestones established by the customer must be adhered to by: 1. Project manager  2. Functional managers  3. The customer 4. Both a and b

Last Answer : 4. Both a and b

Description : The organisation in which power of authority runs in straight line is called– (A) Line organization (B) Functional organisation (C) Committee organization (D) None of the above

Last Answer : Answer: Line organization

Description : Although planning provides numerous benefits, some managers do not use formal marketing plans because A)formal plans are not necessary to control marketing activities. B)they think planning is a waste ... dealing with daily problems. E)they spend most of their time engaged in environmental scanning.

Last Answer : D)they spend almost all their time dealing with daily problems.

Description : ) One of the initial project documents, issued by senior management, which outlines the  authority of the project manager, is called Project charter. As a seller, what other document can  be used in this place: 1. Work breakdown structure  2. Project scope  3. Contract  4. Internal memo

Last Answer : 3. Contract

Description : An organizational design with low departmentalization, wide spans of control, authority centralized in a single person and little formalization are characteristics of ________. (a) Simple structure ; (b) Functional structure ; (c) Divisional structure ; (d) None of given option

Last Answer : (a) Simple structure ; 

Description : Which one of the following best describes a project issue? a. A major problem that requires formal escalation. b. A problem that the project manager has to deal with on a day-to-day basis. c. An uncertain event that may or may not occur. d. An opportunity that occurs through change control.

Last Answer : a. A major problem that requires formal escalation.

Description : In large organisations, project management shall be of line type function where the  project manager shall have ____ and has total formal control over the division he or she  heads

Last Answer : Ans. Full line authority

Description : Which one of the following best describes a project issue?  a. A major problem that requires formal escalation.  b. A problem that the project manager has to deal with on a day-to-day basis.  c. An uncertain event that may or may not occur.  d. An opportunity that occurs through change control.

Last Answer : a. A major problem that requires formal escalation.

Description : Expert power is the power that comes from the amount of knowledge a person has obtained in  a specific area. This type ofpower is: 1. Critical to a project manager because the PM has to have ... by the PM because the PM cannot stay current on all areas of  expertise and also manage the project

Last Answer : 4. Used sparingly if at all by the PM because the PM cannot stay current on all areas of  expertise and also manage the project

Description : Most of the project manager's external communication links consist of: 1. Written documents  2. Oral communication  3. Tactile contact  4. Informal contact

Last Answer : 1. Written documents

Description : An employee's experience in a situation or position outside his or her current organization is a referent comparison called: (a) Other-inside ; (b) Self-outside ; (c) Self-inside ; (d) Other-outside

Last Answer :  (b) Self-outside ;

Description : How to be good in English conversation? both formal and informal?

Last Answer : Just hang on here for a while. Welcome to fluther. And it’s “people I meet don’t even think but have clearly composed, and I want to be better at it. And Hope you can help me”... Good luck.

Description : Teaching model is a way to Options: A) teach in a formal as well as informal way. B) Select such stimulus so that, the students may give expected feedback. C) Talk and think about instruction, which may contain facts in organized and classified manner. D) both (a) and ( b)

Last Answer : D) both (a) and ( b) 

Description : Which one of the following statements is correct? (A) Syllabus is an annexure to the curriculum. (B) Curriculum is the same in all educational institutions. (C) Curriculum includes both formal, and informal education. (D) Curriculum does not include methods of evaluation.

Last Answer : Answer: A Explanation: Curriculum refers to the sum of all the activities in an out of the school, syllabus is only a small part of it.

Description : Which of the following is characterized by wide spans of control, little formalization, a low degree of departmentalization, and authority centralized in a single person…………… (a) Bureaucracy ; (b) Simple structure ; (c) Matrix organization ; (d) Mechanistic structure

Last Answer : (b) Simple structure ;

Description : Which of the following is an important action that must be taken by top management when  implementing project management in an organization? 1. Completely selling the project management concept to the entire ... Choice of the type of project organization to be utilized.  4. All of the above.

Last Answer : 4. All of the above.

Description : _____ is an individual's capacity to influence decisions a) Span of control ; (b) Line authority ; (c) Staff authority ; (d) Power

Last Answer : Line authority

Description :  According to PMBOK, project management process groups are iterative, which  was originally defined by Walter Shewhart and later modified by Edward Deming.  Generally, one outcome from a previous process can serve ... -Do-Check-Act cycle c. Project phases d. PM processes e. HR process cycle

Last Answer : b. Plan-Do-Check-Act cycle

Description : How many PM knowledge areas are defined by Project Management Institute (PMI)  A. Six  B. Four  C. Eight  D. Ten (Ans.)

Last Answer : D. Ten (Ans.)

Description : The PM distributed a document to the stakeholders, which described the software to be  developed, the functionality, the users it would serve and the installation timeline. The document  was an example of: ... scope  4. It was not complete enough to be either a product or a project scope document

Last Answer : 4. It was not complete enough to be either a product or a project scope document

Description : To successfully motivate a team in today's high tech - high demand environment, which  motivational theories should the PM use to maintain a happy, productive team? 1. Expectancy and Theory X  ... 3. Theory Y, Expectancy and Herzberg's Hygiene Factors  4. Herzberg's Hygiene Factors and Expectancy

Last Answer : 3. Theory Y, Expectancy and Herzberg's Hygiene Factors

Description : What is "strategic control"? a) Control over the production process within an organization, in the sense of determining how the employees of an organization perform their work. b) The ... production process within an organization, in the sense of determining how informal practices are performed.

Last Answer : Control over the means and methods on which the whole conduct of an organization depends.

Description : Is it not high time for the english language to replace the pronoun "you", with separate words for informal and formal contexts?

Last Answer : Why? As a native English speaker, the difference seems unnecessary and overly complicated. And now that you mention it, classist.

Description : Do you expect specific treatment from people based on their age, job, whether you're friends or not, etc? Do you get formal or informal with people, or do you treat all the same?

Last Answer : Good question. In the Netherlands we also have both formal and informal you's, namely, U (formal), and Jij (informal). Lately I have been addressed more and more in the formal manner, which saddens me, as ... on age, job, familiarity. I don't expect special treatment, by the way. Don't care for it.

Description : How to understand informal and formal - General Linguistics class?

Last Answer : Formal is how the old Danish would use De instead of deg, and even use a capital . is that what you mean? In English, they used to use Thou instead of you' but they don't so that any ... have pretty much given up on the formal stuff, too. Informal is when you just use regular, everyday speech.

Description : What are differences between formal and informal sources of credit? -SST 10th

Last Answer : Formal sources: 1.These sources of credit are registered by the government and have to follow its rules and regulations. 2.RBI supervises the functioning of formal sources of credit. 3.They ... main motive is profit-making. Example: Moneylenders, traders, employees, relatives and friends, etc.

Description : Why does the formal or informal sector ask for a collateral? -SST 10th

Last Answer : . Every loan agreement specifies an interest rate which the borrower must pay to the lender along with the repayment of the principal. . In addition, lenders may demand a collateral or an asset ... and the mode of repayment are the terms of credit required for formal or informal sectors for loans.

Description : Compare formal sector loans with an informal sector of loans regarding interest only. -SST 10th

Last Answer : The loans given by the formal sector have low rates of interest whereas the loans given by the informal sector have very high rates of interest.

Description : Mention any three points of distinction between formal sector loan and informal sector loan. -SST 10th

Last Answer : Three points of distinction between Formal sector loan and Informal sector loan

Description : Explain any two features each of formal sector loans and informal sector loans. -SST 10th

Last Answer : Formal Sector Loans : Formal sector loans include loans from banks and cooperatives. Features of formal sector loans are : (i) Formal sectors provide cheap and affordable loans and their ... the borrowers personally, and hence they provide loans on easy terms without collateral and documentation.

Description : Differentiate between formal and informal sources of credit. -SST 10th

Last Answer : Difference between Formal and Informal Sources

Description : Mention four characteristics each of the formal and informal sources of credit in India. -SST 10th

Last Answer : Features of formal sources of credit are : (a) Formal sources of credit are provided by banks and cooperative societies to the borrowers. (b) Reserve Bank of India (RBI) governs the ... . (d) They generally charge higher rates of interest and exploit the borrowers for their own benifits.

Description : Explain any two features each of formal sector loans and informal sector loans. -SST 10th

Last Answer : Formal Sector Loans (i) It provides loans at a fixed rates and terms. (ii) It gives loans not just to profit-making businesses and traders but also to small cultivators, small-scale industries to small ... choose. (ii) There is no one to stop them from using unfair means to get their money back.

Description : Differentiate between formal and informal sources of credit. Explain problems faced by borrowers of loan from informal sources. -SST 10th

Last Answer : The moneylenders charge very high rates of interest keep no records of transactions and harass the poor borrowers.

Description : Mention three points of difference between formal sector and informal sector loans. -SST 10th

Last Answer : Formal sector loans: (i) Loans from banks and cooperatives. (ii) Under supervision of the Reserve Bank of India. (iii) Reasonable rates of interest. Informal sector loans: (i) Loans from ... friend, traders, etc. (ii) No supervision of any institution. (iii) Very high rates of interest.