Explain with neat sketch stepwise procedure to determine bulk density by sand replacement method.

1 Answer

Answer :

image

i) A flat area, approximately 450sq.mm of the soil to be tested should be exposed and trimmed down to a level surface, preferably with the aid of the scraper tool. ii) The metal tray with a central hole should be laid on the prepared surface of the soil with the hole over the portion of the soil to be tested. The hole in the soil should then be excavated using the hole in the tray as a pattern, to the depth of the layer to be tested upto a maximum of 150mm. The excavated soil should be carefully collected, leaving no loose material in the hole and weighed to the nearest gram(Ww). The metal tray should be removed before the pouring cylinder is placed in position over the excavated hole. iii) The water content (w) of the excavated soil should be determined as discussed in earlier posts. Alternatively, the whole of the excavated soil should be dried and weighed (Wd). iv) The pouring cylinder, filled to the constant weight (W1) should be so placed that the base of the cylinder covers the hole concentrically. The shutter should then be opened and sand allowed to runout into the hole.The pouring cylinder and the surrounding area should not be vibrated during this period. When no further movement of sand takes place, the shutter should be closed. The cylinder should be removed and weighed to the nearest gram (W4). v) The internal volume (V) in ml of the calibrating container should be determined from the weight of water contained in the container when filled to the brim. The volume may also be calculated from the measured internal dimensions of the container. vi) The pouring cylinder should be placed concentrically on the top of the calibrating container after being filled to the constant weight (W1). vii)The shutter of the pouring cylinder should be closed during the operation. The shutter should be opened and sand allowed to runout. When no further movement of sand takes place in the cylinder, the shutter should be closed. The pouring cylinder should be removed and weighed to the nearest gram. These measurements should be repeated at least thrice and the mean weight (W3) taken.

image 

image  

Related questions

Description : Write the laboratory procedure to determine liquid limit by Casagrande’s method with neat sketch.

Last Answer : Procedure of liquid limit 1. Take about 120 gm of air dried soil sample passing through 425 micron IS Sieve in metal tray. 2. Add 20% distilled water to form uniform soil paste. 3. Put this soil paste in the ... graph as liquid limit (wL) of given soil sample.  (ii) Grooving Toos  

Description : Define specific gravity of soil. Explain the stepwise procedure of determination of specific gravity of soil by pycnometer. 

Last Answer : Specific Gravity: It is ratio of unit weight in air of a given volume of soil solids at a specific temperature to unit weight in air of an equal volume of distilled water at same temperature. ... Repeat all above steps two more times to calculate average specific gravity of given soil sample.

Description : Explain California bearing Ratio Test with neat sketch to determine % CBR of given soil sample.

Last Answer : Procedure of California Bearing Ratio Test: 1. Take a given soil; sample and add water equal to OMC of soil to prepare wet mix soil. 2. Take the CBR mould of 150 mm diameter and 175 mm height. Keep it ... Bearing Ratio of given soil as  % CBR = (Test load / Standard load ) X 100.

Description : Explain plate load test with neat sketch to determine bearing capacity of soil.

Last Answer : Procedure of plate load test: 1. Excavate a pit of depth equal to 5 times to that of breath of proposed footing. 2. Keep the suitable bearing plate of specified size (30, 45, 60, 75cm square in plan) ... as shown in figure below to find out load before failure as bearing capacity of soil.

Description : Write step by step procedure to determine coefficient of permeability of fine grained soil by falling head method in laboratory.

Last Answer : This method is suitable for fine grained soil as quantity of water collected through soil mass is very less and cannot be measured accurately 2. The falling head test is used for relatively less permeable ... equal to the difference of water level in the stand pipe and the bottom tank. 

Description : Explain with neat sketch Phreatic line in earthen dam with pressure head at different point and show construction points of this line. 

Last Answer : Procedure for locating the Phreatic line i) Draw an earthen dam having upstream face AB with water surface. ii) On water surface measure distance BC = 0.3 L C is starting pt of base parabola. Let F' ... parabola i.e. Phreatic line. viii) Here G,Q1,Q2,Q3,Q4 and B represent Phreatic line 

Description : Explain crust, mantle and core with a neat sketch.

Last Answer : The planet earth is composed of 3 parts namely :-  a) Atmosphere  b) Lithosphere  c) Hydrosphere  The Lithosphere is solid and stony portion of the earth. The body of earth is subdivided into three ... is hot and solid. The average density is about 12 g/cc. It consist iron & nickel. 

Description : Explain Atterberg’s limits of consistency with neat sketch.

Last Answer : Atterberg's Limit of consistency: Liquid limit (WL): It is minimum water content at which two separated grooved soil parts mixed together under 25 blows of casagrande's liquid limit apparatus; is ... volume of soil due to further decrease in water content is termed as shrinkage limit.

Description : Explain with neat sketch particle size distribution curve.

Last Answer : Particle size distribution curve (PSDC) is the semi log graph drawn as sieve size versus % finer of given soil sample. The PSDC is useful for grading of soil i.e. classification of ... : When graph is of wavy nature indicating particles of only specific size and deficiency of other sizes. 

Description : Describe Direct Shear Test with Neat Sketch.

Last Answer : 1. Take 250gm of dry sand in a shear box of 60mm x 60mm x 50mm and fix the upper part and lower part of box by locking screw and attach the base plate to lower part. 2. Place the grid ... normal stress on X axis. 12. The angle gives the shearing resistance and the intercept gives cohesion.

Description : Define folds and draw neat sketch of a fold and label its different parts. 

Last Answer : Fold: Folds may be defined as undulations or bends that are developed in the rock of the Earth’s crust, as a result of stresses (commonly lateral compression) To which these rocks have been subjected to, from time to time in the past history of the Earth.

Description : Explain standard proctor test on soil to determine OMC and MDD of soil with sketch.

Last Answer : Procedure of Standard Proctor Test: 1. Take about 5 Kg. of de-aired soil passing through sieve 20 mm in tray. Add about 4% water (approximately 120 ml) to the soil and mix thoroughly with ... corresponding to the standard proctor compaction by plotting graph water content v/s. dry density.    

Description : Write step by step procedure to determine specific gravity of soil by pycnometer in laboratory.

Last Answer : 1. Clean the pycnometer and dry it, find the mass of pycnometer, brass cap and washer accurate to 1g. say M1 2. Put about 200gm to 400gm of wet soil sample in pycnometer and find its mass with its cap ... it top of cap and find its weight say M4. 5. The specific gravity is calculated by 

Description : Explain the plate load test with sketch of reaction truss method.

Last Answer : i) Plate load test is field test to determine the ultimate bearing capacity of soil and probable settlement under given loading. ii)The test essentially consist in loading a rigid plate, called bearing ... and load intensity and ultimate bearing capacity (qu) of soil is found out. 

Description : State the procedure for the determination of water content by oven-drying method.

Last Answer : i) This is commonly adopted and simplest method for determination of water content of a soil sample in the laboratory. ii) The method basically consists of drying a weighed moist sample of soil in an oven ... The above table gives the minimum quantity of soil sample to be taken for test.  

Description : Explain the method of determination in-situ density with a core-cutter.

Last Answer : Dry unit weight of soil (γd) :The dry unit weight (γd) is the weight of solids (Ws) per unit of its total volume (V) (prior to drying) of the soil mass. (γd) = Ws/ V Procedure ... content determination. -Repeat the test at two or three locations nearly and get the average dry density

Description : Explain phreatic line in earthen dam with a sketch.

Last Answer : Phreatic line in earthen dam1.The line in earthen dam section below which there is positive hydrostatic pressure exists. Phreatic line separates the dry and wet part of earthen dam body as it acts as boundry ... toe material. Hence, a rock toe is necessary to avoid removal of toe portion of dam. 

Description : Draw particle size distribution curve. Explain mechanical sieve analysis for grading of soil with a sketch.

Last Answer : Mechanical sieve analysis -The process of analyzing the particle size present in soil by using mechanical means, is known as mechanical sieve Analysis. By performing mechanical sieve analysis, a particle size ... c) Fine grained soil d) Coarse grained soil e) Uniformly graded soil

Description : Explain with sketch mechanical sieve analysis.

Last Answer : Mechanical sieve analysis - The process of analyzing the particle size present in soil by using mechanical means, is known as mechanical sieve Analysis. By performing mechanical sieve analysis, a particle size ... c) Fine grained soil d) Coarse grained soil e) Uniformly graded soil

Description : Explain with sketch Mohr-Coulomb failure theory.

Last Answer : Mohr presented a theory for rupture in materials. The failure along a plane in a material occurs by a critical combination of normal and shear stresses, and not by normal or shear stress alone. The ... to the Mohr circles can be drawn, and is called the Mohr-Coulomb failure envelope. 

Description : Explain with sketch concept of zero air voids line.

Last Answer : Zero Air Void Line: If the soil is assumed to be 100% saturated and different dry densities are calculated for 100% saturation, then the resulting line on the compaction curve is called the ... respect to water content cannot reach its theoretical value even after applying heavy compaction.

Description : Explain with sketch flow net

Last Answer : Flow Net: The grid, mesh or net formed by intersection of equipotential line and flow lines is called as flow net. In a flow net, flow lines and equipotential lines intersect each other at right ... . The flow net is representative of the flow pattern and dissipation of the hydraulic head.

Description : Explain with sketch specific gravity determination by pcynometer.

Last Answer : Determination of specific gravity by pycnometer test: Precedure :- 1. Dry the pycnometer and weigh it with its cap (W1) 2. Take about 200 g to 300 g of oven dried soil passing through 4. ... with cap screw on. 8. Weigh the pycnometer after drying it on the outside thoroughly (W4).

Description : Explain with sketch plate load test.

Last Answer : Procedure i) Excavate a pit of depth equal to 5 times to that of breath of proposed footing. ii) Keep the suitable bearing plate of specified size (30, 45, 60, 75cm square in plan) ... Finally plot a graph of load vs. settlement to find out load before failure as bearing capacity of soil. 

Description : Explain modified proctor test with sketch.

Last Answer : Procedure: i. Take about 5 Kg. of de-aired soil passing through sieve 20 mm in tray. ii. Add about 4% water (approximately 120 ml.) to the soil and mix thoroughly with trowel and cover it ... degree of saturation corresponding to the maximum dry density as OMC and MDD of given soil sample. 

Description : Explain the determination of liquid limit of soil with neat sketches.

Last Answer : Procedure of Liquid Limit Test: 1. Take about 120 gm. of air dried soil sample passing through 425 micron IS sieve in metal tray. Add 20 % distilled water to the soil sample to form uniform soil ... content corresponding to 25 blows from graph as liquid limit (WL) of given soil sample.  

Description : Explain laboratory procedure for mechanical sieve analysis of soil.

Last Answer : Laboratory Procedure for mechanical sieve Analysis Mechanical in laboratory 1) Dry sieve Analysis 2) Wet sieve analysis Apparatus required for test - i) Weighing balance accurate to 1g and 0.1g ... through the set of sieves. The material retained on each sieve is weighed and analysed

Description : State the step by step procedure for determination of OMC and MDD using standard proctor test and explain compaction curve. 

Last Answer : Procedure: 1. Take about 5 Kg. of de-aired soil passing through sieve 20mm in tray. 2. Add about 4% water (approximately 120ml) to the soil and mixed thoroughly with trowel and cover it ... decreases. Since there is formation of double layer of water around soil particles in the same volume.  

Description : State any four characteristics of flow net with sketch.

Last Answer : Characteristics of flow net: 1. The flow lines and equipotential lines in the flow net intersects each other orthogonally 2. The area or field formed due to intersection of these lines is approximately ... of flow. 5. The potential drop between two adjacent equipotential lines is same.

Description : Define focus, epicenter, seismograph and isoseismic line with sketch.

Last Answer : i) Focus: The focus is the place beneath the Earth's surface from where an earthquake originates. ii) Epicenter: The point or line on the Earth's surface immediately above the focus ... lines joining points where similar ground motion were experienced they are assessed by examining the damage done.

Description : Explain the direct shear test to determine shear strength of soil.

Last Answer : Procedure for Direct Shear Test: 1. Take 2.5 Kg air dried soil sample passing through 4.75 mm and retained on 2.36mm IS sieve. 2. Measure the internal dimensions of the shear box. Fix ... value Normal Stress as abscissa and the maximum shearing stress as ordinate to find shear strength of soil.

Description : Explain with neat sketch the procedure of radiation method of plane tabling.

Last Answer : 1. The table is set at suitable station e.g. P from where all stations can be sighted and measured. 2. After centering and leveling, mark station P as P' on sheet. 3. Suppose stations A, B, C, and D are ... marked as pa. 5. Similarly station B, C and D are bisected and marked as b, c and d.

Description : Describe stepwise construction procedure of cement concrete road by continuous bay method.

Last Answer : Continuous Construction method: In this method of construction, all the bays or slabs (ABCD) of strip are constructed continuously without any break as shown in figure. In this method, construction joints are, ... be diverted on the other half of the road. This method is also very rapid.

Description : Determine the practical applications of various types of compaction equipments.

Last Answer : Practical applications of compaction equipments: 1. Compaction by rolling: a) Smooth Wheel Rollers: These rollers best suitable for subgrade or base coarse compaction of cohesion less soils. b) Pneumatic ... It is suitable for compacting granular soils with no fines in layer up to 1 m.

Description : Explain the stepwise procedure of estimating volume of reservoir from any contour map.

Last Answer : Reservoirs are made for water supply and for power or irrigation projects. A contour map is very useful to study the possible location of a dam and the volume of water to be confined. All ... reservoir can be estimated by the application of either the trapezoidal or the prismoidal formula.

Description : Explain stepwise the “Detailed energy audit” procedure.

Last Answer : A) Start up meeting: For this programme, we proceed with this meeting. If then continue us until implementation of energy saving measures. B) Analysis of energy used: Identify where ... are considered, the analysis of energy loss and measurement of insulation level is also considered.

Description : State method of construction of earth quake resisting structure.

Last Answer : Methods of Construction of Earthquake Resisting Structure: - 1. The foundation should be provided over the hard rock with no sign of faults. 2. The building should be symmetrical and rectangular in ... Short RCC and Steel column should be designed. 7. Load bearing structures should be avoided. 

Description : The field density and field moisture content of a soil can be determined by 1. Core cutter method 2. Sand replacement method 3. Proctor compaction test 4. Modified proctor compaction test (a) 1, 2, 3 & 4 (b) 1 & 2 only (c) 2 & 3 only (d) 2 & 4 only

Last Answer : (b) 1 & 2 only

Description : Explain the procedure for profile leveling with neat sketch. 

Last Answer : 1) Let PQR be the given line of section.   2) Mark point at 10 m intervals on this line. 3) Level is set up on a firm ground at a suitable point I1. 4) Temporary adjustment of level is done and B. ... and set up on firm ground at I2 as before. 10) B.S is taken on CP1 and new HI is calculated  

Description : Explain with neat sketch the procedure of reciprocal ranging.

Last Answer : Reciprocal ranging / Indirect ranging Procedure: Let A and B be two survey stations. They are not mutually visible due to high ground between them. Let two assistant stands at M1 and N1 as ... and N1 which are nearer to line AB. Repeat same process until points M and N are established. 

Description : (i) Explain zeroth law of thermodynamic with neat sketch. (ii) Write the procedure for Energy saving in household appliances. 

Last Answer : i) Zeroth law of thermodynamics - If two thermodynamic systems are each in thermal equilibrium with a third, then they are in thermal equilibrium with each other ii) Procedure for Energy ... Install energy efficient open glass windows to use sun light. Upgrade your HVAC system.

Description : Describe stepwise construction procedure for water bound macadam roads.

Last Answer : The construction procedure of W.B.M. road is discussed below: 1. Preparation of subgrade : The subgrade is prepared to the required grade and camber. 2. Preparation of the base course : After preparing ... by rolling or tamping. 5. Open to traffic : After drying, the road is opened to traffic.

Description : Describe stepwise procedure to prepare the layout of a small building using total station.

Last Answer : Layout of small building by using total station: 1. On the plan supplied by an architect, number the column serially from left to right and top to bottom starting from top left ... of setting out by comparing the diagonal distance between the extreme column centres to their calculated values.

Description : Describe the stepwise procedure for painting of used vehicle.

Last Answer : Painting procedure for used vehicle: Remove dent using denting tools and dent removing procedure. Preparing the Surface: Begin by sanding the car's surface with a dual action sander and 120 grit sandpaper ... the car. Use circular and back and forth motions until the entire car has been polished.

Description : Write stepwise procedure for converting raw material into finished product.

Last Answer : Planning of process from raw material to finished product:- Steps involved in process planning: 1. Analysis of Product and its specification: - During analysis, following parameter should be considered, ... fixing the rates of payment. 11. Prepare the route sheet and operation sheet.

Description : State the Thevenin’s theorem. Also write stepwise procedure for applying Thevenin’s theorem to simple circuits.

Last Answer : Thevenin's Theorem: Any two terminal circuit having number of linear impedance and sources (voltage, current, dependent, independent) can be represented by a simple equivalent circuit consisting of a single voltage ... 's equivalent circuit: Step V: Determination of Load current:

Description : What is pressure calibration? State stepwise procedure to test the accuracy of pressure gauge with dead weight tester.

Last Answer : Explanation- The handle is fully drawn out and the oil is allowed to enter in the cylinder (i.e. gauge and piston). A known accurate weight is placed on the platform. The area of ... reduce the friction between the piston and cylinder, the piston is gradually rotated while a reading being taken

Description : Illustrate the procedure of Ground water recharge pit with neat sketch.

Last Answer : Procedure: 1) It is adopted for buildings having roof area up to 100 sq m. recharge pit of any shape is constructed generally 1 - 2 m wide and 2 - 3 m deep. 2) The pit is filled with ... water in to sub-soil. 5) This method is suitable where permeable strata is available at shallow depth

Description : Write the procedure of construction of WBM road with neat sketch showing various components

Last Answer : Construction Procedure:  a) Preparation of Foundation: The foundation for receiving the layer of WBM may be either the sub-grade or sub-base or base course. The depressions and pot holes on the existing road ... water and rolled. No traffic is allowed till WBM layer sets and dries out. 

Description : With neat sketch, write the procedure of measurement of fore bearing with compass.

Last Answer : For measuring fore bearing of line AB, i) Place the compass over station A, center and level it.  ii) Looking through eye slit towards object vane, bisect the ranging rod at station ... which coincides with horse hair at observer end. The observed reading is the fore bearing of line AB