Write stepwise procedure for converting raw material into finished product.

1 Answer

Answer :

Planning of process from raw material to finished product:-

Steps involved in process planning:

1. Analysis of Product and its specification: - During analysis, following parameter should be considered,

a. Drawing and specification of product.

b. Quality of product.

c. Number of parts/components per product.

2. Make or buy decision: Process planning determines what parts are to be manufactured in the firm itself and what parts are to be purchased from outside.

3. Selection of basic manufacturing process: Once the decision is taken what parts to be manufactured, next step is to decide the manufacturing process. The alternative methods are compared and most practical and economical method is decided by calculating and comparing total cost for two or more feasible method.

4. Determining sequence of operation: Once the best manufacturing process is selected, sequence of operation to be performed on each component is determined.

5. Combine the operations: If possible practically, combine as many operations as possible. As it is economical to combine the operations.

6. Selection of machine tools/equipments: Selection of correct machine is closely related to the process of manufacture. While selecting the machine, following factors should be considered:

a. Size and form of work piece.

b. Accuracy and surface finish required.

c. Quantity required.

7. Inspection: At this stage, inspection devices and stages are decided.

8. Requirement of tools, gauges etc.: To determine and order the tools and gauges required to manufacture the part.

9. Labour requirement: Kind/Skill of labour required to do the job.

10. Time standards: To determine the time standards for performance of the job and fixing the rates of payment.

11. Prepare the route sheet and operation sheet.


Related questions

Description : Explain the various steps for planning a process for product from raw material to finished product in an industry.

Last Answer : 1. Analysis of Product and its specification: - During analysis, following parameter should be considereda. Drawing and specification of product. b. Quality of product. c. Number of parts/components per ... and fixing the rates of payment. 11. Prepare the route sheet and operation sheet.

Description : List down eight important steps for planning a process for a product from raw material to finished product in an industry.

Last Answer : Steps for Process Planning for a Product from Raw Material to Finished Product: Specific activities involved in planning a process for a product from raw material to finished product in an ... gauges required for inspection. This operation described in detail, in later section of this chapter.

Description : State basic procedure for carrying out method study.

Last Answer : The steps followed for method study are as follows: 1. Select: Select the job to be considered for method study based on economical, technical and human consideration and define the objectives ... as a standard practice. 7. Maintain: Maintain that standard practice by regular routine checks.

Description : Define routing. Explain in short various steps in routing procedure.

Last Answer : Definition of routing: - Routing is defined as the decision to follow the path and sequence of operations to be performed on the work piece from one machine to another. Following steps are ... prepared. - Route sheet shows the sequence of operations, their department, machines and tool used.

Description : Explain the procedure of measurement of productivity? Discuss any two techniques.

Last Answer : Productivity Measurement: [1] Measurement plays an important role in management of productivity. It helps to determine organization is progressing well or not. It also provides information on how effectively and ... give us the productivity of an entire organization or even a nation.

Description : Write any one application for each of following material handling equipments: (i) Bucket Conveyors (ii) Fork Lift Trucks (iii) Jib Crane (iv) Gravity Chutes

Last Answer : Applications of MH Equipments:

Description : List four material handling devices and also write one application of each.

Last Answer : 1. Fork lift truck - To move and stack material at height. 2. Cranes - To lift heavy stones at height. 3. Conveyor - To move cement bags at a short and fixed distance. 4. Pipelines - To move chemical from store to storage tank. 

Description : State the Thevenin’s theorem. Also write stepwise procedure for applying Thevenin’s theorem to simple circuits.

Last Answer : Thevenin's Theorem: Any two terminal circuit having number of linear impedance and sources (voltage, current, dependent, independent) can be represented by a simple equivalent circuit consisting of a single voltage ... 's equivalent circuit: Step V: Determination of Load current:

Description : Classify industries on the basis of : (a) Capital investment, (b) Ownership (c) Bulk and weight of raw material and (d) Finished product -SST 10th

Last Answer : Industries can be classified into the following categories : (a) On the basis of capital investment : (i) Large scale industries make large capital investment of more than one crore of ... light raw materials and their finished products are also light, eg. electrical industries producing bulbs.

Description : On the basis of character of raw material and finished product, iron and steel industry belongs to which category? -SST 10th

Last Answer : Heavy industry.

Description : ____ grippers are used to transfer ferrous material. (A) Magnetic grippers (B) Mechanical grippers (C) Adhesive grippers (D) Vacuum cup grippers

Last Answer : A

Description : Explain the need and importance of material handling devices in an industry. 

Last Answer : Need of material handling devices: Material handling is an important activity in the industries. A large part of indirect labour employed in an industry is engaged in handling of materials. It has ... material handling and provides proper working conditions. 6. Reduced in process inventory.

Description : Prepare operation process sheet and decide sequence of operation for the component shown in Figure No. 1. Assume suitable material and cutting conditions.

Last Answer : Operation Sheet with correct sequence of operations for the above given component by assuming suitable material and cutting conditions is as shown in below table;

Description : Enlist any four factors which affect selection of material handling system. Explain which type of material handling system is suitable for: (i) Unloading two wheelers from truck ii) Stacking of pallets in store racks.

Last Answer : Four Factors affecting Selection of Material Handling System: [1] Adaptability and Flexibility [2] Type of Material to be handled [3] Type of Layout [4] Type of Production [5] ... [11] Cost of installation and handling Suitable Material Handling Devices for Following Activities:

Description : Name different types of material handling equipments used in industry. Explain any one with neat sketch.

Last Answer : Types of material handling devices 1.Trucks : i) Power lift : a. Fork lift b. elevating platform ii) Hand Lift. iii) Porters trolley. 2.Tractors and trailers 3. Hoist and cranes: ... bands can also be used. 5. Speed of belt normally ranges from 1 m/s to 70 m/s.

Description : Suggest appropriate material handling device for 

Last Answer : (i) Transporting coal in thermal power plant - Belt Conveyor. (ii) Transporting cotton in ginning unit - Trucks, Tractors and trailers. (iii) Transporting pallets - Fork lift truck, hand lift ... packed boxes of biscuits within industry - Hand wheel barrow or hand trolley or Porter's trolley.

Description : Name the material handling devices for following activities:

Last Answer : (i) To move and stack material at height:- Fork lift truck (ii) To lift heavy stones at height:- Cranes (iii) To move cement bags at a short and fixed distance:- Conveyor (iv) To move chemical from store to storage tank:- Pipelines

Description : Describe various principles of material handling in details.

Last Answer : A) Related to planning. - All activity should be planned. - Plan a system which include all the handling activities & co-coordinating the operations. - Simplification ... Performance efficiency principle: Determine efficiency of material handling performance in terms of expense per unit handled.

Description : Explain with neat sketch any two material handling devices used in mass production.

Last Answer : 1.Roller conveyors may be gravity aided or powered and are employed for transporting products having flat bottoms. Bigger jobs can be handled as they are, whereas small items are put in boxes, tins ... and unloading of the products.   4.Screw Conveyor, Pneumatic Conveyor, Elevated Conveyor . 

Description : Define productivity index. State it with respect to labour, material and machine.

Last Answer : Productivity Index:- It is used to compare the productivity during the current year with the productivity during the base year. Base year is any year which the company users or comparative study. ... key actor in economic production/operation..It is Number o units produced per cost o material.

Description : Explain any six factors on which selection of material handling device depends.

Last Answer : Factors Affecting the selection of Materials Handling Devices/Equipment: [1] Adaptability: The load carrying and movement characteristics of the equipment should fit the materials handling problem. [2] ... The consideration of the cost of the MH Equipment is an obvious factor in its selection

Description : Explain the principles considered for selection of material handling equipment.

Last Answer : 1. Planning :All activity should be planned. Plan a system which include all the handling activities & co-coordinating the operations. 2. Simplification principle: Reduced or eliminate ... 10. Maintenance principle: Plan for preventing maintenance and schedule repair of all handling equipment

Description : Describe stepwise construction procedure for water bound macadam roads.

Last Answer : The construction procedure of W.B.M. road is discussed below: 1. Preparation of subgrade : The subgrade is prepared to the required grade and camber. 2. Preparation of the base course : After preparing ... by rolling or tamping. 5. Open to traffic : After drying, the road is opened to traffic.

Description : Describe stepwise construction procedure of cement concrete road by continuous bay method.

Last Answer : Continuous Construction method: In this method of construction, all the bays or slabs (ABCD) of strip are constructed continuously without any break as shown in figure. In this method, construction joints are, ... be diverted on the other half of the road. This method is also very rapid.

Description : Describe stepwise procedure to prepare the layout of a small building using total station.

Last Answer : Layout of small building by using total station: 1. On the plan supplied by an architect, number the column serially from left to right and top to bottom starting from top left ... of setting out by comparing the diagonal distance between the extreme column centres to their calculated values.

Description : Describe the stepwise procedure for painting of used vehicle.

Last Answer : Painting procedure for used vehicle: Remove dent using denting tools and dent removing procedure. Preparing the Surface: Begin by sanding the car's surface with a dual action sander and 120 grit sandpaper ... the car. Use circular and back and forth motions until the entire car has been polished.

Description : Explain the stepwise procedure of estimating volume of reservoir from any contour map.

Last Answer : Reservoirs are made for water supply and for power or irrigation projects. A contour map is very useful to study the possible location of a dam and the volume of water to be confined. All ... reservoir can be estimated by the application of either the trapezoidal or the prismoidal formula.

Description : Explain with neat sketch stepwise procedure to determine bulk density by sand replacement method.

Last Answer : i) A flat area, approximately 450sq.mm of the soil to be tested should be exposed and trimmed down to a level surface, preferably with the aid of the scraper tool. ii) The metal tray with a ... gram. These measurements should be repeated at least thrice and the mean weight (W3) taken.    

Description : Define specific gravity of soil. Explain the stepwise procedure of determination of specific gravity of soil by pycnometer. 

Last Answer : Specific Gravity: It is ratio of unit weight in air of a given volume of soil solids at a specific temperature to unit weight in air of an equal volume of distilled water at same temperature. ... Repeat all above steps two more times to calculate average specific gravity of given soil sample.

Description : Explain stepwise the “Detailed energy audit” procedure.

Last Answer : A) Start up meeting: For this programme, we proceed with this meeting. If then continue us until implementation of energy saving measures. B) Analysis of energy used: Identify where ... are considered, the analysis of energy loss and measurement of insulation level is also considered.

Description : What is pressure calibration? State stepwise procedure to test the accuracy of pressure gauge with dead weight tester.

Last Answer : Explanation- The handle is fully drawn out and the oil is allowed to enter in the cylinder (i.e. gauge and piston). A known accurate weight is placed on the platform. The area of ... reduce the friction between the piston and cylinder, the piston is gradually rotated while a reading being taken

Description : Differentiate between product layout and process layout on the basis of 1) Initial investment cost. 2) Cycle Time. 3) Types of machines used. 4) Skill of labour required. 5) Inventory level. 6) Arrangement of machine. 

Last Answer : Parameter Product layout Process layout 1) Initial investment cost. It requires higher initial investment. Less initial investment 2) Cycle Time. Less cycle time for ... similar operation are grouped together to make a section, like lathe section, milling section etc.

Description : State types of plant layouts. Describe product layout with neat sketch.

Last Answer : Types of plant layout: 1. Product or line layout 2. Process or functional layout 3. Fixed or static layout 4. Combination layout. Product layout: 1. This layout is ... line without back-tracking or cross-movements and finally the end product leaves from the other end of the line.

Description : Explain in brief product and process type layout

Last Answer : Product Layout:- It is also known as line layout. It implies that various operations on raw materials are performed in a sequence and the machines are placed along the product flow line i.e. machines are ... lathes will be at one place, all milling machines will be at one place etc

Description : Explain product layout with a neat sketch. 

Last Answer : Product layout  1. This layout is also called flow-line layout, line layout or production line layout. In this layout, the machines, equipment and work centers are arranged in a straight or ... the other end of the line. 4. Examples are automobile assembly lines, bottling plant and so on

Description : Enlist any four basic components used in robotics systems also write their functions.

Last Answer : Basic components used in robotics system with their functions: 1. Arm: The arm is the part of the robot that positions the end effectors and sensors to do their pre-programmed task. 2. End-effectors ... 6. Drive: The drive is the engine or motor that moves the links into their designated positions.

Description : Draw the symbols and write color code of any eight therbligs

Last Answer : Draw the symbols and write color code of any eight therbligs

Description : From the economic system's point of view, the role of marketing intermediaries is to transform: A. raw products into finished products. B. consumer needs into producer needs. C. ... product desires. D. assortments of products made by producers into the assortments wanted by consumers.

Last Answer : D. assortments of products made by producers into the assortments wanted by consumers.

Description : The system that’s used colonies as a source of raw material and a market for finished goods is called?

Last Answer : Mercantilism

Description : Tell Us Do You Apply The Above Practices To All Parts Of Your Inventory (finished Goods, Raw Material, Works In Process And Spare Parts) And In All Organizational Entities?

Last Answer : One of the most common mistakes made by supply organizations is looking at only a small subset of all inventory-the finished goods sitting in major warehouses-even though raw materials, works ... better prioritize ways to reduce inventories. And all the inventory techniques we've discussed apply.

Description : ___________ occupies the central place in business. A. People. B. Raw material. C. Labour. D. Finished goods.

Last Answer : B. Raw material.

Description : Which of the following statement is true? (a) Value added = total sales + closing stock of finished goods - opening stock of finished goods - total expenditure on raw material - intermediate ... stock of finished goods and semi finished goods - total expenditure on raw material - intermediate goods.

Last Answer : (d) Value added = total sales + closing stock of finished goods and semi finished goods – opening stock of finished goods and semi finished goods – total expenditure on raw material – intermediate goods.

Description : Write the procedure of converting a given current source into voltage source.

Last Answer : Conversion of current source into equivalent voltage source:  Let IS be the practical current source magnitude and   ZI be the internal parallel impedance.   VS be the equivalent practical voltage source magnitude and   ZV be the internal series impedance of the voltage source.

Description : Gross National Product means - (1) gross value of finished goods (2) money values of the total national production for any given period (3) gross value of raw materials and semifinished products (4) money value of inputs and outputs

Last Answer : (2) money values of the total national production for any given period Explanation: Gross national product (GNP) is the market/monetary value of all products and services produced in one year by labour and property supplied by the residents of a country.

Description : Gross National Product means (1) gross value of finished goods (2) money values of the total national production for any given period (3) gross value of raw materials and semi-finished products (4) money value of inputs and outputs

Last Answer : money values of the total national production for any given period

Description : From which of the following is robot programming language. (A) VAL (B) AML (C) ABD (D) Both (A) & (B)

Last Answer : D

Description : ____ grippers are used to pick up light weight materials such as paper,cloth etc. (A) Mechanical grippers (B) Adhesive grippers (C) Vacuum cup grippers (D) Magnetic grippers

Last Answer : B

Description : From which of the following is the type of robot. (A) Point to point robots (B) Continue path robot (C) Jointed arm robots (D) All of the above

Last Answer : D

Description : Grippers are used to_____. (A) Hold the objects (B) Sense the objects (C) Move the objects (D) Both (A) & (C)

Last Answer : D

Description : The capacity of robot to carry load is known as_____. (A) Load carrying capacity (B) Work envelope (C) Maximum reach (D) None of the above

Last Answer : A