Lowest level of staff/supervisor competent of Renewal of fastenings not requiring lifting in  LWR/CWR.
a. PWS
b. Gangmate
c. Keyman*
d. Gangman

1 Answer

Answer :

c. Keyman

Related questions

Description : Lowest level of staff/supervisor competent for Renewal/recoupment of fastenings requiring lifting in LWR/CWR. a. PWS b. Gangmate* c. Keyman d. Gangman

Last Answer : b. Gangmate*

Description : Lowest level of staff/supervisor competent for packing or renewal of single isolated sleeper not requiring lifting or slewing of track in LWR/CWR. a. PWI b. Keyman c. Gangmate* d. PWS

Last Answer : c. Gangmate*

Description : Lowest level of staff/supervisor competent for Lifting/Lowering of track in LWR/CWR. a. Keyman. b. Gangmate. c. PWI. d. PWS.*

Last Answer : d. PWS.*

Description : Lowest level of staff/supervisor competent for passing of first train after buckling in LWR/CWR. a. PWI* b. PWS c. Gangmate d. Keyman

Last Answer : a. PWI*

Description : Lowest level of staff/supervisor competent for all operations regarding distressing in LWR/CWR. a. PWI* b. PWS c. Gangmate d. Keyman

Last Answer : a. PWI*

Description : Lowest level of staff/supervisor competent for Organising Hot weather patrolling during summer months in LWR/CWR. a. Gangmate b. PWI* c. Keyman d. PWS

Last Answer : b. PWI*

Description : Lowest level of staff/supervisor competent for TTM tamping operation in LWR/CWR. a. Gang Mate b. PWS c. PWI* d. Keyman.

Last Answer : c. PWI*

Description : In LWR track on BG a) Level crossing should be separated by providing SEJs b) Level crossing cannot be provided in LWR. c) Level crossing should not fall within the breathing length of LWR* d) Level crossing should be laid with rail free fastenings.

Last Answer : c) Level crossing should not fall within the breathing length of LWR*

Description : Min. authority to be Incharge of lorry. (a) Keyman (b) Mate (c) PWS* (d) none of these (19) UCC is abbreviated for

Last Answer : (c) PWS*

Description : In case of LWR track, full ballast section as specified in LWR Manual should be provided up to ……….. from the bridge abutment. a) 200 m b) 50 m c) 300 m d) 100 m*

Last Answer : d) 100 m

Description : What do you mean by LWR a. Long welded Rail* b. Long weld able Rail c. Linear welded rail d. None of above.

Last Answer : a. Long welded Rail*

Description : When proposed depth of construction of a bridge is more than the existing depth of construction in a bridge work, the existing rail level requires a) Lowering b) Lifting* c) Slewing d) None

Last Answer : b) Lifting*

Description : Renewal of loose rivet shall be taken up in end bearing stiffener when the % of hammer loose rivet is

Last Answer : 30%

Description : Renewal of slack rivets should be taken up in steel girder bridges: a) All rivets which are hand loose or which have lost 50% of their head by corrosion. b) All hammer loose rivets where corrosion has set ... . c) In end stiffeners when the percentage of hammer loose rivets is >30% d) All the above*

Last Answer : d) All the above*

Description : Minimum speed restriction to be imposed for Track renewal is:- (a) Stop dead & 10 Kmph (b) 10 Kmph (c) 15 Kmph (d) 20 Kmph*

Last Answer : (d) 20 Kmph*

Description : What is the full form of PQRS used for Track renewal works. a. Plasser quick Relaying system* b. Please quick return services c. Poor Quality renewal system d. None of above

Last Answer : a. Plasser quick Relaying system*

Description : When as small area of girder bridge should be painted when requiring immediate painting; known as a) patch painting* b) periodical through painting c) Any of the above d) None of the above

Last Answer : a) patch painting*

Description : Weather date of welding is marked on weld? (i) Yes (ii) As decided by the site supervisor (iii) No* (iv) None of the above

Last Answer : (iii) No*

Description : Thickness of Lining/Charge is kept? (i) 20 mm. (ii) 25 mm* (iii) 30 mm (iv) As decided by the site supervisor

Last Answer : (ii) 25 mm*

Description : Which gauge is used to measure the height of rail at the time of aligning of rails for AT welding? (i) Height gauge.* (ii) Vertical gauge (iii) Horizontal gauge (iv) As decided by site supervisor

Last Answer : (iv) As decided by site supervisor

Description : Weather traffic block is required for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition

Last Answer : (i) Yes.

Description : Weather protection of track is required during block for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition

Last Answer : (i) Yes.*

Description : How much rail ends are cleaned with Kerosene Oil and steel wire brush? (i) Minimum 100 mm both side (ii) Minimum 50 mm both side.* (iii) No need (iv) As decided by site supervisor

Last Answer : (ii) Minimum 50 mm both side.*

Description : Do a hand driven lifting equipment need certification from competent person under article 29 of Factories Act? 

Last Answer : Section 29 of the Factories Act deals with lifting machines and lifting tackles which are defined under explanation. In our opinion hand driven lifting equipment does not require certification.

Description : Individual CPAs, Firms or Partnerships of CPAs, including partners and staff members thereof shall register with the BOA and the PRC. If the accreditation of Velasco and Co., CPAs, was renewed on September 30, ... . September 30, 2010 b. September 30, 2011 c. December 31, 2010 d. December 31, 2011

Last Answer : September 30, 2011

Description : What is the most critical aspect in developing a project plan that meets project  specifications within the timeframe and at the lowest costs? Select one: a. Assessing risk management b ... business partners e. Developing a project execution plan that matches the complexity level of the project

Last Answer : e. Developing a project execution plan that matches the complexity level of the project

Description : The following instrument is used to set out a right angle (a) Cross staff (b) Optical staff (c) Prism square (d) None of the above (e) All the above*

Last Answer : e) All the above*

Description : Payment to bridge staff on the section will be made by the pay clerk in the presence of a) SSE/SE/JE/ P.Way b) SSE/SE/JE/ Br.* c) SSE/SE/JE/ Works d) Office clerk

Last Answer : b) SSE/SE/JE/ Br.*

Description : You are a supervisor at a health clinic, and two of your staff members are in a disagreement over their duties. What is the first step you should take in order to help them resolve their conflict?

Last Answer : Consider your company's code of conduct and whether the conflict violates it in any way.

Description : Enlist and draw various fixtures and fastenings for doors and windows. 

Last Answer : Types of Fixtures and Fastenings for Doors and Windows Hinges Hinge is fixture which helps the door to rotate freely along its axis. There are so many types of hinges are there which are as ... them are padlock, mortise lock, rim lock, cupboard lock and lever handle lock etc.

Description : HSK, an LLP has taken keyman insurance policy on the life of its managing partner. The policy got matured on 13th September 2017 and an amount of rupees 75 lakhs was paid by the insurers to the Managing partner ... c. rupees 75 lakh is taxable d. rupee 25 lakh is exempt and Rs 50 lakh is taxable

Last Answer : c. rupees 75 lakh is taxable

Description : Raman & Co., a Partnership firm, received Rs.5 lakh from Insurance Company under Keyman Insurance Policy consequent to demise of Partner Pramod. The amount of premium of Rs.230000 paid earlier was claimed as ... ) b) Fully taxable as Income c) Rs.270000 is taxable d) Rs.230000 is taxable

Last Answer : d) Rs.230000 is taxable

Description : The upper safe noise level for machine operator is : a. 85db b. 100db c. 110db d. 115db

Last Answer : a. 85db

Description : In a precision planter the height of seed drop: A. Should be as close to be ground level as is possible. B. Should be at least 1 m from the ground level. C. Is not a factor to be considered? D. None of These

Last Answer : A. Should be as close to be ground level as is possible.

Description : Norms for No. of seats at recommended level at Cat. E stn. is (a) 0.4 Ndb (b) 0.4 Nds* (c) 0.4 Nmax (d) 100 on each P.F.

Last Answer : (b) 0.4 Nds*

Description : Norms for No. of seats at recommended level at Cat. D stn. is (a) 0.4 Ndb (b) 0.4 Nds* (c) 0.4 Nmax (d) 100 on each P.F.

Last Answer : (b) 0.4 Nds*

Description : Norms for No. of seats at recommended level at Cat. C stn. is (a) 0.4 Ndb (b) 0.4 Nds* (c) 0.4 Nmax (d) 100 on each P.F.

Last Answer : (b) 0.4 Nds*

Description : Norms for No. of seats at recommended level at Cat. B stn. is (a) 0.4 Ndb * (b) 0.4 Nds (c) 0.4 Nmax (d) 100 on each P.F.

Last Answer : (a) 0.4 Ndb

Description : Norms for No. of seats at recommended level at Cat. A stn. is (a) 0.4 Ndb* (b) 0.4 Nds (c) 0.4 Nmax (d) 100 on each P.F.

Last Answer : (a) 0.4 Ndb*

Description : Height of Low level platform for passengers for BG is --- high (a) 0.455 m* (b) 0.560 m (c) 0.650 m (d) 0.760 m

Last Answer : (a) 0.455 m*

Description : Height of high level platform for passengers for BG is --- high (a) 0.455 m (b) 0.560 m (c) 0.650 m (d) 0.760 m*

Last Answer : (d) 0.760 m*

Description : Height of platform of a flag station in cutting above rail level is (a) Same height as Rail level (b) 305 mm above rail level (c) 455 mm above rail level (d) 840mm above rail level*

Last Answer : (d) 840mm above rail level*

Description : Number of taps on platform as per norms for recommended level of facilities (a) One for every coach (b) One for alternate coach* (c) One every 200 metres distance (d) At the discretion of DRM

Last Answer : (b) One for alternate coach*

Description : Urinals & Latrines for A & B stations as norms for recommended level of facilities for railway station (a) Ndb/500 (b) Ndb/300 (c) Ndb/200* (d) None of the above

Last Answer : (c) Ndb/200*

Description : For ‘B’ category stations as per minimum essential facility it is necessary to provide (a) High level platform (b) Medium level platform* (c) Rail level platform (d) All the above

Last Answer : (b) Medium level platform*