Description : Lowest level of staff/supervisor competent for Renewal/recoupment of fastenings requiring lifting in LWR/CWR. a. PWS b. Gangmate* c. Keyman d. Gangman
Last Answer : b. Gangmate*
Description : Lowest level of staff/supervisor competent of Renewal of fastenings not requiring lifting in LWR/CWR. a. PWS b. Gangmate c. Keyman* d. Gangman
Last Answer : c. Keyman
Description : Lowest level of staff/supervisor competent for Lifting/Lowering of track in LWR/CWR. a. Keyman. b. Gangmate. c. PWI. d. PWS.*
Last Answer : d. PWS.*
Description : Lowest level of staff/supervisor competent for passing of first train after buckling in LWR/CWR. a. PWI* b. PWS c. Gangmate d. Keyman
Last Answer : a. PWI*
Description : Lowest level of staff/supervisor competent for all operations regarding distressing in LWR/CWR. a. PWI* b. PWS c. Gangmate d. Keyman
Description : Lowest level of staff/supervisor competent for Organising Hot weather patrolling during summer months in LWR/CWR. a. Gangmate b. PWI* c. Keyman d. PWS
Last Answer : b. PWI*
Description : Lowest level of staff/supervisor competent for TTM tamping operation in LWR/CWR. a. Gang Mate b. PWS c. PWI* d. Keyman.
Last Answer : c. PWI*
Description : When proposed depth of construction of a bridge is more than the existing depth of construction in a bridge work, the existing rail level requires a) Lowering b) Lifting* c) Slewing d) None
Last Answer : b) Lifting*
Description : Min. authority to be Incharge of lorry. (a) Keyman (b) Mate (c) PWS* (d) none of these (19) UCC is abbreviated for
Last Answer : (c) PWS*
Description : In LWR track on BG a) Level crossing should be separated by providing SEJs b) Level crossing cannot be provided in LWR. c) Level crossing should not fall within the breathing length of LWR* d) Level crossing should be laid with rail free fastenings.
Last Answer : c) Level crossing should not fall within the breathing length of LWR*
Description : In case of LWR track, full ballast section as specified in LWR Manual should be provided up to ……….. from the bridge abutment. a) 200 m b) 50 m c) 300 m d) 100 m*
Last Answer : d) 100 m
Description : 1. Which of the statements with regard to formation is correct (1) One of the Functions of the formation is to facilitate drainage (2) Width of bank for double railway line is 12.155 meters (3) Width of cutting for double railway track is 11. ... a) 2, 3, 5 b) 3, 4, 5* c) 2, 3, 4 d) 2, 4, 5
Last Answer : b) 3, 4, 5*
Description : In M+7 sleeper density, how many sleepers are there in a km Track. a. 1660 nos b. 1540 nos.* c. 1310 nos. d. 1440 nos.
Last Answer : b. 1540 nos
Description : Minimum speed restriction to be imposed for Track renewal is:- (a) Stop dead & 10 Kmph (b) 10 Kmph (c) 15 Kmph (d) 20 Kmph*
Last Answer : (d) 20 Kmph*
Description : What is the full form of PQRS used for Track renewal works. a. Plasser quick Relaying system* b. Please quick return services c. Poor Quality renewal system d. None of above
Last Answer : a. Plasser quick Relaying system*
Description : Weather protection of track is required during block for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition
Last Answer : (i) Yes.*
Description : Number of Elastic clips used for one K to BG single line section having 13 length & concrete sleepers of M+7 sleeper density are (a) 5280 (b) 6160* (c) 6250 (d) 6500
Last Answer : (b) 6160*
Description : Number of sleepers required having sleeper density of M+7 for one Km of BG single line is (a) 1360 (b) 1540* (c) 1660 (d) None of the above
Last Answer : (b) 1540*
Description : Curve inspection shall be carried out by Sectional PWI a. Once in three months b. Once in six months c. Once in four months* d. None of above
Last Answer : c. Once in four months
Description : In LWR What is the range of Destressing temperature in 52 kg and heavier section a. Mean rail temp+5 0C to Mean rail temp+10 0C* b. Mean rail temp+5 0C to Mean rail temp+15 0C c. Mean rail temp to Mean rail temp+10 0C d. Mean rail temp+2 0C to Mean rail temp+10 0C
Last Answer : a. Mean rail temp+5 0C to Mean rail temp+10 0C*
Description : What do you mean by LWR a. Long welded Rail* b. Long weld able Rail c. Linear welded rail d. None of above.
Last Answer : a. Long welded Rail*
Description : Minimum length of steel channel sleeper in BG a) 2500mm b) 2440mm* c) 2400mm d) 2600mm
Last Answer : b) 2440mm*
Description : Min. sleeper density in case of semi permanent diversion- (a) (m + 2) (b) (m + 3)* (c) (m + 4) (d) ( m + 7 )
Last Answer : (b) (m + 3)*
Description : Sleeper density for group ‘A’ route with traffic density more than 20 GMT is:- (a) 1560 sleepers/ Km. (b) 1660 sleepers/ Km.* (c) 1540 sleepers/ Km. (d) 1340 sleepers/ Km.
Last Answer : (b) 1660 sleepers/ Km.*
Description : Minimum depth of ballast cushion below the bottom of sleeper at the rail seat on BG group A route should be :- (a) 350 mm. (b) 250 mm. (c) 300 mm.* (d) 325 mm.
Last Answer : (c) 300 mm.*
Description : “Composite sleeper index” is employed to determine a) sleeper density requirement b) number of fixtures required for a particular type of sleeper c) durability of sleeper d) mechanical strength of wooden sleepers and thereby gives its suitability as to be used as li sleepers.*
Last Answer : d) mechanical strength of wooden sleepers and thereby gives its suitability as to be used as li sleepers.*
Description : Renewal of loose rivet shall be taken up in end bearing stiffener when the % of hammer loose rivet is
Last Answer : 30%
Description : Renewal of slack rivets should be taken up in steel girder bridges: a) All rivets which are hand loose or which have lost 50% of their head by corrosion. b) All hammer loose rivets where corrosion has set ... . c) In end stiffeners when the percentage of hammer loose rivets is >30% d) All the above*
Last Answer : d) All the above*
Description : When as small area of girder bridge should be painted when requiring immediate painting; known as a) patch painting* b) periodical through painting c) Any of the above d) None of the above
Last Answer : a) patch painting*
Description : Weather date of welding is marked on weld? (i) Yes (ii) As decided by the site supervisor (iii) No* (iv) None of the above
Last Answer : (iii) No*
Description : Thickness of Lining/Charge is kept? (i) 20 mm. (ii) 25 mm* (iii) 30 mm (iv) As decided by the site supervisor
Last Answer : (ii) 25 mm*
Description : Which gauge is used to measure the height of rail at the time of aligning of rails for AT welding? (i) Height gauge.* (ii) Vertical gauge (iii) Horizontal gauge (iv) As decided by site supervisor
Last Answer : (iv) As decided by site supervisor
Description : Weather traffic block is required for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition
Last Answer : (i) Yes.
Description : How much rail ends are cleaned with Kerosene Oil and steel wire brush? (i) Minimum 100 mm both side (ii) Minimum 50 mm both side.* (iii) No need (iv) As decided by site supervisor
Last Answer : (ii) Minimum 50 mm both side.*
Description : Life of Portion mainly depend upon? (i) Quality of packing (ii) Storage condition (iii) Quality of packing and storage condition.* (iv) Ingredients of portions
Last Answer : (iii) Quality of packing and storage condition.*
Description : In case of a curved track on electrified, double line, BG section a) Duty hut cannot be provided for a level crossing. b) Duty hut should be on the inside of the curve. c) Duty hut should be on the outside of the curve.* d) Duty hut can be provided on any side of the curve.
Last Answer : c) Duty hut should be on the outside of the curve.*
Description : Stop boards on either side of approaches of all unmanned level crossings shall be provided at -------------from the centre line of nearest track. a) 3meters b) 5 meters* c) 6 meters d) 10 meters
Last Answer : b) 5 meters*
Description : On Broad gauge tracks whistle indicator shall be provided at a distance of ---------- from level crossing along the track a) 400 meters b) 600 meters* c) 350 meters d) 500 meters
Last Answer : b) 600 meters*
Description : On an unmanned level crossing stop board should be provided at a distance of --------- from the centre of nearest track a) 5 meters * b) 6 meters c) 3 meters d) 7.5 meters
Last Answer : a) 5 meters
Description : Do a hand driven lifting equipment need certification from competent person under article 29 of Factories Act?
Last Answer : Section 29 of the Factories Act deals with lifting machines and lifting tackles which are defined under explanation. In our opinion hand driven lifting equipment does not require certification.
Description : Individual CPAs, Firms or Partnerships of CPAs, including partners and staff members thereof shall register with the BOA and the PRC. If the accreditation of Velasco and Co., CPAs, was renewed on September 30, ... . September 30, 2010 b. September 30, 2011 c. December 31, 2010 d. December 31, 2011
Last Answer : September 30, 2011
Description : Individual CPAs, Firms or Partnerships of CPAs, including partners and staff members thereof shall register with the BOA and the PRC. Assuming that the application for registration of Sisip and Co., CPAs was ... on Dec. 31, 2007 which is also the last day of renewal of certificate of registration.
Last Answer : The registration will expire on Dec. 31, 2007.
Description : What is the most critical aspect in developing a project plan that meets project specifications within the timeframe and at the lowest costs? Select one: a. Assessing risk management b ... business partners e. Developing a project execution plan that matches the complexity level of the project
Last Answer : e. Developing a project execution plan that matches the complexity level of the project
Description : The following instrument is used to set out a right angle (a) Cross staff (b) Optical staff (c) Prism square (d) None of the above (e) All the above*
Last Answer : e) All the above*
Description : Payment to bridge staff on the section will be made by the pay clerk in the presence of a) SSE/SE/JE/ P.Way b) SSE/SE/JE/ Br.* c) SSE/SE/JE/ Works d) Office clerk
Last Answer : b) SSE/SE/JE/ Br.*
Description : The duties which can be delegated to the Assistant Superintendents a) Opening and distribution of dak, except the dak from the Head of the Circle. b) Issue of reminders, the weekly check of the work of ... d) Grant of casual leave to the staff when the Superintendent is on tour. e) All the above
Last Answer : e) All the above
Description : In pursuing its quality control objectives with respect to assigning personnel to engagements, a public accounting firm may use policies and procedures such as a. Rotating employees from ... the staffing requirements of specific engagements so that enough qualified personnel can be made available
Last Answer : Requiring timely identification of the staffing requirements of specific engagements so that enough qualified personnel can be made available
Description : The Assistant Superintendent will remain at the headquarters when the Superintendent is on tour and will look to the entire supervision of the office and control all the staff of the Divisional Office a ... of loss, fraud, highway robbery etc., till the superintendent arrives. d) All the above
Last Answer : d) All the above
Description : You are a supervisor at a health clinic, and two of your staff members are in a disagreement over their duties. What is the first step you should take in order to help them resolve their conflict?
Last Answer : Consider your company's code of conduct and whether the conflict violates it in any way.
Description : How many detonators are planted during protection of track for welding site ? (i) One (ii) Two (iii) Three* (iv) None of the above
Last Answer : iii) Three*