Lowest level of staff/supervisor competent for Organising Hot weather patrolling during  summer months in LWR/CWR.
a. Gangmate
b. PWI*
c. Keyman
d. PWS

1 Answer

Answer :

b. PWI*

Related questions

Description : Lowest level of staff/supervisor competent for passing of first train after buckling in LWR/CWR. a. PWI* b. PWS c. Gangmate d. Keyman

Last Answer : a. PWI*

Description : Lowest level of staff/supervisor competent for all operations regarding distressing in LWR/CWR. a. PWI* b. PWS c. Gangmate d. Keyman

Last Answer : a. PWI*

Description : Lowest level of staff/supervisor competent for packing or renewal of single isolated sleeper not requiring lifting or slewing of track in LWR/CWR. a. PWI b. Keyman c. Gangmate* d. PWS

Last Answer : c. Gangmate*

Description : Lowest level of staff/supervisor competent for Lifting/Lowering of track in LWR/CWR. a. Keyman. b. Gangmate. c. PWI. d. PWS.*

Last Answer : d. PWS.*

Description : Lowest level of staff/supervisor competent for Renewal/recoupment of fastenings requiring lifting in LWR/CWR. a. PWS b. Gangmate* c. Keyman d. Gangman

Last Answer : b. Gangmate*

Description : Lowest level of staff/supervisor competent of Renewal of fastenings not requiring lifting in LWR/CWR. a. PWS b. Gangmate c. Keyman* d. Gangman

Last Answer : c. Keyman

Description : Lowest level of staff/supervisor competent for TTM tamping operation in LWR/CWR. a. Gang Mate b. PWS c. PWI* d. Keyman.

Last Answer : c. PWI*

Description : Min. authority to be Incharge of lorry. (a) Keyman (b) Mate (c) PWS* (d) none of these (19) UCC is abbreviated for

Last Answer : (c) PWS*

Description : How many green flags are with Patroller during Hot weather patrolling. a. 02 b. 03 c. 01 d. None of above*

Last Answer : d. None of above*

Description : Curve inspection shall be carried out by Sectional PWI a. Once in three months b. Once in six months c. Once in four months* d. None of above

Last Answer : c. Once in four months

Description : Weather protection of track is required during block for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition

Last Answer : (i) Yes.*

Description : In LWR track on BG a) Level crossing should be separated by providing SEJs b) Level crossing cannot be provided in LWR. c) Level crossing should not fall within the breathing length of LWR* d) Level crossing should be laid with rail free fastenings.

Last Answer : c) Level crossing should not fall within the breathing length of LWR*

Description : Weather date of welding is marked on weld? (i) Yes (ii) As decided by the site supervisor (iii) No* (iv) None of the above

Last Answer : (iii) No*

Description : Weather traffic block is required for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition

Last Answer : (i) Yes.

Description : In case of LWR track, full ballast section as specified in LWR Manual should be provided up to ……….. from the bridge abutment. a) 200 m b) 50 m c) 300 m d) 100 m*

Last Answer : d) 100 m

Description : What do you mean by LWR a. Long welded Rail* b. Long weld able Rail c. Linear welded rail d. None of above.

Last Answer : a. Long welded Rail*

Description : Thickness of Lining/Charge is kept? (i) 20 mm. (ii) 25 mm* (iii) 30 mm (iv) As decided by the site supervisor

Last Answer : (ii) 25 mm*

Description : Which gauge is used to measure the height of rail at the time of aligning of rails for AT welding? (i) Height gauge.* (ii) Vertical gauge (iii) Horizontal gauge (iv) As decided by site supervisor

Last Answer : (iv) As decided by site supervisor

Description : How much rail ends are cleaned with Kerosene Oil and steel wire brush? (i) Minimum 100 mm both side (ii) Minimum 50 mm both side.* (iii) No need (iv) As decided by site supervisor

Last Answer : (ii) Minimum 50 mm both side.*

Description : The Assistant Divisional Engineer should inspect the equipment at every manned level crossing on the subdivision once in a) 2 months b) 3 months c) 4 months d) 6 months*

Last Answer : d) 6 months

Description : The following instrument is used to set out a right angle (a) Cross staff (b) Optical staff (c) Prism square (d) None of the above (e) All the above*

Last Answer : e) All the above*

Description : Payment to bridge staff on the section will be made by the pay clerk in the presence of a) SSE/SE/JE/ P.Way b) SSE/SE/JE/ Br.* c) SSE/SE/JE/ Works d) Office clerk

Last Answer : b) SSE/SE/JE/ Br.*

Description : Which of the following is the area of lowest pressure over Indian subcontinent during the hot dry weather season? (1) RannofKachchh (2) Rajasthan (3) North-West India (4) Meghalaya

Last Answer : (3) North-West India Explanation: The southwestern summer monsoons occur from June through September. The Thar Desert and adjoining areas of the northern and central Indian sub-continent heats up ... fill this void, the moisture-laden winds from the Indian Ocean rush in to the subcontinent.

Description : You are a supervisor at a health clinic, and two of your staff members are in a disagreement over their duties. What is the first step you should take in order to help them resolve their conflict?

Last Answer : Consider your company's code of conduct and whether the conflict violates it in any way.

Description : Planting in Oro Valley Az for snowbird garden left during hot summer months

Last Answer : Some of those big ones might be protected. I would ask before doing anything. They store water. The natural rain provides the needed water. They don't like to be soaked you can kill them if you water them wrong.

Description : DFWR weld shall be replaced. (i) Within 2 months of detection. (ii) Within 1 year of detection. (iii) Within 3 months of detection.* (iv) after 3 days of detection.

Last Answer : (iii) Within 3 months of detection.*

Description : Sensitivity calibration against temp. variation shall be carried out. (i) At least once in month* (ii) quarterly. (iii) at least once in six months (iv) Any of above.

Last Answer : i) At least once in month*

Description : On Rajdhani routes testing frequency of rail testing for rail section of 60kg with annual GMT 80, will be. (i) 4 months (ii) 1 1⁄2 months (iii) 1 months* (iv) None of above.

Last Answer : (iii) 1 months*

Description : What is the Life of luting sand ? (i) No defined * (ii) 6 months (iii) 9 months

Last Answer : (i) No defined *

Description : What is the Shelf life of mould ? (i) 6 months minimum. (ii) 8 months minimum (iii) 9 months minimum* (iv) 12 months minimum

Last Answer : (iii) 9 months minimum*

Description : What is the validity of Provisional competency certificate? (i) Valid for executing 50 joints or six months whichever is earlier. (ii) Valid for executing 100 joints or six months whichever is earlier.* (iii) Valid for executing 50 joints. (iv) Valid for six months

Last Answer : (ii) Valid for executing 100 joints or six months whichever is earlier.*

Description : Type of competency certificate issued after TW-1 course? (i) Competency for two years (ii) Provisional competency.* (iii) Competency for six months (iv) Competency to do welding independently

Last Answer : (ii) Provisional competency.*

Description : What is the life of portion? (i) 2 years (ii) No specific life.* (ii) 6 months (iv) 1 year

Last Answer : (ii) No specific life.*

Description : Special inspection of distressed bridges Group II shall be carried out by Inspector (Concerned) is a) Once in three months* b) Once in two months c) Once in a month d) Once in six months

Last Answer : a) Once in three months*

Description : Special inspection of distressed bridges shall be carried out by Asst. Engineer is a) Once in three months b) Once in two months* c) Once in a month d) Once in six months

Last Answer : b) Once in two months*

Description : What is the frequency of track recording of the sections having speed more than 110 kmph to 130 kmph a. 4 Months b. 2 Months c. 6 Months d. 3 Months

Last Answer : d. 3 Months

Description : Risers are broken at? (i) cold. * (ii) Hot (iii) After 5 mints (iv) After 3 mints

Last Answer : (i) cold. *

Description : The reduction in the amount on account of commutation shall become operative within -- ------- months after issue of letter by the competent authority a. Five b. Two c. Three

Last Answer : c. Three

Description : Will my snapdragons make it through the hot & humid San Antonio Tx summer weather?

Last Answer : Need Answer

Description : A practice that does not necessarily involve tillage a). Summer ploughing/hot weather cultivation b). Stale seed bed c). Soil solarization d). None

Last Answer : c). Soil solarization

Description : Are you excited to have regular US Army soldiers patrolling US cities starting October 1?

Last Answer : Yeah. Not so much.

Description : what- One eventuality of the new police officers patrolling the highway was an increase in the number of speeding tickets issued?

Last Answer : consequence

Description : ......................................................... and increase the hours of patrolling also. (i) We requested you to depute more policemen for patrolling ( ... for patrolling (iii) We have requested you to depute more policeman for patrolling (iv) We request you to be deputed for patrolling

Last Answer : (ii) We request you to depute more policemen for patrolling

Description : Which option correctly lists the reason that the true home of a tiger is jungle? (a) Tigers get the love of other animals in the jungle. (IV)(b) In cities they are scared of the noises of the ... ) The jungle is tiger s natural habitat. (d) At zoos, they lose their privacy and they feel lonely.

Last Answer : (c) The jungle is tiger‘s natural habitat.

Description : The vivid description of the jungle given in the poem presents the image of (a) Long grass and water body (b) Patrolling car (c) Concrete cell (d) Brilliant stars

Last Answer : (a) Long grass and water body

Description : HSK, an LLP has taken keyman insurance policy on the life of its managing partner. The policy got matured on 13th September 2017 and an amount of rupees 75 lakhs was paid by the insurers to the Managing partner ... c. rupees 75 lakh is taxable d. rupee 25 lakh is exempt and Rs 50 lakh is taxable

Last Answer : c. rupees 75 lakh is taxable

Description : Raman & Co., a Partnership firm, received Rs.5 lakh from Insurance Company under Keyman Insurance Policy consequent to demise of Partner Pramod. The amount of premium of Rs.230000 paid earlier was claimed as ... ) b) Fully taxable as Income c) Rs.270000 is taxable d) Rs.230000 is taxable

Last Answer : d) Rs.230000 is taxable