Description : Lowest level of staff/supervisor competent for passing of first train after buckling in LWR/CWR. a. PWI* b. PWS c. Gangmate d. Keyman
Last Answer : a. PWI*
Description : Lowest level of staff/supervisor competent for all operations regarding distressing in LWR/CWR. a. PWI* b. PWS c. Gangmate d. Keyman
Description : Lowest level of staff/supervisor competent for Organising Hot weather patrolling during summer months in LWR/CWR. a. Gangmate b. PWI* c. Keyman d. PWS
Last Answer : b. PWI*
Description : Lowest level of staff/supervisor competent for packing or renewal of single isolated sleeper not requiring lifting or slewing of track in LWR/CWR. a. PWI b. Keyman c. Gangmate* d. PWS
Last Answer : c. Gangmate*
Description : Lowest level of staff/supervisor competent for Lifting/Lowering of track in LWR/CWR. a. Keyman. b. Gangmate. c. PWI. d. PWS.*
Last Answer : d. PWS.*
Description : Lowest level of staff/supervisor competent for Renewal/recoupment of fastenings requiring lifting in LWR/CWR. a. PWS b. Gangmate* c. Keyman d. Gangman
Last Answer : b. Gangmate*
Description : Lowest level of staff/supervisor competent of Renewal of fastenings not requiring lifting in LWR/CWR. a. PWS b. Gangmate c. Keyman* d. Gangman
Last Answer : c. Keyman
Description : Min. authority to be Incharge of lorry. (a) Keyman (b) Mate (c) PWS* (d) none of these (19) UCC is abbreviated for
Last Answer : (c) PWS*
Description : Frequency of TTM tamping on PSC sleepers track a. 2 years or 100 GMT which ever is earlier* b. 2 years or 150 GMT which ever is earlier c. 1.5 years or 200 GMT which ever is earlier d. 2 years or 175 GMT which ever is earlier
Last Answer : a. 2 years or 100 GMT which ever is earlier*
Description : In LWR track on BG a) Level crossing should be separated by providing SEJs b) Level crossing cannot be provided in LWR. c) Level crossing should not fall within the breathing length of LWR* d) Level crossing should be laid with rail free fastenings.
Last Answer : c) Level crossing should not fall within the breathing length of LWR*
Description : Curve inspection shall be carried out by Sectional PWI a. Once in three months b. Once in six months c. Once in four months* d. None of above
Last Answer : c. Once in four months
Description : In case of LWR track, full ballast section as specified in LWR Manual should be provided up to ……….. from the bridge abutment. a) 200 m b) 50 m c) 300 m d) 100 m*
Last Answer : d) 100 m
Description : In LWR What is the range of Destressing temperature in 52 kg and heavier section a. Mean rail temp+5 0C to Mean rail temp+10 0C* b. Mean rail temp+5 0C to Mean rail temp+15 0C c. Mean rail temp to Mean rail temp+10 0C d. Mean rail temp+2 0C to Mean rail temp+10 0C
Last Answer : a. Mean rail temp+5 0C to Mean rail temp+10 0C*
Description : What do you mean by LWR a. Long welded Rail* b. Long weld able Rail c. Linear welded rail d. None of above.
Last Answer : a. Long welded Rail*
Description : Weather date of welding is marked on weld? (i) Yes (ii) As decided by the site supervisor (iii) No* (iv) None of the above
Last Answer : (iii) No*
Description : Thickness of Lining/Charge is kept? (i) 20 mm. (ii) 25 mm* (iii) 30 mm (iv) As decided by the site supervisor
Last Answer : (ii) 25 mm*
Description : Which gauge is used to measure the height of rail at the time of aligning of rails for AT welding? (i) Height gauge.* (ii) Vertical gauge (iii) Horizontal gauge (iv) As decided by site supervisor
Last Answer : (iv) As decided by site supervisor
Description : Weather traffic block is required for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition
Last Answer : (i) Yes.
Description : Weather protection of track is required during block for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition
Last Answer : (i) Yes.*
Description : How much rail ends are cleaned with Kerosene Oil and steel wire brush? (i) Minimum 100 mm both side (ii) Minimum 50 mm both side.* (iii) No need (iv) As decided by site supervisor
Last Answer : (ii) Minimum 50 mm both side.*
Description : The following instrument is used to set out a right angle (a) Cross staff (b) Optical staff (c) Prism square (d) None of the above (e) All the above*
Last Answer : e) All the above*
Description : Payment to bridge staff on the section will be made by the pay clerk in the presence of a) SSE/SE/JE/ P.Way b) SSE/SE/JE/ Br.* c) SSE/SE/JE/ Works d) Office clerk
Last Answer : b) SSE/SE/JE/ Br.*
Description : The duties which can be delegated to the Assistant Superintendents a) Opening and distribution of dak, except the dak from the Head of the Circle. b) Issue of reminders, the weekly check of the work of ... d) Grant of casual leave to the staff when the Superintendent is on tour. e) All the above
Last Answer : e) All the above
Description : You are a supervisor at a health clinic, and two of your staff members are in a disagreement over their duties. What is the first step you should take in order to help them resolve their conflict?
Last Answer : Consider your company's code of conduct and whether the conflict violates it in any way.
Description : What is the full form of TTM ?
Last Answer : The full form of TTM Tarining Of Tarinees in Management.
Description : The basic action involved in sheep foot rolling is (A) Kneading (B) Pressing (C) Tamping (D) Vibration
Last Answer : (A) Kneading
Description : Pick up the correct statement from the following: (A) The sand in the sand pile is well compacted (B) The sand is kept moist at the time of placing and tamping (C) Sand piles are generally used under column loads (D) All of the above
Last Answer : Answer: Option D
Description : In case of emergency, land can be acquired urgently by operation of special section (a) Section 4 & 6 (b) Section 9 & 17* (c) Section 8 & 10 (d) None of them
Last Answer : (b) Section 9 & 17*
Description : What is the speed restriction to be observed for train passing? (i) Necessary speed restriction shall be observed until the grinding operation is over.* (ii) 30KMPH (iii) 45 KMPH (iv) Not required
Last Answer : (i) Necessary speed restriction shall be observed until the grinding operation is over.*
Description : The adjustment in MB plough for increasing the depth of operation a) Vertical suction b) Horizontal suction c) Gang angle d) Disc angle Ans. a
Last Answer : ans a
Description : The Indian Parliament is competent to enact law on a State subject if – (1) emergency under Article 352 is in operation (2) all the state Assemblies of the country make such a request (3) the President sends such a message to Parliament (4) None of these
Last Answer : (1) emergency under Article 352 is in operation Explanation: When National emergency 7 under article 352 is in force, the Parliament can make laws on the 66 subjects of the State List (which ... governments can make laws). Also, all money bills are referred to the Parliament for its approval.
Description : HSK, an LLP has taken keyman insurance policy on the life of its managing partner. The policy got matured on 13th September 2017 and an amount of rupees 75 lakhs was paid by the insurers to the Managing partner ... c. rupees 75 lakh is taxable d. rupee 25 lakh is exempt and Rs 50 lakh is taxable
Last Answer : c. rupees 75 lakh is taxable
Description : Raman & Co., a Partnership firm, received Rs.5 lakh from Insurance Company under Keyman Insurance Policy consequent to demise of Partner Pramod. The amount of premium of Rs.230000 paid earlier was claimed as ... ) b) Fully taxable as Income c) Rs.270000 is taxable d) Rs.230000 is taxable
Last Answer : d) Rs.230000 is taxable
Description : The upper safe noise level for machine operator is : a. 85db b. 100db c. 110db d. 115db
Last Answer : a. 85db
Description : In a precision planter the height of seed drop: A. Should be as close to be ground level as is possible. B. Should be at least 1 m from the ground level. C. Is not a factor to be considered? D. None of These
Last Answer : A. Should be as close to be ground level as is possible.
Description : Norms for No. of seats at recommended level at Cat. E stn. is (a) 0.4 Ndb (b) 0.4 Nds* (c) 0.4 Nmax (d) 100 on each P.F.
Last Answer : (b) 0.4 Nds*
Description : Norms for No. of seats at recommended level at Cat. D stn. is (a) 0.4 Ndb (b) 0.4 Nds* (c) 0.4 Nmax (d) 100 on each P.F.
Description : Norms for No. of seats at recommended level at Cat. C stn. is (a) 0.4 Ndb (b) 0.4 Nds* (c) 0.4 Nmax (d) 100 on each P.F.
Description : Norms for No. of seats at recommended level at Cat. B stn. is (a) 0.4 Ndb * (b) 0.4 Nds (c) 0.4 Nmax (d) 100 on each P.F.
Last Answer : (a) 0.4 Ndb
Description : Norms for No. of seats at recommended level at Cat. A stn. is (a) 0.4 Ndb* (b) 0.4 Nds (c) 0.4 Nmax (d) 100 on each P.F.
Last Answer : (a) 0.4 Ndb*
Description : Height of Low level platform for passengers for BG is --- high (a) 0.455 m* (b) 0.560 m (c) 0.650 m (d) 0.760 m
Last Answer : (a) 0.455 m*
Description : Height of high level platform for passengers for BG is --- high (a) 0.455 m (b) 0.560 m (c) 0.650 m (d) 0.760 m*
Last Answer : (d) 0.760 m*
Description : Height of platform of a flag station in cutting above rail level is (a) Same height as Rail level (b) 305 mm above rail level (c) 455 mm above rail level (d) 840mm above rail level*
Last Answer : (d) 840mm above rail level*
Description : Number of taps on platform as per norms for recommended level of facilities (a) One for every coach (b) One for alternate coach* (c) One every 200 metres distance (d) At the discretion of DRM
Last Answer : (b) One for alternate coach*
Description : Urinals & Latrines for A & B stations as norms for recommended level of facilities for railway station (a) Ndb/500 (b) Ndb/300 (c) Ndb/200* (d) None of the above
Last Answer : (c) Ndb/200*
Description : For ‘B’ category stations as per minimum essential facility it is necessary to provide (a) High level platform (b) Medium level platform* (c) Rail level platform (d) All the above
Last Answer : (b) Medium level platform*
Description : For ‘A’ category stations it is necessary to provide (a) High level platform* (b) Medium level platform (c) Rail level platform (d) All the above
Last Answer : (a) High level platform*
Description : The survey instrument used for reconnaissance survey (a) Theodelite & Dumpty level (b) Prismatic compass & Aneriod barometer* (c) All the above (d) None of them
Last Answer : (b) Prismatic compass & Aneriod barometer*
Description : Which of the instruments is not used in Preliminary survey. (a) Theodelite (b) Tacheometer (c) Dumpy level (d) Plane table (e) None of them*
Last Answer : (e) None of them*
Description : Which of the instruments is not used in Reconnaissance survey. (a) Prismatic compass (b) Dumpy level * (c) Aneroid Barometer (d) Pedometer
Last Answer : (b) Dumpy level *