Lowest level of staff/supervisor competent for all operations regarding distressing in  LWR/CWR.
a. PWI*
b. PWS
c. Gangmate
d. Keyman

1 Answer

Answer :

a. PWI*

Related questions

Description : Lowest level of staff/supervisor competent for passing of first train after buckling in LWR/CWR. a. PWI* b. PWS c. Gangmate d. Keyman

Last Answer : a. PWI*

Description : Lowest level of staff/supervisor competent for Organising Hot weather patrolling during summer months in LWR/CWR. a. Gangmate b. PWI* c. Keyman d. PWS

Last Answer : b. PWI*

Description : Lowest level of staff/supervisor competent for packing or renewal of single isolated sleeper not requiring lifting or slewing of track in LWR/CWR. a. PWI b. Keyman c. Gangmate* d. PWS

Last Answer : c. Gangmate*

Description : Lowest level of staff/supervisor competent for Lifting/Lowering of track in LWR/CWR. a. Keyman. b. Gangmate. c. PWI. d. PWS.*

Last Answer : d. PWS.*

Description : Lowest level of staff/supervisor competent for Renewal/recoupment of fastenings requiring lifting in LWR/CWR. a. PWS b. Gangmate* c. Keyman d. Gangman

Last Answer : b. Gangmate*

Description : Lowest level of staff/supervisor competent of Renewal of fastenings not requiring lifting in LWR/CWR. a. PWS b. Gangmate c. Keyman* d. Gangman

Last Answer : c. Keyman

Description : Lowest level of staff/supervisor competent for TTM tamping operation in LWR/CWR. a. Gang Mate b. PWS c. PWI* d. Keyman.

Last Answer : c. PWI*

Description : Min. authority to be Incharge of lorry. (a) Keyman (b) Mate (c) PWS* (d) none of these (19) UCC is abbreviated for

Last Answer : (c) PWS*

Description : In LWR track on BG a) Level crossing should be separated by providing SEJs b) Level crossing cannot be provided in LWR. c) Level crossing should not fall within the breathing length of LWR* d) Level crossing should be laid with rail free fastenings.

Last Answer : c) Level crossing should not fall within the breathing length of LWR*

Description : Curve inspection shall be carried out by Sectional PWI a. Once in three months b. Once in six months c. Once in four months* d. None of above

Last Answer : c. Once in four months

Description : In case of LWR track, full ballast section as specified in LWR Manual should be provided up to ……….. from the bridge abutment. a) 200 m b) 50 m c) 300 m d) 100 m*

Last Answer : d) 100 m

Description : What do you mean by LWR a. Long welded Rail* b. Long weld able Rail c. Linear welded rail d. None of above.

Last Answer : a. Long welded Rail*

Description : Weather date of welding is marked on weld? (i) Yes (ii) As decided by the site supervisor (iii) No* (iv) None of the above

Last Answer : (iii) No*

Description : Thickness of Lining/Charge is kept? (i) 20 mm. (ii) 25 mm* (iii) 30 mm (iv) As decided by the site supervisor

Last Answer : (ii) 25 mm*

Description : Which gauge is used to measure the height of rail at the time of aligning of rails for AT welding? (i) Height gauge.* (ii) Vertical gauge (iii) Horizontal gauge (iv) As decided by site supervisor

Last Answer : (iv) As decided by site supervisor

Description : Weather traffic block is required for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition

Last Answer : (i) Yes.

Description : Weather protection of track is required during block for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition

Last Answer : (i) Yes.*

Description : How much rail ends are cleaned with Kerosene Oil and steel wire brush? (i) Minimum 100 mm both side (ii) Minimum 50 mm both side.* (iii) No need (iv) As decided by site supervisor

Last Answer : (ii) Minimum 50 mm both side.*

Description : The following instrument is used to set out a right angle (a) Cross staff (b) Optical staff (c) Prism square (d) None of the above (e) All the above*

Last Answer : e) All the above*

Description : Payment to bridge staff on the section will be made by the pay clerk in the presence of a) SSE/SE/JE/ P.Way b) SSE/SE/JE/ Br.* c) SSE/SE/JE/ Works d) Office clerk

Last Answer : b) SSE/SE/JE/ Br.*

Description : You are a supervisor at a health clinic, and two of your staff members are in a disagreement over their duties. What is the first step you should take in order to help them resolve their conflict?

Last Answer : Consider your company's code of conduct and whether the conflict violates it in any way.

Description : Is it a bit distressing to have a "professional" tell you that something is true when it's not?

Last Answer : Yes, the cable TV guys told us we couldn’t watch one show and tape a different show, but I can, because of the way my husband hooked up the inputs. Of course, now the technology has changed, but five years ago, they lied to me.

Description : A patient treated with capsule oxytetracycline 500 mg 6 hourly complained of epigastric pain. Which of the following measures will you recommend to counteract the side effect: A. Take the capsules ... capsules D. None of the above measures is suitable. Change the antibiotic if pain is distressing

Last Answer : D. None of the above measures is suitable. Change the antibiotic if pain is distressing

Description : HSK, an LLP has taken keyman insurance policy on the life of its managing partner. The policy got matured on 13th September 2017 and an amount of rupees 75 lakhs was paid by the insurers to the Managing partner ... c. rupees 75 lakh is taxable d. rupee 25 lakh is exempt and Rs 50 lakh is taxable

Last Answer : c. rupees 75 lakh is taxable

Description : Raman & Co., a Partnership firm, received Rs.5 lakh from Insurance Company under Keyman Insurance Policy consequent to demise of Partner Pramod. The amount of premium of Rs.230000 paid earlier was claimed as ... ) b) Fully taxable as Income c) Rs.270000 is taxable d) Rs.230000 is taxable

Last Answer : d) Rs.230000 is taxable

Description : Which two statements are true about the public cloud model? A. It meets security and auditing requirements for highly regulated industries. B. Resources and infrastructure are managed ... capital expenditures to creating a virtualized and elastic infrastructure within the enterprise data center.

Last Answer : It shifts the bulk of the costs from capital expenditures and IT infrastructure investment to an utility operating expense model.

Description : Which of the following is an example of an area where business ethics apply? A. Conduct of international operations B. Nowhere C. In the personal life of staff D. None of the above

Last Answer : A. Conduct of international operations

Description : The five elements in the management process are (a) plan, direct, update, lead, and supervise (b) accounting/finance, marketing, operations, and management (c) organize, plan, control, staff, and manage (d) plan, lead, organize, manage, and control

Last Answer : (d) plan, lead, organize, manage, and control  

Description : The upper safe noise level for machine operator is : a. 85db b. 100db c. 110db d. 115db

Last Answer : a. 85db

Description : In a precision planter the height of seed drop: A. Should be as close to be ground level as is possible. B. Should be at least 1 m from the ground level. C. Is not a factor to be considered? D. None of These

Last Answer : A. Should be as close to be ground level as is possible.

Description : Norms for No. of seats at recommended level at Cat. E stn. is (a) 0.4 Ndb (b) 0.4 Nds* (c) 0.4 Nmax (d) 100 on each P.F.

Last Answer : (b) 0.4 Nds*

Description : Norms for No. of seats at recommended level at Cat. D stn. is (a) 0.4 Ndb (b) 0.4 Nds* (c) 0.4 Nmax (d) 100 on each P.F.

Last Answer : (b) 0.4 Nds*

Description : Norms for No. of seats at recommended level at Cat. C stn. is (a) 0.4 Ndb (b) 0.4 Nds* (c) 0.4 Nmax (d) 100 on each P.F.

Last Answer : (b) 0.4 Nds*

Description : Norms for No. of seats at recommended level at Cat. B stn. is (a) 0.4 Ndb * (b) 0.4 Nds (c) 0.4 Nmax (d) 100 on each P.F.

Last Answer : (a) 0.4 Ndb

Description : Norms for No. of seats at recommended level at Cat. A stn. is (a) 0.4 Ndb* (b) 0.4 Nds (c) 0.4 Nmax (d) 100 on each P.F.

Last Answer : (a) 0.4 Ndb*

Description : Height of Low level platform for passengers for BG is --- high (a) 0.455 m* (b) 0.560 m (c) 0.650 m (d) 0.760 m

Last Answer : (a) 0.455 m*

Description : Height of high level platform for passengers for BG is --- high (a) 0.455 m (b) 0.560 m (c) 0.650 m (d) 0.760 m*

Last Answer : (d) 0.760 m*

Description : Height of platform of a flag station in cutting above rail level is (a) Same height as Rail level (b) 305 mm above rail level (c) 455 mm above rail level (d) 840mm above rail level*

Last Answer : (d) 840mm above rail level*

Description : Number of taps on platform as per norms for recommended level of facilities (a) One for every coach (b) One for alternate coach* (c) One every 200 metres distance (d) At the discretion of DRM

Last Answer : (b) One for alternate coach*

Description : Urinals & Latrines for A & B stations as norms for recommended level of facilities for railway station (a) Ndb/500 (b) Ndb/300 (c) Ndb/200* (d) None of the above

Last Answer : (c) Ndb/200*

Description : For ‘B’ category stations as per minimum essential facility it is necessary to provide (a) High level platform (b) Medium level platform* (c) Rail level platform (d) All the above

Last Answer : (b) Medium level platform*

Description : For ‘A’ category stations it is necessary to provide (a) High level platform* (b) Medium level platform (c) Rail level platform (d) All the above

Last Answer : (a) High level platform*

Description : The survey instrument used for reconnaissance survey (a) Theodelite & Dumpty level (b) Prismatic compass & Aneriod barometer* (c) All the above (d) None of them

Last Answer : (b) Prismatic compass & Aneriod barometer*

Description : Which of the instruments is not used in Preliminary survey. (a) Theodelite (b) Tacheometer (c) Dumpy level (d) Plane table (e) None of them*

Last Answer : (e) None of them*

Description : Which of the instruments is not used in Reconnaissance survey. (a) Prismatic compass (b) Dumpy level * (c) Aneroid Barometer (d) Pedometer

Last Answer : (b) Dumpy level *

Description : Theodolite is an instrument used for (a) Tightening the capstan-headed nuts of level tube (b) Measurement of horizontal angles only (c) Measurement of vertical angles only (d) Measurement of both horizontal and vertical angles*

Last Answer : (d) Measurement of both horizontal and vertical angles*

Description : Dumpy level is most suitable when (a) The instrument is to be shifted frequently (b) Fly leveling is being done over long distance (c) Many readings are to be taken from a single setting of the instrument* (d) All of the above

Last Answer : (c) Many readings are to be taken from a single setting of the instrument*

Description : The urinal basin shall be connected with (a) High level floating cistern* (b) Low level floating cistern (c) Automatic floating cistern (d) Any one of the above

Last Answer : (a) High level floating cistern*