What is the carriageway of two lane ROB on National Highway a)10.00m  
b)8.5  
c)9.50*  
d)10.50

1 Answer

Answer :

c)9.50*

Related questions

Description : According to IRC : 52-1973, for a single lane National Highway in hilly region, (A) Width of the carriageway must be 3.75 m (B) Shoulders on either side must be 1.25 m (C) Total width of the road-way must be 6.25 m (D) Total of the above

Last Answer : Answer: Option D

Description : If the number of lanes on the carriageway of a road is more than two, the total width of lane ways is equal to 3.0 m (A) + 0.60 m (B) + 0.70 m (C) + 0.90 m (D) + 1.50 m

Last Answer : Answer: Option B

Description : According to Indian Road Congress, the width of carriageway, is (A) 3.75 m for single lane (B) 7.0 m for two lanes without raised kerbs (C) 7.5 m for two lanes with raised kerbs (D) All the above

Last Answer : Answer: Option D

Description : bbreviation of ROB …

Last Answer : Road Over Bridge

Description : Which para of Engineering code deals with cost sharing of ROB/RUBs a) 1716 b) 1814 c) 1816* d) 1819

Last Answer : c) 1816*

Description : The height gauge need to be provided in a) ROB b) RUB* c) FOB d) Fly Over

Last Answer : b) RUB*

Description : The minimum vertical clearance above R.L. to bottom of ROB near the yard shall be a) 6525 mm* b) 5870 mm c) 2360 mm d) 6250 mm

Last Answer : a) 6525 mm*

Description : Temporary staging for casting PSC Box Girder for a ROB over the Railway span shall be removed a) after hardening of concrete b) before hardening of concrete c) during concreting d) after stressing the cables

Last Answer : d) after stressing the cables

Last Answer : The length of the country's first 8-lane highway is about 8 km

Description : Formation width for bank for M.G. double line section is (a) 8.50 m (b) 8.84 m (c) 9.65 m (d) 9.81 m*

Last Answer : (d) 9.81 m*

Description : How many square meters in .53m x 10.00m?

Last Answer : Need answer

Description : Would you rather drive a four lane divided highway, or a two lane curvy highway?

Last Answer : If time isn’t an issue I would prefer the two lane curvy road though not so much at night.

Description : Ok ,traveling down a two way highway and come upon all the vehicles in your lane stopped with their hazards on, and no one in the on coming lane, would you just automatically just try and pass all the vehicles, or maybe see why everyone was stopped?

Last Answer : I would wait for a bit to see if the traffic finally moved, all the while searching for a local traffic report. If possible, I would turn around and find an alternate route. But no, I wouldn’t try to zoom up to see what was happening. That person is a nitwit.

Description : What is your opinion regarding the speed limit drivers should do in the left lane of a highway?

Last Answer : If you have three lanes, the right lane should be for people who want to drive UNDER the speed limit, or for people who are about to exit, or for those entering. The middle lane should be for ... speed you think you can get away with, but no tailgating and no blocking others, holding up traffic.

Description : When exiting the highway, or when the lanes converge due to bottleneck, are you a driver that gets in line ASAP, or do you stay in your lane as long as possible to cut in and get close to front?

Last Answer : I move as soon as possible, especially for emergency vehicles. I used to work with an ambulance service and I know they appreciate it. Not to mention that now it is a law in my state that if you don’t get over you can get fined up to $500.

Description : Is it legal to pass a car in the right lane on a four lane highway

Last Answer : Sure. As long as you don’t go off on the shoulder, it’s allowed. I’ve done it 100 times. If the person next to you or in front of you on your left is going too slow, pass them.

Description : If you were driving down the freeway at nighttime during construction work and spotted several Highway Patrol officers near the construction area with their lights on would you a: speed up b: slow down c: ... this is a multi-lane freeway and you are able to go at or above typical freeway speeds)

Last Answer : I always slow down for construction sites. Those “My Daddy Works Here!” signs got me.

Description : What's the difference between Street, Avenue, Boulevard, Way, Lane, Port, Circle, Highway, Expressway, Freeway, Road, Thruway, Beltway, Court, Frontage, Drive, Bay, Square, Route, Culdesac and Interstate?

Last Answer : Hey. You forgot Trail and Parkway.

Last Answer : The country's first 6-lane highway Kachpur , Jatrabari.

Description : ormal size of brick used in India is a) 22 x 11.2 x 7 cm* b) 25 x 16 x 8 cm c) 19 x 12 x 9 cm d) 20 x 10 x 5 cm

Last Answer : a) 22 x 11.2 x 7 cm*

Description : In case of emergency, land can be acquired urgently by operation of special section (a) Section 4 & 6 (b) Section 9 & 17* (c) Section 8 & 10 (d) None of them

Last Answer : (b) Section 9 & 17*

Description : According to the recommendations of Nagpur Conference, the width formation of an ideal National Highway in hard rock cutting, is (A) 8.9 m (B) 7.9 m (C) 6.9 m (D) 6.5 m

Last Answer : Answer: Option B

Description : A rural water supply serves a population of 10, 000 at the rate of 50 litres per capita per day . For the chlorine dose of 2 PPM the required amount of bleaching powder with 20% available chlorine will be a. 0.5 kg b. 5 kg * c. 10 kg d. 15 kg

Last Answer : b. 5 kg

Description : What is the Shelf life of mould ? (i) 6 months minimum. (ii) 8 months minimum (iii) 9 months minimum* (iv) 12 months minimum

Last Answer : (iii) 9 months minimum*

Description : what is the value of long chord for measuring unevenness in track recording a. 3.6 meter b. 9.6 meter* c. 7.2 meter d. 4.8 mete

Last Answer : b. 9.6 meter*

Description : Formation width for banks for B.G. single line section is (a) 6.10 m (b) 6.50 m (c) 6.85 m* (d) 7.0 m

Last Answer : (c) 6.85 m*

Description : Standard bag of cement in ……… kg a) 52 kg b) 30.5kg c) 10.7kg d) 50 kg*

Last Answer : d) 50 kg*

Description : Maximum tilt specified during sinking of well foundation is a) 1 in 10 b) 1 in 50 c) 1 in 100* d) 1 in 150

Last Answer : c) 1 in 100*

Description : From distribution main of 50 mm size, number of service pipes of 15 mm size can be taken off are ------ a) 6 b)10 c) 12 e):20*

Last Answer : e):20*

Description : The spacing of tube wells should generally be more than ----------from the circle of influence a)10 metre b)50 metre c)100 metre* d) 500 metre

Last Answer : c)100 metre*

Description : The ratio of maximum cant e and gauge G in India is about a)1 / 100 b) 1 / 50 c)1 /10* d) 1 / 25

Last Answer : c)1 /10*

Description : Road width 8.8 m of two lane National highways or State highways in mountainous terrain (A) Excludes the width of parapet (0.6 m) (B) Excludes the width of side drain (0.6 m) (C) Excludes the width of parapet and side drain (D) Includes the width of parapet and side drain

Last Answer : Answer: Option C

Description : Formation width for cuttings for B.G. single line section is (a) 5.40 m (b) 6.20 m (c) 6.25 m* (d) 6.50 m

Last Answer : (c) 6.25 m*

Description : A level crossing qualifies for construction of Road Over Bridge/ Under Bridge on Cost sharing basis with State Government when the Train Vehicle Unit is more than a) 50,000 b) 1, 00,000* c) 3, 00,000 d) 5, 00,000

Last Answer : b) 1, 00,000*

Description : The Height Gauge for a level crossing should be located at least --------- from the gate post a) 3 meters b) 5 meters c) 8 meters* d) 10 meters

Last Answer : c) 8 meters*

Description : What is the limit of Unevenness of A category of track a. 0 to 10 mm b. 0 to 5 mm c. 0 to 6 mm* d. 0 to 8 mm

Last Answer : c. 0 to 6 mm

Description : The convexity provided to the carriageway between the crown and edge of the pavement, is known as (A) Super-elevation (B) Camber (C) Height of the pavement (D) None of these

Last Answer : Answer: Option B

Description : The width formation of a road means the width of (A) Carriageway (B) Pavement and shoulders (C) Embankment at ground level (D) Embankment at the top level

Last Answer : Answer: Option D

Description : Before providing super-elevation on roads, the portion of the carriageway between the crown and the outer edge is made (A) To have a reduced fall (B) Horizontal (C) To have slope of the camber on the other half of the carriageway (D) None of these

Last Answer : Answer: Option C

Description : A subsidiary area in a carriageway placed so as to control the movement of the traffic, is (A) Median strip (B) Island (C) Flower bed (D) Refuge

Last Answer : Answer: Option B

Description : If V is speed of a moving vehicle, r is radius of the curve, g is the acceleration due to gravity, W is the width of the carriageway, the super elevation is (A) WV/gr (B) W²V/gr (C) WV²/gr (D) WV/gr²

Last Answer : Answer: Option C

Description : Power tillers are popularly available in hp range of q. 6-12 hp r. 12-20 hp s. 1-6 hp t. 20-50 hp

Last Answer : q. 6-12 hp

Description : Size of cubicle of a booking office is kept as (a) 1.20 x 1.50 m (b) 1.50 x 1.20 m (c) 1.50 x 1.80 m (d) 1.80 x 1.50 m*

Last Answer : (d) 1.80 x 1.50 m*

Description : Rails used for A T Welding shall not normally be welded? (i) 20 years old . (ii) 30 years old (iii) 40 years old (iv) 50 years old*

Last Answer : iv) 50 years old*

Description : Last flag man is deputed at which distance from last detonator during protection of welding site . (i) 30 mts (ii) 50 mts (iii) 45 (iv) 60 mts

Last Answer : (iv) 60 mts

Description : Height of crucible is kept from top surface of mould? (i) 30 mm (ii) 40 mm (iii) 50 mm* (iv) 60 mm

Last Answer : (iii) 50 mm*

Description : How much rail ends are cleaned with Kerosene Oil and steel wire brush? (i) Minimum 100 mm both side (ii) Minimum 50 mm both side.* (iii) No need (iv) As decided by site supervisor

Last Answer : (ii) Minimum 50 mm both side.*

Description : What is the validity of Provisional competency certificate? (i) Valid for executing 50 joints or six months whichever is earlier. (ii) Valid for executing 100 joints or six months whichever is earlier.* (iii) Valid for executing 50 joints. (iv) Valid for six months

Last Answer : (ii) Valid for executing 100 joints or six months whichever is earlier.*

Description : Cross sectional area of catch water drain should not be more than a) 0 .75 square meter* b) 0. 90 square meter c) 0. 80 square meter d). 50 square meter

Last Answer : a) 0 .75 square meter*

Description : Cross slope of the formation to have good drainage of Ballast section is a) 1 in 40* b) 1 in 50 c) 1 in 30 d) 1 in 20

Last Answer : a) 1 in 40*