How much higher are second shift wages than the first shift wages?
a. 0 %
b. 20 %
c. 40 %
d. 50 %
e. 60 %

1 Answer

Answer :

d. 50 %

Related questions

Description : All of the following are direct implications of hiring a second shift except: a. increased production capacity. b. paying higher wages to second shift. c. training costs. d. increased MTBF. e. recruitment costs.

Last Answer : d. increased MTBF.

Description : How much does it cost for MTBF per 1,000 hours of reliability? a. $0.50 b. $0.40 c. $0.30 d. $0.20 e. $0.10

Last Answer : c. $0.30

Description : Labor costs are driven by three factors: a. wage and benefit rates, automation levels, and MTBF. b. wage and benefit rates, positioning, and second shift. c. wage and benefit rates, second ... , automation levels, and second shift. e. wage and benefit rates, second shift, and material costs.

Last Answer : d. wage and benefit rates, automation levels, and second shift.

Description : Which three factors drive labor cost? a. Production capacity b. Wage and benefit rates c. Automation levels d. Second shift/Overtime costs e. b, c, d

Last Answer : e. b, c, d

Description : What is one drawback of increasing automation? a. The product requires increased time/expense for subsequent short-move repositioning. b. Operating second shift becomes more expensive. c. ... d. Automation slows production capability. e. It requires more employees for the production line.

Last Answer : a. The product requires increased time/expense for subsequent short-move repositioning.

Description : How can assembly lines double their capacity? a. Speed up the production. b. Add a second shift. c. Double the material. d. Build more assembly lines. e. Assembly lines cannot be doubled.

Last Answer : b. Add a second shift.

Description : Account Receivables lag impacts sales. At no credit terms, the appeal falls to about ______ %, at 30 days, appeal is _____ %, at 60 days, appeal is ______%. a. 98.5, 92, 65 b. 65, 92, 98.5 c. 70, 85, 99 d. none of the above, there is no impact

Last Answer : b. 65, 92, 98.5

Description : To run perfectly, all HR department managers should know that a. the negotiation starting point should not exceed 80%. b. the starting point for benefits or wages should be between 0-150% of the current ... negotiation ceiling. d. all of the above is correct. e. none of the above are true.

Last Answer : c. all strike settlements should be halfway between the demand and the negotiation ceiling.

Description : The company’s negotiation starting position for wages a. is never more than 150% of the current contract. b. is always lower than what Labor expects. c. is always exactly 80% of the current contract. d. is always half of the increase workers are asking for. e. none of these.

Last Answer : a. is never more than 150% of the current contract.

Description : Workers will not strike approximately 7 days for a. $1 difference in wages. b. $300 difference in benefit package. c. percentage point difference in Profit Sharing. d. 1 hour difference in training. e. percentage point difference in Annual Raise.

Last Answer : d. 1 hour difference in training.

Description : If current wages are set at $10/hour, what would be the minimum starting pay that your company would offer? a. $6/hour b. $8/hour c. $10/hour d. $12/hour e. none of the above

Last Answer : b. $8/hour

Description : For Wages, the negotiation Starting Position cannot be less than ____% or more than ____% of the current contract. a. 75; 125 b. 75; 150 c. 80; 125 d. 80; 150

Last Answer : d. 80; 150

Description : The cost to increase automation to 8.0 is equal to a. First Shift Capacity X [$8 X (4 - Automation Level). b. First Shift Capacity X [$8 X (4 + Automation Level). c. First Shift Capacity X [$4 X ... Capacity X [$4 X (8 + Automation Level). e. First Shift Capacity X [$4 X (4 - Automation Level)

Last Answer : c. First Shift Capacity X [$4 X (8 – Automation Level).

Description : How is the strength of the sales channel measured? a. Accessibility on a scale of 0 to 50 b. Accessibility on a scale of 0 to 100% c. Accessibility on a scale of 1 to 50 d. Accessibility on a scale of 1 to 100% e. Accessibility on a scale of 1 to 25

Last Answer : b. Accessibility on a scale of 0 to 100%

Description : Looking at the production, if the potential bar is higher than the actual one, a. the company should spend more budget in sales. b. the company over produced and missed sales ... company under produced and missed sales opportunities. e. the company should spend more budget in marketing.

Last Answer : d. the company under produced and missed sales opportunities.

Description : Which of the following will give your company an AAA bond rating: a. Have contribution margins higher than 30%. b. Have absolutely no debt. c. Retire all of the current outstand stock. d. Pay a dividend that is less than EPS. e. Retire bonds before they are due.

Last Answer : b. Have absolutely no debt.

Description : Which of the following is true about the Accounts Receivable Lag and its implications on demand? a. If you offer no credit, demand falls to about 60% of normal. b. At 30 days, demand is 90%. c. At 45 days, demand is 95%. d. At 60 days, demand is 98.5%. e. At 90 days, demand is 100%.

Last Answer : d. At 60 days, demand is 98.5%.

Description : Labor will strike for a maximum: a. 10 days. b. 84 days. c. 60 days. d. 30 days. e. There is no strike maximum.

Last Answer : b. 84 days.

Description : Which one of the following statements regarding preferred position in fine cut is false? a. Traditional customers want products located in the center of the circle. b. Low end customers want the ... . d. Performance customers prefer higher performance levels. e. Size customers want smaller size.

Last Answer : b. Low end customers want the newest technology at the cheapest price.

Description : The automation level a. causes you to require more manpower with higher ratings. b. causes you to require more manpower with lower ratings. c. causes you to require less manpower with higher ratings. d. causes you to require less manpower with lower ratings. e. both b and c.

Last Answer : e. both b and c.

Description : What are the drivers of Material Costs? a. Higher performance b. Smaller size c. Higher Mean Time Between Failure (MTBF) d. All of the above e. None of the above

Last Answer : d. All of the above

Description : What happens to a company when its debt-to-assets ratio increases? a. Its credibility among creditors suffers. b. It envisages higher risk. c. Its short term interest rates increase. d. Its bond rating is reduced. e. c, d

Last Answer : e. c, d

Description : ncreasing a product’s reliability will result in which of the following changes to production costs? a. Lower material cost b. Higher material cost c. Higher labor costs d. Lower labor costs e. Reducing MTBF has no effect on costs of production

Last Answer : b. Higher material cost

Description : A point or some points you consider for your strategy are a. strive to give your customers the top two buying criteria. b. the perceptual map is more important as a rough cut consideration than a fine cut ... , it does not matter how good your product is if you stock out. d. all of the above.

Last Answer : d. all of the above.

Description : Investments in training leads to a __________ and _________. a. higher costs, higher turnover b. higher productivity, lower turnover c. lower productivity, lower turnover d. none of the above

Last Answer : b. higher productivity, lower turnover

Description : Higher automation leads to lower production costs and has what effect on repositioning a product on the perceptual map? a. makes it more difficult and expensive b. makes it easier and cheaper c. no effect d. eliminates repositioning

Last Answer : a. makes it more difficult and expensive

Description : The best case margin potential for a product with a top price of $30 and a minimum cost of goods sold of $15 is: a. $45. b. $2. c. $450. d. $.50. e. none of the above.

Last Answer : e. none of the above.

Description : Percentage of pozzolanic material containing clay upto 80% used for the manufacture of pozzolana cement, is (A) 30 % (B) 40 % (C) 50 % (D) 60 %

Last Answer : (A) 30 %

Description : The percentage of the aggregate of F.M. 2.6 to be combined with coarse aggregate of F.M. 6.8 for obtaining the aggregates of F.M. 5.4, is (A) 30 % (B) 40 % (C) 50 % (D) 60 %

Last Answer : (C) 50 %

Description : Brass is an alloy of copper and zinc having the relative percentage (A) 60-70% Cu and 30-40% Zn (B) 50-60% Cu and 40-50% Zn (C) 40-50 % Cu and 60-50% Zn (D) 30-40 % Cu and 60-70% Zn

Last Answer : A) 60-70% Cu and 30-40% Zn

Description : The total domestic consumption in a city water supply, is assumed (A) 20 % (B) 30 % (C) 40 % (D) 60 %

Last Answer : (D) 60 %

Description : The conductivity of copper is less than that of silver by (A) 5 – 10 %. (B) 50 – 60 %. (C) 80 – 90 %. (D) 20 – 30 %.

Last Answer : (A) 5 – 10 %.

Description : An automobile is travelling at 25 m/s. It takes 0.3 second to apply the brakes after which the deceleration is 6 m/s2. How far, in meters, does the automobile travel before it stops? a.45 b.107 dynes c.40 d.50 e.60

Last Answer : e. 60

Description : The percentage of alumina in a good brick earth lies between (A) 5 to 10 % (B) 20 to 30 % (C) 50 to 60 % (D) 70 to 80 %

Last Answer : Answer: Option B

Description : Percentage of silica in a good brick earth lies between (A) 5 to 10 % (B) 20 to 30 % (C) 50 to 60 % (D) 70 to 80

Last Answer : Answer: Option C

Description : At the start of the simulation, all assembly lines have an automation level between: a. 2.0 and 4.0. b. 3.0 and 5.0. c. 4.0 and 6.0. d. 5.0 and 7.0. e. 6.0 and 8.0.

Last Answer : b. 3.0 and 5.0.

Description : Which of the following is not the correct yearly drift rate for the corresponding segment? a. In the traditional segment performance drifts by +0.7 and size by -0.7. b. In the low segment performance drifts by +0.5 ... size by -0.7. e. In the size segment performance drifts by -0.7 and size by +1.0.

Last Answer : e. In the size segment performance drifts by -0.7 and size by +1.0.

Description : Every year the Traditional segment circle drifts ____ in performance and _____ in size. a. +1.0, -0.7 b. +0.7, -0.7 c. -0.7, +0.7 d. +0.5, -0.5 e. +0.9, -0.9

Last Answer : b. +0.7, -0.7

Description : Automation levels are given on a scale of _____ to _____. a. 0.0; 5.0 b. 1.0; 5.0 c. 0.0; 10.0 d. 1.0; 10.0 e. 5.0; 10.0

Last Answer : d. 1.0; 10.0

Description : The center spot of traditional products drifts _______ each year. a. +0.7 performance, -0.7 size b. +0.5 performance, -0.5 size c. +0.9 performance, -0.9 size d. +1.0 performance, -0.7 size e. +0.7 performance, -1.0 size

Last Answer : a. +0.7 performance, -0.7 size

Description : High end customers prefer a product age of 0, at what age exceeds the fine cut for the product a. 5 years. b. 3 years. c. 2 years. d. 2.5 years. e. 4 years.

Last Answer : c. 2 years.

Description : What is the size of the plant at the start of the simulation? a. 5 assembly lines with space to add 1 more. b. 5 assembly lines with space to add 3 more. c. 5 assembly lines with space to add 2 more. d. 8 assembly lines. e. 0 – the plan can be built to team specification.

Last Answer : b. 5 assembly lines with space to add 3 more. c.

Description : The interest rate on a bond ______ by________ for each______ in the bond rating category. a. Increases; 0.5%; Decrease b. Decreases; 1.4%; Decrease c. Increases; 0.5%; Increases d. Decreases; 1.4%; Increase e. Increases; 7.5% ; Decrease

Last Answer : a. Increases; 0.5%; Decrease

Description : In order to achieve 100% accessibility, a team must: a. none of these. b. have at least two products in the same segment. c. have a combined sales budget of $4.0 million. d. create awareness in the previous year. e. spend $4 million on distribution channels.

Last Answer : b. have at least two products in the same segment.

Description : There is ______ lag in buying new Capacity and ______ lag in changing Automation. a. 0; 0 b. 1 year; 0 c. 0; 1 year d. 1 year; 1 year e. ½ year; ½ year

Last Answer : d. 1 year; 1 year

Description : .If your current capacity is 10,000 units and your automation level is 5.0, what is the difference of the investment between doubling your capacity and doubling your automation level? a. $60,000 b. $20,000 c. $10,000 d. $520,000 e. $260,000

Last Answer : a. $60,000

Description : What is the total cost in dollars for adding 1.0 million units of capacity to a production line with an automation level of 1.0 and floor space costs per unit of $6? Assume automation costs per unit of $4. a. $26 million b. $10 million c. $2.6 million d. $1 million e. none of the above

Last Answer : b. $10 million

Description : If you increase automation from 2.0 to 5.0, the cost is: a. $12 per unit of capacity. b. $15 per unit of capacity. c. $9 per unit of capacity. d. $6 per unit of capacity. e. Cannot determine with this information.

Last Answer : a. $12 per unit of capacity.

Description : nce you upload your official decisions during a round, how many times can you change them before the end of the round? a. 0 b. 1 c. 2 d. 5 e. As many times as you want

Last Answer : e. As many times as you want