129 views

1 Answer

Answer :

Primary side is low voltage side and secondary side is high voltage side.
Like 0 like

Please log in or register to answer this question.

Related questions

114 views

Description : During open circuit test of a transformer?

Last Answer : During open circuit test of a transformer primary is supplied rated voltage.

1 answer
75 views

Description : Explain the open delta (delta-delta) test on transformer.

0 answers
117 views

Description : Explain the procedure to perform Short Circuit test on single phase transformer with circuit diagram.

0 answers
174 views

Last Answer : In short circuit test of transformer the low voltage side is short circuited . On high voltage side the voltmeter is connected in parallel and ammeter in series and also a wattmeter is ... circuit test is done for determining impedance and losses. In this test iron losses is neglected.

1 answer
303 views

Description : A d.c. source has an open circuit voltage of 30 V and an internal resistance of 1.5 Ohm. A resistive load is connected to the source. Maximum power dissipated in the load is (A) 300 W (B) 150 W (C) 45 W (D) 20 W

Last Answer : A d.c. source has an open circuit voltage of 30 V and an internal resistance of 1.5 Ohm. A resistive load is connected to the source. Maximum power dissipated in the load is 150 W

1 answer
7.9k views

Description : Describe the difference between an open circuit and a short circuit.

Last Answer : Open circuit means the wire is cut meaning power will not flow and close circuit means wire is not cut and hence power will flow.Short circuit is the same as close circuit

3 answers
292 views

Last Answer : It is required to measure the true open circuit e.m.f. of a battery. The best device is D.C. potentiometer.

1 answer
262 views

Description : Explain open emitter BJT drive circuit.

Last Answer : open emitter BJT drive circuit:

1 answer
640 views

Description : An open-circuit test on a transformer is conducted primarily to measure?

Last Answer : The open-circuit test in a transformer is used to measure

2 answers
126 views

Description : A no-load test is performed on a transformer to determine?

Last Answer : A no-load test is performed on a transformer to determine magnetizing current and loss.

1 answer
228 views

Last Answer : Short circuit test on transformers is conducted to determine copper losses.

1 answer
320 views

Description : Polarity Test of Transformer

Last Answer : Polarity Test of Transformer

1 answer
3.0k views

Description : If a 5-bus test system contains 6 transmission lines and one transformer, how many non-zero elements are there in the system Y-bus ? (A) 25 (B) 12 (C) 11 (D) 19

Last Answer : If a 5-bus test system contains 6 transmission lines and one transformer, 19 non-zero elements are there in the system Y-bus.

1 answer
123 views

Description : Sumpner's test is conducted on transformer to determine?

Last Answer : Sumpner's test is conducted on transformer to determine temprature.

1 answer
58 views

Description : During short circuit test iron losses are negligible because A. The current on secondary side is negligible B. The voltage on secondary side does not vary C. The voltage applied on primary side is low D. Full-load current is not supplied to the transformer

Last Answer : C) the voltage applied on primary side is low

1 answer
8 views

Description : During short circuit test iron losses are negligible because A. The current on secondary side is negligible B. The voltage on secondary side does not vary C. The voltage applied on primary side is low D. Full-load current is not supplied to the transformer

Last Answer : C) the voltage applied on primary side is low

1 answer
405 views

Description : Equivalent circuit of transformer

Last Answer : Equivalent Circuit Diagram of Transformer Referred to Primary: V1 -Primary Input voltage I1 - Input Current I0- Exciting current/ No load current Im- Magnetizing component ... equivalent of secondary terminal voltage ZL- Load impedance ZL ′- Primary equivalent of load impedance

2 answers
268 views

Description :  An AC supply of 230 V is applied to a half-wave rectifier circuit through a transformer having primary to secondary turn’s ratio 12:1. The peak inverse voltage is A) 8.62 V B) 12 V C) 19.17 V D) 27.11 V 

Last Answer :  An AC supply of 230 V is applied to a half-wave rectifier circuit through a transformer having primary to secondary turn’s ratio 12:1. The peak inverse voltage is A) 8.62 V B) 12 V C) 19.17 V D) 27.11 V 

1 answer
176 views

Last Answer : The short circuit in any winding of the transformer is the result of impulse voltage.

1 answer
32 views

Description : 66 While conducting short-circuit test on a transformer the following side is short circuited A. High voltage side B. low voltage side C. primary side D. secondary side

Last Answer : B. Low voltage side

1 answer
18 views

Description : 30 In performing the short circuit test of a transformer A. high voltage is usually short circuited B. low voltage side is usually short circuited C. any side is short circuited with preference D. none of the above

Last Answer : B. Low voltage side is usually short circuited

1 answer
114 views

Description : What are the disadvantages of Open loop control system?

Last Answer : Open loop control system are less reliable. In open loop control system Optimization is not possible. Open loop control system are less accurate.

1 answer
96 views

Description : Why CT is never operated with an open secondary ?

Last Answer : CT secondary should never be kept open because it will cause saturation of the core to a high level and very high voltage will appear across the secondary which can breakdown the insulation. One terminal of PT secondary is always grounded to avoid capacitive induction and for human safety

2 answers
4 views

Description : Why the open circuit test on a transformer is conducted at rated voltage?

Last Answer : A:The open circuit on a transformer is conducted at a rated voltage because core loss depends upon the voltage. This open circuit test gives only core loss or iron loss of the transformer.

1 answer
4 views

Description : How to Open a Tight Jar Lid

Last Answer : How to Open a Tight Jar Lid There are instances when you buy a stubborn jar of pickles (Learn how to pickle), peanut butter or mayonnaise that you can't open with your hands. It can drive you ... no time. If you enjoy reading this article, you might as well read how to can fruits and vegetables.

1 answer
6 views

Description : How to Open a Can without a Can Opener

Last Answer : How to Open a Can without a Can Opener You're dying to sink your teeth into those canned peaches, but you find yourself without any can opener. At times like this, many people would easily give up ... you'll soon find yourself enjoying the yummy contents of the can. Be careful not to spill the food!

1 answer
6 views

Description : Open-Face Shrimp Melt

Last Answer : Open-Face Shrimp Melt - serves 2 Preparation - 15 minutes 3 ounces shelled and deveined cooked small shrimp, cut lengthwise into halves 1/4 cup chopped celery 2 tbsp chopped scallion (green ... baking sheet arrange sandwiches and broil 6 inches from heat source until cheese melts, about 1 minute.

1 answer
202 views

Description : What will happen to the gain margin if the gain of the open loop system is doubled? A) Doubled B) Becomes half C) Is not affected D) Becomes one-fourth 

Last Answer : What will happen to the gain margin if the gain of the open loop system is doubled? A) Doubled B) Becomes half C) Is not affected D) Becomes one-fourth 

1 answer
720 views

Description : If the gain of the open loop system is doubled, the gain margin  (1) Is not affected (2) Gets doubled (3) Becomes half (4) Becomes one -forth

Last Answer : If the gain of the open loop system is doubled, the gain margin Becomes half

1 answer
118 views

Description : An open resistor, when checked with an ohm-meter reads?

Last Answer : An open resistor, when checked with an ohm-meter reads infinite.

1 answer
162 views

Last Answer : Open circuited armature coil of a D.C. machine is identified by the scarring of the commutator segment to which open circuited coil is connected and indicated by a spark completely around the commutator.

1 answer
264 views

Last Answer : If the field winding of an unloaded salient pole synchronous motor is open circuited, the motor will stop.

1 answer
104 views

Description : What is an example of an open loop system?

Last Answer : Open loop system. Ex. Electric heater, washing machine, fan, electric switch, etc

1 answer
127 views

Description : What are the advantages of open loop control system?

Last Answer : Open loop control system are simple to design. Open loop control system are generally stable.

1 answer
132 views

Description : what is open loop and close loop control system?

Last Answer : A) In open loop system the input is independent         of output but output is depends on input. A-1. no feedback path in open loop s/m    -2. less accuracy than close loop s/m. Ex. Washing ...    -3. high accuracy. Ex. Air conditioner ( AC ), rocket launcher, radar          system, etc

2 answers
174 views

Last Answer : yes High Voltage side of Transformer winding have more number of turns. and low voltage side of Transformer winding have less number of turns.

1 answer
130 views

Description : Step-down transformer converts high voltage and low current into:  (A) How voltage and high current (B) High voltage and low current (C) Low voltage and high current (D) None of the above

Last Answer : Step-down transformer converts high voltage and low current into: Low voltage and high current

1 answer
12 views

Description : 49 The open circuit test is carried out in a transformer to find the A. Cu loss B. Core loss C. Total loss D. Insulation resistance

Last Answer : B. Core loss

1 answer
380 views

Description : With the help of neat diagram, describe the procedure to carry out phasing out test on a 3 phase transformer. Also state the purpose of conducting this test on 3 phase transformer.

Last Answer : i) This test is carried out on 3-ph transformer to identify primary & secondary winding belonging to the same phase. ii) As shown in fig above all primary & secondary phases ... of this test is to check the respective phases of primary & secondary windings in 3-ph transformer

1 answer
558 views

Description : Why phasing out and polarity test is carried out on three phase transformer?

Last Answer : The phasing out test is carried out to identify the windings (primary and secondary) of corresponding phase of the three phase transformer. The polarity test is carried out to identify the ... identical polarity of the primary and secondary windings of each phase of the three phase transformer.

1 answer
62 views

Description : Why high voltage test is done?

0 answers
63 views

Description : What is a high voltage test?

0 answers
26 views

Description : 65)No-load current in a transformer A. Lags behind the voltage by about 75 deg B. leads the voltage by about 75 C. lags behind the voltage by about 15 D. leads the voltage by about 15

0 answers
118 views

Description : The inrush current of a transformer at no load is maximum if the supply voltage is switched on  (1) at peak voltage value (2) at zero voltage value (3) at half voltage value (4) at 0.866 time voltage value

Last Answer : At 0.866 time voltage value

2 answers
192 views

Last Answer : The no load current in a transformer lags behind the applied voltage by an angle of about 75°.

1 answer
414 views

Description : Explain the need and steps to conduct the reduced voltage running up test on the three phase induction motor.

0 answers
...