As compared to crest of the normal portion of the weir, the crest of the under sluice portion of
weir is kept at
(A) Lower level
(B) Higher level
(C) Same level
(D) Any of the above depending on the design
weir is kept at
(A) Lower level
(B) Higher level
(C) Same level
(D) Any of the above depending on the design