Chain surveying is well adopted for
(A) Small areas in open ground
(B) Small areas with crowded details
(C) Large areas with simple details
(D) Large areas with difficult details

1 Answer

Answer :

(A) Small areas in open ground

Related questions

Description : The distances AC and BC are measured from two fixed points A and B whose distance AB is known. The point C is plotted by intersection. This method is generally adopted in (A) Chain surveying (B) Traverse method of surveys (C) Triangulation (D) None of these

Last Answer : (A) Chain surveying

Description : In chain surveying tie lines are primarily provided  (A) To check the accuracy of the survey  (B) To take offsets for detail survey  (C) To avoid long offsets from chain lines  (D) To increase the number of chain lines 

Last Answer : (C) To avoid long offsets from chain lines 

Description : The accuracy of measurement in chain surveying, does not depend upon (A) Length of the offset (B) Scale of the plotting (C) Importance of the features (D) General layout of the chain lines

Last Answer : (D) General layout of the chain lines

Description : The additional lines which are measured to show the correctness of the chain surveying are called: (A) Check clines (B) Proof lines (C) Tie lines (D) All of these

Last Answer : (D) All of these

Description : Pick up the method of surveying in which field observations and plotting proceed simultaneously from the following (A) Chain surveying (B) Compass surveying (C) Plan table surveying (D) Tacheometric surveying

Last Answer : (C) Plan table surveying

Description : In chain surveying, perpendiculars to the chain line are set out by (A) A theodolite (B) A prismatic compass (C) A level (D) An optical square

Last Answer : (D) An optical square

Description : The method generally preferred to for contouring an undulating area, is (A) Chain surveying (B) Plane table surveying (C) Tacheometrical surveying (D) Compass surveying

Last Answer : (C) Tacheometrical surveying

Description : Prolongation of chain line across an obstruction in chain surveying, is done by (A) Making angular measurements (B) Drawing perpendiculars with a chain (C) Solution of triangles (D) All the above

Last Answer : (B) Drawing perpendiculars with a chain

Description : In chain surveying field work is limited to (A) Linear measurements only (B) Angular measurements only (C) Both linear and angular measurements (D) All the above

Last Answer : (A) Linear measurements only

Description : Check lines (or proof lines) in Chain Surveying, are essentially required (A) To plot the chain lines (B) To plot the offsets (C) To indicate the accuracy of the survey work (D) To increase the out-turn

Last Answer : (C) To indicate the accuracy of the survey work

Description : Geodetic surveying is undertaken  (A) For production of accurate maps of wide areas  (B) For developing the science of geodesy  (C) Making use of most accurate instruments and methods of observation  (D) All the above 

Last Answer : (D) All the above 

Description : How crowded are the two day areas at the Delaware Seashore State Park?

Last Answer : Those areas get a decent amount of people, but I personally wouldn't call them crowded. We use to go to the Indian River area all the time (the area on the other side of the bridge from the ... to get into (because it's considered a state park). They also have showers and a consession stand.

Description : Explain principle of chain surveying 

Last Answer : 1) Principle of chain surveying is triangulation 2) Triangulation consists of frame work of triangles. The whole area is divided into network of triangles. 3) A triangle is the only simple plane ... to be adopted depends upon the shape & configuration of the ground & the natural obstacles. 

Description : State any four precautions to be taken while selecting stations for chain surveying.

Last Answer : Following are the precautions to be taken while selecting station for chain surveying. 1) As far as possible the survey work should be based upon the basic principle of surveying i.e. working from whole to ... level ground. 9) The survey lines should run as far as possible nearer to object.

Description : What was a large apartment building that was overly crowded and loud and dirty called?

Last Answer : A tenement

Description : What were these large crowded compartments called?

Last Answer : What is the answer ?

Description : What was a large apartment building that was overly crowded and loud and dirty called?

Last Answer : A tenement

Description : Light houses are places with powerful lights to : (1) guide and resolve traffic jams in crowded metrocities during nights. (2) guide and help large crowds at religious gathering during nights. (3) ... harbour during night. (4) guide and warn the ships coming from different directions in the ocean.

Last Answer : (4) guide and warn the ships coming from different directions in the ocean. Explanation: A lighthouse is a tower, building, or other type of structure designed to emit light from a system of ... coastlines, hazardous shoals, reefs, safe entries to harbors, and can also assist in aerial navigation.

Description : Light houses are places with powerful lights to : (1) guide and resolve traffic jams in crowded metro-cities during nights. (2) guide and help large crowds at religious gathering during nights. (3) ... harbour during night. (4) guide and warn the ships coming from different directions in the ocean.

Last Answer : guide and warn the ships coming from different directions in the ocean.

Description : Which of the following describes an ERP system? A. ERP systems provide a foundation for collaboration between departments B. ERP systems enable people in different business areas to communicate C. ERP ... used to make the decisions that drive the organisation's performance D. All of the above

Last Answer : D. All of the above

Description : One-way streets are generally provided in crowded cities as, these (A) Are inexpensive means of traffic flow (B) Reduce delays to vehicles (C) Permit higher speed (D) All the above

Last Answer : Answer: Option D

Description : When gravity and pumping systems of water distribution are adopted, the type of distribution  reservoir, is  (A) Elevated tank  (B) Ground source reservoir  (C) Intz tank  (D) Stand pipe

Last Answer : (A) Elevated tank 

Description : The subtense tacheometry method is adopted when the ground is (a) Flat (b) Inclined (c) Undulating (d) A waterbody

Last Answer : (a) Flat

Description : It is more difficult to obtain good results while measuring horizontal distance by stepping (A) Up-hill (B) Down-hill (C) In low undulations (D) In plane areas

Last Answer : (A) Up-hill

Description : Diaphragm of a surveying telescope is held inside  (A) Eye-piece  (B) Objective  (C) Telescope tube at its mid point  (D) Telescope at the end nearer the eye-piece

Last Answer : (D) Telescope at the end nearer the eye-piece

Description : An internal focussing type surveying telescope, may be focussed by the movement of  (A) Objective glass of the telescope  (B) Convex-lens in the telescope  (C) Concave lens in the telescope  (D) Plano-convex lens in the telescope

Last Answer : (C) Concave lens in the telescope 

Description : Cross hairs in surveying telescopes, are fitted (A) In the objective glass (B) At the centre of the telescope (C) At the optical centre of the eye piece (D) In front of the eye piece

Last Answer : (D) In front of the eye piece

Description : The main principle of surveying is to work (A) From part to the whole (B) From whole to the part (C) From higher level to the lower level (D) From lower level to higher level

Last Answer : (B) From whole to the part

Description : While surveying a plot of land by plane tabling, the field observations (A) And plotting proceed simultaneously (B) And plotting do not proceed simultaneously (C) And recorded in field books to be plotted later (D) All the above

Last Answer : (A) And plotting proceed simultaneously

Description : The type of surveying which requires least office work is (A) Tachometry (B) Trigonometrical levelling (C) Plane table surveying (D) Theodolite surveying

Last Answer : (C) Plane table surveying

Description : The branch of surveying in which both horizontal and vertical positions of a point, are determined by making instrumental observations, is known (A) Tacheometry (B) Tachemetry (C) Telemetry (D) All the above

Last Answer : (D) All the above

Description : Which of the following methods of plane table surveying is used to locate the position of an inaccessible point? (A) Radiation (B) Intersection (C) Traversing (D) Resection

Last Answer : (B) Intersection

Description : In a solution of the three-point problem in plane table surveying, the converging of error is attained through : (a) Concyclic concept (b) Bessel’s method (c) Triangle of error (d) Tracing paper method

Last Answer : (c) Triangle of error

Description : Working from the whole to the part is followed as the fundamental principle of surveying so as to : 1. Distribute errors 2. Improve ease of working 3. Prevent accumulation of errors 4. Compensate error in a way 5. Refer to common datum ... (a) 1, 2 and 4 (b) 1, 3 and 5 (c) 3 and 4 (d) 2 and 5

Last Answer : (c) 3 and 4

Description : In a well planned city, the layout of distribution pipes generally adopted, is  (A) Grid-iron system  (B) Interlaced system  (C) Reticulation system  (D) All the above 

Last Answer : (D) All the above 

Description : What are the types of bearings are adopted for small motors and large motors?

Last Answer : Small motors (LT motors) Horizontal mounted - deep groove ball bearing at both ends. Medium motors Roller bearing at DE and deep groove bearing at NDE. Large motors (HT motors above 750 kW) Horizontal ... mounted - face to face angular contact ball bearing at NDE and roller or ball bearing at DE.

Description : Aluminium when adopted as a conductor material in ______ transformers, decreases the overall cost of the transformer (a) small size (b) medium size (c) large size (d) any of the above size

Last Answer : (a) small size

Description : Direct method of contouring is (A) A quick method (B) Adopted for large surveys only (C) Most accurate method (D) Suitable for hilly terrains

Last Answer : (C) Most accurate method

Description : Post tensioning system (A) Was widely used in earlier days (B) Is not economical and hence not generally used (C) Is economical for large spans and is adopted now a days (D) None of these

Last Answer : Answer: Option D

Description : A pre-stressed concrete member is preferred because (A) Its dimensions are not decided from the diagonal tensile stress (B) Large size of long beams carrying large shear force need not be adopted (C) Removal of cracks in the members due to shrinkage (D) All the above

Last Answer : Answer: Option D

Description : While measuring a chain line between two stations and intervened by a raised ground (A) Vision gets obstructed (B) Chaining gets obstructed (C) Both vision and chaining get obstructed (D) All the above

Last Answer : (A) Vision gets obstructed

Description : If the chain line which runs along N-S direction is horizontal and the ground in E-W direction is sloping (A) It is possible to set offsets correctly on east side (B) It is possible to ... possible to set offsets correctly on west side (D) It is possible to set offsets correctly on both sides

Last Answer : (D) It is possible to set offsets correctly on both sides

Description : Were these guys wrong to bring their dog to a crowded family Christmas get together?

Last Answer : Should have asked first and discussed it with you!

Description : If you make a negative statement in a crowded room, and someone assumes that you are talking about them, is it a personal attack?

Last Answer : Oh, man. I don’t know. If I say to the general atmosphere, “Stop beating a dead horse,” I suppose that even the horse might feel persecuted.

Description : A man starts shooting in a crowded theater, what do you do?

Last Answer : answer:Sitting here, thinking about it after the fact I like to think I would've tried to stop him. I like to think I would've found a sharp object, and somehow got behind him and just ... such a horrible situation out of the blue. Just a horrible situation. Hope they give the guy the chair.

Description : "And a woman gave birth to a baby and then bowled 257." Excerpt from a Crowded House song. Know of any other awe-inspiring achievements?

Last Answer : answer:Preface with: I'm not Vietnamese In Vietnamese history there are two sisters (Trong?) who led a rebellion against the Chinese in something like 23. They were historical figures, but many tidbits can ... fighting to retire a bit from the front line, give birth, and then went back to fighting.

Description : Someone is walking toward you , it's crowded. Who moves and why?

Last Answer : Many times I will move when I am in a hurry.Sometimes I will dance with people. A few times I have stood there like a brick wall if I am feeling sassy. It is all dependent on my mood.:)

Description : How crowded or how big is the 10K mansion?

Last Answer : I guess Brian you better find someone to share a bed with, maybe even get a threesome going. Isn’t that a man’s big dream?

Description : Do you like overcrowded site or less crowded site?

Last Answer : I'm voting on the less crowded site. It seems more intimate and close knit. I feel ask-public is a less crowded site and I enjoy the information and knowledge I have received and almost knowing ... of the jellies. Lots of information some laid back conversation and fun from a great group of people.

Description : Where is the least crowded, steepest, most fun place to ski around Tahoe?

Last Answer : answer:There aren’t many, but I’m a huge fan of Mammoth, if you want to go a little bit further: http://www.mammothmountain.com