What precaution should be taken while removing a current operated relay when the equipment is in service?

1 Answer

Answer :

Ensure that the CT is not getting opened by shorting the appropriate terminals. (Eventhough the terminals are automatically shorted once relay is removed the above point may carried out to ensure the same) 

Related questions

Description : Which of the following statements represents the FIRST precaution to be taken prior to working on any installed electrical component? A. Wear rubber gloves and boots. B. Use only approved nonconducting ... the machine before beginning any repairs. D. Open the supply circuits and tag the switches.

Last Answer : Answer: D

Description : What precaution is taken while developing a blog?

Last Answer : What precaution is taken while developing a blog?

Description : In accordance with Coast Guard Regulations (46 CFR), each battery operated relay-controlled lantern must _____________. A. be readily portable B. contain a dry cell battery having a minimum capacity of ... automatic battery charger to maintain the battery in a fully charged state D. all of the above

Last Answer : Answer: C

Description : The contacts operated by the D.C. relay coil shown in the illustration are located in the schematic diagram prints at coordinates ____________. EL-0100 A. '41Y' on this page B. '52M52M' and '52H35M' C. '57R' on this page D. '52N' on page '57R'

Last Answer : Answer: C

Description : The vertical dotted line connecting the small circular symbols at coordinates '05L', '09L', '13L', '21L', '25L', etc., shown in the illustration, indicate that all _______________. EL-0100 A. contacts are ... board 'TB2' C. wires are grounded at both ends of the line D. wires have a common shield

Last Answer : Answer: B

Description : Why CT operated over load relay is using for loads of high acceleration time upto 30 seconds? How it getting back?

Last Answer : The saturable current transformers linearly transforms the current upto twice the set current, but above this value the transformer core gets saturated and the secondary current is proportionally less. Thus ... overload. When current reduces the core gets de-saturated, as material design is such. 

Description : If reading AC current with the illustrated device and unsure of the range as a precaution , the first step should be to _________. EL-0047 A. secure power and test for voltage B. disconnect the ... resistance and use Ohm's law to calculate current D. unable to safely measure current with the device

Last Answer : Answer: A

Description : Induction cup relay is operated due to changes in (a) current (b) voltage (c) impedance (d) all of the above

Last Answer : (d) all of the above

Description : Which of the following should be the FIRST step in removing a generator from parallel operation? A. Trip the generator off the switchboard. B. Turn off all electrical equipment. C. Remove the load from the 'off going' generator. D. Increase the cycles of the generator staying on the line.

Last Answer : Answer: C

Description : Low voltage releases as used in some shipboard motor starter and control equipment will have which of the following characteristics? A. They trip circuit contactors when the motor starts to overspeed. B. ... coil of the starter. D. They allow the motor to restart upon restoration of normal voltage.

Last Answer : Answer: D

Description : 3. What precaution should be taken to avoid the overloading of domestic electric circuits? -Physics-10

Last Answer : A few of the precautions to be taken to avoid the overloading of domestic electric circuits are as follows: Connecting too many devices to a single socket should be avoided Using too many appliances at the same time should be avoided Faulty appliances should not be connected to the circuit

Description : What precaution should be taken after the dental implants treatment?

Last Answer : With good care dental implants can last a lifetime. Much like normal teeth hygiene is vital to keep them in good shape. It is especially important to clean then around the gum to prevent ... and considerable pain so if inflammation of the gum occurs professional advice should be sought right away.

Description : Pick up the correct statement from the following: (A) Mistakes arise from inattention, inexperience or carelessness (B) Systematic errors persist and have regular effects in the survey performances (C) Accidental errors occur inspite of every precaution is taken (D) All the above

Last Answer : (D) All the above

Description : Mention What Are The Precaution Measures Taken By The Repair And Maintenance Worker At Working Site?

Last Answer : The precaution measures taken at the working site is:  Overhead and side clearances are adequate to permit the safe operation of the lift truck  Aisles, floors and passageways should be ... of vapours from the refueling and operation of its lift trucks, workplace should be adequately ventilated.

Description : What safety precaution must be taken before replacing a transistor?

Last Answer : The power must be removed from the circuit.

Description : Suggest precaution to be taken during demolition.

Last Answer : Following precaution to be taken during demolition: 1. Complete evacuation of building including pets and other animals. 2. Careful study of the building. 3. Emptying of surrounding area. ... explosive. 8.Action plan already prepared if explosion goes wrong or only partial explosion occur.

Description : A diesel driven emergency generator is prevented from being paralleled with the ship's service generators by __________. A. an electrical interlock system B. an automatic paralleling trip switch C. the synchronizing oscilloscope D. the reverse current relay

Last Answer : Answer: A

Description : Which of the following precautions should be taken when a blown fuse, rated at 10 amperes, is replaced? A. Short out the fuse before removing it from the circuit. B. Use needle-nose pliers to ... D. Fuses of 10 ampere rating and less are virtually harmless when energized and may be handled freely.

Last Answer : Answer: C

Description : When troubleshooting electronic equipment, the FIRST step to be taken before testing the circuit voltage is to _________. A. set the meter to the lowest range B. check the voltage supply from the power source C. remove the suspected component D. check the current flow through the circuit

Last Answer : Answer: B

Last Answer : Induction cup relay is operated due to changes in current, voltage, impedance.

Description : When a console indicating lamp burns out, attempts to renew it should not be made while maneuvering because _______________. A. the new lamp may be of a higher wattage and cause heat damage to the lens ... D. a socket/wiring fault may cause a ground or short circuit to shut down a vital function

Last Answer : Answer: D

Description : If a three-phase induction motor is operated under a light load and it develops an open in one of its supply lines, the motor will _____________. A. continue to run, but will vibrate and have reduced ... speed up due to the reduced number of poles C. run cooler due to reduced current flow D. stop

Last Answer : Answer: A

Description : The 'safe switch' of the winch controller shown in the illustration is operated _______________. EL-0102 A. through the master switch handle B. when heater circuit current is high C. by contactor coil 'FR' D. manually by the winch operator

Last Answer : Answer: D

Description : If an induction motor were to be operated at 90% rated voltage, _____________. A. there would be an increase in starting torque B. starting current would increase slightly C. synchronous speed would decrease slightly D. the slip would increase

Last Answer : Answer: D

Description : The simplest method of controlling the terminal voltage of compound-wound DC generator is with a _____________. A. hand-operated field rheostat connected in series with the shunt field circuit B. ... in series with the load D. balance coil diverting neutral current through the shunt field

Last Answer : Answer: A

Description : A loss of field excitation to an AC generator while operating in parallel will cause it to ____________. A. absorb more and more load due to decreased armature reaction B. lose its load due to ... polarity D. lose its load, begin to motorize, trip out on reverse power relay, and possibly overspeed

Last Answer : Answer: D

Description : The purpose of the reverse power relay, provided on a ship's service alternator panel, is to trip the circuit in the event of ______________. A. main circuit overload B. high power transfer C. generator overspeeding D. alternator motorization

Last Answer : Answer: D

Description : Which equipment is used for weeding in Row crops in rain fed. a) Puddy cono weeder b) Engine operated weeder c) Dry land weeder d) Seed drill

Last Answer : Dry land weeder

Description : equipment is used for wedding in between rows of standing crops. a) Engine operated weeder b) Cono weeder for puddy c) Junior how d) Dry land weeder

Last Answer : Junior how

Description : What equipment would be needed for a wallpaper job involving removing several layers of old wallpaper?

Last Answer : There are a few methods for removing old wall paper. In my experience the best route is to use a wallpaper steamer. These machines apply hot steam to the wall to heat up, moisten, and loosen the old ... glue remover and a scrapper will be the best way. This can be a time consuming and tedious task.

Description : . The most suitable equipment for removing the fine dust particle (< 1 micron dia.) from air below its dew point will be a/an (A) Bag filter (B) Electrostatic precipitator (C) Cyclone separator (D) Wet scrubber

Last Answer : (B) Electrostatic precipitator

Description : When an operating motor is connected to the controller shown in the illustration, the a path of current flow through the circuit is ____________. EL-0010 A. 'L1', stop button, start button, coil 'CR', 'L2' B. 'L1' ... L2' D. 'L1', stop button, start button, 'CR' contact, 'M' contact, 'CR' coil, 'L2'

Last Answer : Answer: B

Description : Which of the listed procedures is the best way to tell if a motor has become overloaded? A. Measure the current flow and compare it with the motor full load current flow as shown on the nameplate. ... Watch for telltale signs of smoke coming from the motor. D. Periodic opening of the O/L relay coil

Last Answer : Answer: A

Description : A reverse-current relay will prevent AC generator motorization by ____________. A. automatically redirecting the load B. automatically speeding up the prime mover C. tripping the panel board main switch D. tripping the generator circuit breaker

Last Answer : Answer: D

Description : Equal power factors on paralleled AC generators are maintained by an automatic _____________. A. voltage regulator B. reverse power relay C. reverse current relay D. governor control switch

Last Answer : Answer: A

Description : A loud buzzing noise in an AC controller is probably caused by _____________. A. poor contact with the overload relay B. an incorrectly sized heater C. a broken shading coil D. abnormal starting current

Last Answer : Answer: C

Description : If a magnetic controller relay fails to drop out when the coil voltage is removed from the relay, the probable cause may be _____________. A. excessive spring tension B. overvoltage C. excessive current D. welded contacts

Last Answer : Answer: D

Description : Protection against sustained overloads occurring in molded-case circuit breakers is provided by a/an __________. A. overvoltage release B. thermal acting trip C. thermal overload relay D. current overload relay

Last Answer : Answer: B

Description : Which of the following statements represents the main difference between a relay and a contactor? A. Contactors control current and relays control voltage. B. A relay is series connected and a contactor ... loads than relays. D. Contactors are made from silver and relays are made from copper.

Last Answer : Answer: C

Description : What is the difference between over voltage relay and over current relay?

Last Answer : A:The current increases not only for over voltages but also for under voltage(As most of the loads are non-linear in nature). So,the over voltage protection & over current protection are completely ... , for a better protection of the system.It should have both over voltage & over current relay.

Description : When voltage increases then current also increases then what is the need of over voltage relay and over current relay? Can we measure over voltage and over current by measuring current only?

Last Answer : No. We can't sense the over voltage by just measuring the current only because the current increases not only for over voltages but also for under voltage (As most of the loads are non-linear in ... So, for a better protection of the system. It should have both over voltage & over current relay.

Description : What is the advantage of CMM relay over normal Inv. O/C current relay?