Which of the following has the greatest effect on product's reliability and maintenance 

characteristic?

1. conceptualization 

2. product design 

3. fabrication 

4. a and b

1 Answer

Answer :

4. a and b

Related questions

Description : Which stage of project management life cycle requires the maximum time of  completion  A.Conceptualization  B.Planning  C.Execution  D.Estimation

Last Answer : C.Execution

Description : In the maintenance phase the product must be tested against  previous test cases. This is known as testing. (a) Unit (b) Integration (c)Regression (d) Module (e) Beta

Last Answer : (c)Regression

Description : Choose an internal quality from given below: a) scalability b) usability c) reusability d) reliability

Last Answer : c) reusability

Description : Which of the following is true regarding the project scope statement? A. The project scope statement includes a change control system that describes how to  make changes to the ... reliability of the project scope and describes  the process for verifying and accepting completed deliverables.

Last Answer : B. The project scope further elaborates the Initiating processes and serves as a basis  for future project decisions.

Description : Using the R&D Spreadsheet to design your products, you have which of the following projects to choose from? a. Repositioning b. Invention c. Reliability adjustment d. All of the above e. None of the above

Last Answer : d. All of the above

Description : Configuration management is best described as: a. control in the implementation of changes to project schedules. b. an organization to review proposed changes to the project deliverables ... and documentation. d. creation, maintenance and controlled change of the project deliverables.

Last Answer : d. creation, maintenance and controlled change of the project deliverables.

Description : Object inherits a class is known as . a. Maintenance b. Operations c. Transitional d. Development

Last Answer : b. Operations

Description : Configuration management is best described as:  a. control in the implementation of changes to project schedules.  b. an organisation to review proposed changes to the project deliverables ... and documentation.  d. creation, maintenance and controlled change of the project deliverables.

Last Answer : d. creation, maintenance and controlled change of the project deliverables.

Description : Which one of the following statements best defines procurement? a. A technique to establish the best approach for obtaining the resources for the project. b. A group of interrelated resources and ... product. d. The process by which products and services required for the project are acquired.

Last Answer : d. The process by which products and services required for the project are acquired.

Description : Which one of the following statements best defines the purpose of a Product Breakdown Structure (PBS)? a. To define the hierarchy of deliverables that are required to be produced on the project. ... . d. To identify the health and safety strategies and procedures to be used on the project

Last Answer : a. To define the hierarchy of deliverables that are required to be produced on the project.

Description : Which one of the following statements best defines procurement?  a. A technique to establish the best approach for obtaining the resources for the project.  b. A group of interrelated resources and ... product.  d. The process by which products and services required for the project are acquired.

Last Answer : d. The process by which products and services required for the project are acquired.

Description : Which one of the following statements best defines the purpose of a Product Breakdown  Structure(PBS)?  a. To define the hierarchy of deliverables that are required to be produced on the project.  b. ... .  d. To identify the health and safety strategies and procedures to be used on the project.

Last Answer : a. To define the hierarchy of deliverables that are required to be produced on the project.

Description : One of the greatest weaknesses of systems consulting firms is that they try to apply  estimates and methodologies that they have developed over time and applied to other  projects, most of which are very different from the current project.

Last Answer : Ans: False

Description : ncreasing a product’s reliability will result in which of the following changes to production costs? a. Lower material cost b. Higher material cost c. Higher labor costs d. Lower labor costs e. Reducing MTBF has no effect on costs of production

Last Answer : b. Higher material cost

Description : Which of the following is a personal characteristic that reflects the  truthfulness of an individual that can be checked against observable facts? Select one: a. Objective credibility b. Attribution ... c. Non-manipulative trust d. High cost of lying e. Acknowledgment of munificence

Last Answer : a. Objective credibility

Description : When a record is made of an actual measured quality characteristic, such as a dimension  expressed with thousands of an inch, the quality is said to be expressed by: 1. traits  2. variables  3. attributes  4. properties

Last Answer : 2. variables

Description : What Is Reliability Centered Maintenance?

Last Answer : Reliability Centered Maintenance (RCM) was initiated by the commercial aviation industry and then adopted by the U.S. military in the 1970s and then by the U.S. commercial nuclear power industry ( ... means to maintain the functions a user may require of machinery in a defined operating context''.

Description : Which of the following circuit breakers has high reliability and minimum maintenance ? (a) Air blast circuit breakers (b) Circuit breaker with SF6 gas (c) Vacuum circuit breakers (d) Oil circuit breakers

Last Answer : (b) Circuit breaker with SF6 gas

Description : Which of the following circuit breakers has high reliability & minimum maintenance?  (A) Bulk oil type CB (B) Air blast CB (C) Vacuum CB (D) Sulphur hexafluoride CB 

Last Answer : Which of the following circuit breakers has high reliability & minimum maintenance?  (A) Bulk oil type CB (B) Air blast CB (C) Vacuum CB (D) Sulphur hexafluoride CB 

Description : In the Capstone® simulation, what are the components of a product's material cost? a. Cost of Inventory on hand and the cost to store it b. Reliability component cost and positioning component ... , shipping and handling d. Level of automation and product reliability e. None of the above

Last Answer : b. Reliability component cost and positioning component cost

Description : In the Marketing Plan, Research and Development addresses all but the: a. placement of each product inside a market segment circle. b. number of products in each segment. c. age of your products. d. automation of assembly lines. e. reliability of each product.

Last Answer : d. automation of assembly lines.

Description : Which of the following is not addressed by R&D? a. Age b. Reliability c. Number of products in each segment d. Placement of each product inside a market segment e. Workforce Complement

Last Answer : e. Workforce Complement

Description : What’s the measure for product reliability? a. Return rates of products sold b. Customers’ happiness statements c. Expected time a product lasts d. Price e. All of the above

Last Answer : c. Expected time a product lasts

Description : In the passage which characteristic of Macbeth and has the greatest effect on the development of the scene?

Last Answer : What is the answer ?

Description : Design phase consist of (A) Input received (B) Output received (C) Both (A) and (B) (D) None of the above

Last Answer : (C) Both (A) and (B)

Description : Following are the phases of Project Management Life Cycle. Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (A) 3-2-1-4

Description : Once project planning is complete, project managers document their plan in A. SPMP document B. SRS document C. Detailed Design document D. Excel Sheet

Last Answer : A. SPMP document

Description : Which property of the rapid prototype is not important? a) The speed with which it can be developed b) The speed with which it can be modified c) Its ability to determine the client's real needs d) The ... from it, even if they are of the how not to do it' variety e) Its internal structure.

Last Answer : c) Its ability to determine the client’s real needs

Description : Which model is used during early stages of the system  design afterthe requirements have been established? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : d) An early design model

Description : Which model assumes that systems are created fromreusable  components, scripting or database programming? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : a) An application-composition model

Description : The life cycle can be said to consist of a series of phases. The  classical model is referred to as the waterfall model. Which phase  may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation

Last Answer : (a) Requirements

Description : Which model is used to compute the effort required to  integrate reusable components or program code that is  automatically generated by design or program translation  tools? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : c) A reuse model

Description : Which of the following is a requirement management activity ? a) Investigation b) Design c) Construction and Test d) All of the mentioned

Last Answer : d) All of the mentioned

Description : Which one of the following is not a fundamental activity for processes in engineering ? a) Verification b) Validation c) design and implementation d) evolution e) specification

Last Answer : a) Verification

Description : Arrange the following steps to form a basic Engineering  Process Model. i. Test ii. Design iii. Install iv. Specification v. Manufacture vi. Maintain a) 2, 4, 5, 1, 6, 3 b) 4, 2, 5, 1, 3, 6 c) 2, 4, 5, 1, 3, 6 d) 4, 2, 5, 1, 6, 3

Last Answer : a) 2, 4, 5, 1, 6, 3

Description : Design phase consist of (A)Input received (B)Output received (C)Both (A) and (B) (D)None of the above

Last Answer : (C)Both (A) and (B)

Description : Following are the phases of Project Management Life Cycle.  Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery  (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (D) 4-3-2-1

Description : For the best model suitable for the project, in which of the phase  the developers decide a roadmap for project plan? a. Design b. System Analysis c. Coding d. Testing

Last Answer : b. System Analysis

Description : Upper CASE tools are used to create diagrams and generate code for database tables  system functionality during the design phase.

Last Answer : Ans: False

Description : Estimates from the planning stage will need to be refined as the project progresses,  because it is virtually impossible to develop an exact assessment of the project’s schedule  before the analysis and design phases are conducted.

Last Answer : Ans: True

Description : When estimating project time schedules using industry standards for a systems project,  the following values are acceptable: 15% for planning, 25% for analysis, 50% for design,  and 10% for implementation.

Last Answer : Ans: False

Description : Traditional Work Breakdown Structures tend to  a. focus on the design of the system as oppose to the needs of the current phase and  iteration  b. force too many levels of detail early on for large ... project and difficult to compare across projects  d. all of the above  e. none of the above

Last Answer : d. all of the above

Description : What are the types of express guarantees? 1. Design/ mechanical  2. Field workmanship  3. Common Work 4. Length of service  5. a and b

Last Answer : 5. a and b

Description : )Which of the following fit the category of external risks? 1. Project delays, budget under-runs, movement of city utilities  2. Regulatory, currency changes, taxation  3. Natural disasters, ... , design, social impact  5. Political unrest, budget overruns, size and complexity of the project

Last Answer : 2. Regulatory, currency changes, taxation

Description : When is the project's amount at stake the lowest 1. conceptual  2. design  3. close-out  4. implementation

Last Answer : 1. conceptual

Description : In which of the following project phases is the project schedule developed? 1. Conceptual  2. Planning  3. Implementation  4. Design

Last Answer : 2. Planning

Description : This characteristic often draws the line between what is feasible and what is impossible. a) Performance b) System Evaluation c) Modularity d) Reliability

Last Answer : Answer: a Explanation: Algorithms help us to understand scalability. Performance often draws the line between what is feasible and what is impossible

Description : In computer networks _________ is a characteristic that a flow needs where Lack of it means losing a packet or acknowledgment, which entails retransmission. A. Reliability B. Delay C. Jitter D. Bandwidth

Last Answer : A. Reliability

Description : Which type of reliability refers to the consistency of a group of individuals' scores on two equivalent forms of a test designed to measure the same characteristic? a. Split-half b. Test-retest c. Split-forms d. Equivalent forms