Is Cpm software available on the internet?

1 Answer

Answer :

Yes, CPM software is available on the internet. 3d2f.com/tags/cpm/pert/ is a website with free CPM softward downloads. Yes, CPM software is available on the internet. There are many different companies that provide the software at different prices. You can look at the various places to see what requirements you need.

Related questions

Description : _________ technique helps to make a choice from numerous available alternatives a. PERT b. CPM c. Linear Programming d. Transportation

Last Answer : d. Transportation

Description : What's the average CPM for banner ads?

Last Answer : It depends on the traffic. Not only how many, but also if they are recurring or new. Do you know the rate of unique users, in relation to repeats? Most ads I’ve seen cost a few cents per viewing, with an additional charge per click.

Description : Printer resolution is usually measured in ________ A. Characters Per Minute (CPM) B. Pixels Per Inch (PPI) C. Pages Per Minute (PPM) D. Dots Per Inch (DPI)

Last Answer : D. Dots Per Inch (DPI)

Description : Which Unit is used to measure the speed of a printer? A. DPI B. CPM C. PPM D. None of the Above

Last Answer : C. PPM

Description : Why PERT is preferred over CPM for evaluation of project ?

Last Answer : PERT is based on the approach of multiple time estimates for each activity.

Description : For an activity in a CPM analysis, the early Finish time is 13 and the late Finish time  is 13. Duration of activity is 6. Which of the following statements is true?  A.The early start is 6 B. ... of the activity is 13  C.The slack of this activity is 13  D.The activity is on the critical path

Last Answer : D.The activity is on the critical path

Description : The particular task performance in CPM is known  A.Dummy  B.Event  C.Activity  D.Contract.

Last Answer : C.Activity

Description : Which of the following statements is true? A. PERT is considered as a deterministic approach and CPM is a probabilis t ic techniques. B. PERT is considered as a probabilistic techniques ... and CPM are both probabilistic techniques. D. PERT and CPM are both considered as deterministic approachs

Last Answer : B. PERT is considered as a probabilistic techniques and CPM is considered as a deterministic approach

Description : Which term is CPM refer to ? 1. Cost per hundred 2. Cost per Million 3. Cost per Thousand 4. Cost per Clic

Last Answer : Cost per Million

Description : What are the units used to count the speed of a printer? 1) CPM 2) DPI 3) PPM 4) BIT

Last Answer : 4) BIT

Description : A continuous passive motion (CPM) device applied after knee surgery a) promotes healing by increasing circulation and movement of the knee joint. A CPM device applied after knee surgery ... applied after knee surgery promotes healing by increasing circulation and movement of the knee joint.

Last Answer : a) promotes healing by increasing circulation and movement of the knee joint. A CPM device applied after knee surgery promotes healing by increasing circulation and movement of the knee joint.

Description : The basic difference between PERT and CPM is that a. PERT deals with events and CPM with activities b. Critical Path is determined in PERT only c. Costs are considered on CPM only d. Guessed times are used in PERT and evaluated times in CPM.

Last Answer : a. PERT deals with events and CPM with activities

Description : The CPM was developed by Rand and Walker in which year? a. 1957 b. 1958 c. 1959 d. 1960

Last Answer : a. 1957

Description : What is the benefit of using PERT/CPM network as integral component of project management? a. They furnish a consistent framework for planning, scheduling, monitoring and controlling project b. They illustrate ... that the project will be completed by a specific date d. All of the above

Last Answer : d. All of the above

Description : CPM is (A) Synthesising in concepts (B) Is built of activities oriented programme (C) Is based on time estimate (D) All the above

Last Answer : (D) All the above

Description : The first method invented for planning projects, was (A) Bar chart method (B) Milestone chart (C) Critical path method (CPM) (D) Programme Evaluation and Review Technique (PERT)

Last Answer : (A) Bar chart method

Description : Completion of an activity on CPM network diagram, is generally known (A) Event (B) Node (C) Connector (D) All the above

Last Answer : (D) All the above

Description : A CPM family includes (A) CPA (Critical Path Analysis) (B) CPP (Critical Path Plotted) (C) MCE (Minimum Cost Expenditure) (D) All the above

Last Answer : (D) All the above

Description : _____ technique is related to Inventory management a. EOQ b. SQC c. CPM d. transportation

Last Answer : a. EOQ

Description : ________ technique is related to Quality control a. Assignment b. Transportation c. CPM d. SQC

Last Answer : d. SQC

Description : ______ are technique applied in project management a. CPM b. Assignment c. Transportation d. Decision theory

Last Answer : a. CPM

Description : Select the correct statement. (A) Activity arrows in a CPM network are drawn to scale (B) The tail of an arrow represents the finish of an activity (C) Arrow bead represents the start of an activity (D) None of the above

Last Answer : (D) None of the above

Description : In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having (A) Longest duration (B) Highest cost slope (C) Least cost slope (D) Shortest duration

Last Answer : (C) Least cost slope

Description : ................... is an event oriented network diagram. a. CPM b. PERT c. Histogram d. Ogive

Last Answer : b. PERT

Description : ......................... is activity oriented network diagram. a. CPM b. PERT c. Histogram d. Ogive

Last Answer : a. CPM

Description : CPM stands for____________. A. Continuous Path Method. B. Clear Path Method. C. Critical Path Method. D. Critical Probabilistic Method.

Last Answer : C. Critical Path Method.

Description : ______________ is an activity-oriented approach. A. CPM B. PERT C. GERT D. WASP

Last Answer : A. CPM

Description : _____________ is an event-oriented approach . A. CPM. B. GERT. C. PERT. D. WASP.

Last Answer : 1

Description : Which of the following is a SaaS characteristic? a) The typical license is subscription-based or usage-based and is billed on a recurring basis b) The software is available over the Internet ... The software and the service are monitored and maintained by the vendor d) All of the mentioned

Last Answer : All of the mentioned

Description : This is a software distribution model in which applications are hosted by a vendor or service provider and made available to customers over a network, typically the Internet. A. Platform as a Service (PaaS) B. Infrastructure as a Service (IaaS) C. Software as a Service (SaaS).

Last Answer : Software as a Service (SaaS).

Description : Which of the following is a SaaS characteristic? A. The typical license is subscription-based or usage-based and is billed on a recurring basis B. The software is available over the Internet globally ... . The software and the service are monitored and maintained by the vendor D. All of the above

Last Answer : All of the above

Description : Which of the following is a SaaS characteristic? a) The typical license is subscription-based or usage-based and is billed on a recurring basis b) The software is available over the Internet globally ... The software and the service are monitored and maintained by the vendor d) All of the mentioned

Last Answer : All of the mentioned