CPM is
(A) Synthesising in concepts
(B) Is built of activities oriented programme
(C) Is based on time estimate
(D) All the above

1 Answer

Answer :

(D) All the above

Related questions

Description : The first method invented for planning projects, was (A) Bar chart method (B) Milestone chart (C) Critical path method (CPM) (D) Programme Evaluation and Review Technique (PERT)

Last Answer : (A) Bar chart method

Description : In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having (A) Longest duration (B) Highest cost slope (C) Least cost slope (D) Shortest duration

Last Answer : (C) Least cost slope

Description : ................... is an event oriented network diagram. a. CPM b. PERT c. Histogram d. Ogive

Last Answer : b. PERT

Description : ......................... is activity oriented network diagram. a. CPM b. PERT c. Histogram d. Ogive

Last Answer : a. CPM

Description : ______________ is an activity-oriented approach. A. CPM B. PERT C. GERT D. WASP

Last Answer : A. CPM

Description : _____________ is an event-oriented approach . A. CPM. B. GERT. C. PERT. D. WASP.

Last Answer : 1

Description : What is the benefit of using PERT/CPM network as integral component of project management? a. They furnish a consistent framework for planning, scheduling, monitoring and controlling project b. They illustrate ... that the project will be completed by a specific date d. All of the above

Last Answer : d. All of the above

Description : Pick up the correct statement from the following: (A) Programme Evaluation and Review Technique, is event oriented (B) Programme Evaluation and Review Technique is not event oriented (C) Critical Path Method is event oriented (D) Critical Path method is event oriented

Last Answer : (A) Programme Evaluation and Review Technique, is event oriented

Description : The architecture for _______ is built on the concepts of shared-nothing and messaging-based information exchange. a) HDFS b) Chabby c) Nova d) BigTable

Last Answer : Nova

Description : The architecture for _______ is built on the concepts of shared-nothing and messaging-based information exchange. a) HDFS b) Chabby c) Nova d) BigTable

Last Answer : Nova

Description : The basic difference between PERT and CPM is that a. PERT deals with events and CPM with activities b. Critical Path is determined in PERT only c. Costs are considered on CPM only d. Guessed times are used in PERT and evaluated times in CPM.

Last Answer : a. PERT deals with events and CPM with activities

Description : Object-oriented concepts are not new. The first OO language was  considered to be a) ALGOL-68 B) FORTRAN 77 c) CMODULA d) SIMULA 67.

Last Answer : d) SIMULA 67.

Description : Explain various Object Oriented concepts used in Software Engineering. Give an example.

Last Answer : Ans .Various concepts of Object Oriented concepts used in Software Engineering: Object:- An object is something which is capable of being seen, touched or sensed. Each object has certain distinctions ... . A message can be sent between two objects only if they have an association between them.

Description : Why does the software design improve when we use object-oriented concepts?

Last Answer : Ans. The software design improves when we use object-oriented concepts because 1.Object-orientation works at higher level of abstraction. The development can proceed at the object level and ... good programming techniques. 4.Object-oriented programming design and programming promote code re-use.

Description : State the concepts of object oriented programming.

Last Answer : Basic Concepts of Object Oriented Programming:  1. Objects  Objects are the basic run time entities in an object-oriented system. They may represent a person, a place, a ... objects that communicate with each other. Objects communicate with one another by sending and receiving information.

Description : Which of the following is true about management meetings? Select one: a. They are short meetings to develop a common understanding of what the short-term  priorities are for the project. ... , tracking progress of existing plans, and  making adjustments to plans in response to new information.

Last Answer : e. They are oriented toward developing plans, tracking progress of existing plans, and  making adjustments to plans in response to new information.

Description : Polyadenylate tail is not present in mRNA synthesising (A) Globin (B) Histone (C) Apoferritin (D) Growth hormone

Last Answer : Answer : B

Description : Reverse transcriptase is capable of synthesising (A) RNA → DNA (B) DNA → RNA (C) RNA → RNA (D) DNA → DNA

Last Answer : Answer : A

Description : Mitochondria and chloroplast are (A) semi-autonomous organelles (B) formed by division of pre-existing organelles and they contain DNA but lack protein synthesising machinery. Which one of the following options is correct? (a) ( ... Both (A) and (B) are correct. (d) (B) is true but (A) is false.

Last Answer : (a) (A) is true but (B) is false.

Description : Pick up the correct statement from the following: (A) Optimistic time estimate refers to activities (B) Pessimistic time estimate refers to activities (C) Most likely time estimate refers to activities (D) All the above

Last Answer : (D) All the above

Description : Completion of an activity on CPM network diagram, is generally known (A) Event (B) Node (C) Connector (D) All the above

Last Answer : (D) All the above

Description : A CPM family includes (A) CPA (Critical Path Analysis) (B) CPP (Critical Path Plotted) (C) MCE (Minimum Cost Expenditure) (D) All the above

Last Answer : (D) All the above

Description : Select the correct statement. (A) Activity arrows in a CPM network are drawn to scale (B) The tail of an arrow represents the finish of an activity (C) Arrow bead represents the start of an activity (D) None of the above

Last Answer : (D) None of the above

Description : What is the different between the generalist and specialist concepts of law enforcement activities?

Last Answer : Need answer

Description : Which of the following methods is used to estimate flood discharge based on high water marks left over in the past? (A) Slope-area method (B) Area-velocity method (C) Moving boat method (D) Ultrasonic method

Last Answer : Answer: Option A

Description : The work of setting up objectives for selling activities, determining and scheduling the steps necessary to achieve these objectives is known as…………. A. Selling B. Sales policy C. Sales programme D. Sales planning

Last Answer : D. Sales planning

Description : Edco Ltd. is preparing a written document specifying the framework and actions for implementing and controlling marketing activities. This document is called the A)profit centre. B)marketing programme. C)strategic market programme. D)strategic business plan. E)marketing plan.

Last Answer : E)marketing plan.

Description : The primary purpose of the inclusion of out of class activities as part of the overall school programme is Options: A) To meet accreditation requirements B) To keep children under ... pupil's self realization D) To provide students with a means of acceleration through earning extracredits

Last Answer : C) To provide other avenues of pupil's self realization 

Description : A marketing plan A)is characteristic of production -oriented firms and other mass producers. B)provides a framework for implementing and controlling marketing activities. C)always increases the marketing ... are short -term in orientation. E)restricts the marketing manager's future options.s.

Last Answer : B)provides a framework for implementing and controlling marketing activities

Description : Which one of the following statements, related to the requirements phase in Software Engineering, is incorrect ? (A) Requirement validation is one of the activities in the requirements phase. (B) ... . (D) Function points is one of the most commonly used size metric for requirements. 

Last Answer : (C) “Modelling-oriented approach” is one of the methods for specifying the functional specifications. 

Description : An insulation manufacturer talks to an executive at Wimpey to find out how much insulation material the company intents to use in building homes next year and then multiplies the estimate by the number ... --- approach to measure sales potential. A)use of product B)breakdown C)correlation D)buildup

Last Answer : D)buildup

Description : Which of the following may generate a milestone list: A. Define Activities B. Sequence Activities C. Estimate Activity Resources D. Estimate Activity Durations

Last Answer : A. Define Activities

Description : Which of the following does NOT generate changes to the Project documents: A. Define Activities B. Sequence Activities C. Estimate Activity Resources D. Estimate Activity Durations

Last Answer : A. Define Activities

Description : The budgeted cost for all the activities in a project with the help of Earned Value  Method is  A. Actual Cost  B. Budget at completion  C. Budget for completion  D. Estimate at completion

Last Answer : D. Estimate at completion

Description : Which of the following may generate a milestone list: A. Define Activities B. Sequence Activities C. Estimate Activity Resources D. Estimate Activity Durations

Last Answer : A. Define Activities

Description : Some scientists‘ estimate that in nature, _____ of all microbial activities occur in biofilms. a. 0.25 b. 0.33 c. 0.45 d. 0.6 e. 0.99

Last Answer : e. 0.99

Description : …… is a tool to estimate the cost or necessary efforts for projects, work packages or activities in project management. 1. Cost budgeting 2. cost control 3. Cost analysis 4. Resource Planning

Last Answer : Cost budgeting

Description : Which of the following concepts of materiality is incorrect? a. Materiality is based on quantitative and non-quantitative factors. b. Materiality is a matter of professional audit judgment. c ... . Materiality is more closely related to the fieldwork and reporting standards than to general standards

Last Answer : Materiality does not apply if internal control is highly effective

Description : For an activity in a CPM analysis, the early Finish time is 13 and the late Finish time  is 13. Duration of activity is 6. Which of the following statements is true?  A.The early start is 6 B. ... of the activity is 13  C.The slack of this activity is 13  D.The activity is on the critical path

Last Answer : D.The activity is on the critical path

Description : What's the average CPM for banner ads?

Last Answer : It depends on the traffic. Not only how many, but also if they are recurring or new. Do you know the rate of unique users, in relation to repeats? Most ads I’ve seen cost a few cents per viewing, with an additional charge per click.

Description : Is Cpm software available on the internet?

Last Answer : Yes, CPM software is available on the internet. 3d2f.com/tags/cpm/pert/ is a website with free CPM softward downloads. Yes, CPM software is available on the internet. There are many different ... software at different prices. You can look at the various places to see what requirements you need.

Description : Printer resolution is usually measured in ________ A. Characters Per Minute (CPM) B. Pixels Per Inch (PPI) C. Pages Per Minute (PPM) D. Dots Per Inch (DPI)

Last Answer : D. Dots Per Inch (DPI)

Description : Which Unit is used to measure the speed of a printer? A. DPI B. CPM C. PPM D. None of the Above

Last Answer : C. PPM

Description : Why PERT is preferred over CPM for evaluation of project ?

Last Answer : PERT is based on the approach of multiple time estimates for each activity.

Description : The particular task performance in CPM is known  A.Dummy  B.Event  C.Activity  D.Contract.

Last Answer : C.Activity

Description : Which of the following statements is true? A. PERT is considered as a deterministic approach and CPM is a probabilis t ic techniques. B. PERT is considered as a probabilistic techniques ... and CPM are both probabilistic techniques. D. PERT and CPM are both considered as deterministic approachs

Last Answer : B. PERT is considered as a probabilistic techniques and CPM is considered as a deterministic approach

Description : Which term is CPM refer to ? 1. Cost per hundred 2. Cost per Million 3. Cost per Thousand 4. Cost per Clic

Last Answer : Cost per Million

Description : What are the units used to count the speed of a printer? 1) CPM 2) DPI 3) PPM 4) BIT

Last Answer : 4) BIT

Description : A continuous passive motion (CPM) device applied after knee surgery a) promotes healing by increasing circulation and movement of the knee joint. A CPM device applied after knee surgery ... applied after knee surgery promotes healing by increasing circulation and movement of the knee joint.

Last Answer : a) promotes healing by increasing circulation and movement of the knee joint. A CPM device applied after knee surgery promotes healing by increasing circulation and movement of the knee joint.

Description : The CPM was developed by Rand and Walker in which year? a. 1957 b. 1958 c. 1959 d. 1960

Last Answer : a. 1957