What are the units used to count the speed of a printer?
1) CPM
2) DPI
3) PPM
4) BIT

1 Answer

Answer :

4) BIT

Related questions

Description : Which Unit is used to measure the speed of a printer? A. DPI B. CPM C. PPM D. None of the Above

Last Answer : C. PPM

Description : Printer resolution is usually measured in ________ A. Characters Per Minute (CPM) B. Pixels Per Inch (PPI) C. Pages Per Minute (PPM) D. Dots Per Inch (DPI)

Last Answer : D. Dots Per Inch (DPI)

Description : Printer resolution is a numerical measure of print quality that is measured in _______ A. Pages Per Minute (PPM) B. Lines Per Minute (LPM) C. Characters Per Second (CPS) D. Dots Per Inch (DPI)

Last Answer : D. Dots Per Inch (DPI)

Description : If a printer is to have a resolution of 600 dpi what does its means?

Last Answer : dpi means dots per inch. If you were to print a straight lineone inch long using the max print setting (600 dpi for yourprinter) that line would consist of 600 dots. Fairly high qualityimage

Description : Which portable printer has the highest dpi?

Last Answer : Kodak and HP have the highest dpi and they also offers great prices on printer and photo ink and they offer the most sheets when you are printing your photos.

Description : The appearance of an image on a website is dependent upon? A. The DPI of the printer B. The SPI of the printer C. The PPI of the monitor D. The SPI of the monitor

Last Answer : C. The PPI of the monitor

Description : Chemical shifts (δ) are typically reported in units of A. Gauss (G) B. Millitesla per meter (mT/m) C. Parts per million (ppm) D. Percent (%)

Last Answer : Parts per million (ppm) 

Description : When configuring the subnet mask for an IP address, which formats can be used? * dotted-decimal. * Hexadecimal * Bit-count * Octal * Binary

Last Answer : Correct answer: A, B &C

Description : A 4 bit counter is used to count from 0,1,2...n. Value of “n” is

Last Answer : A 4 bit counter is used to count from 0,1,2...n. Value of “n” is 15

Description : How do I fix the DPI scaling on my laptop?

Last Answer : answer:Wow, so, I tried entering Safe Mode to fix my computer (someone on another site said to try adjust the text size on Safe Mode) and I must've pressed something wrong during the setup I restarted it and ... ll be returning it as soon as possible. I don't know what the hell is going on, but wow.

Description : How do i change the dpi of a jpeg?

Last Answer : You’re going to lose a lot of quality if you do that; do you not have the original Illustrator/Photoshop file?

Description : Removal of Windows Service Pack 3 has messed up my Screen DPI?

Last Answer : 1. Start > Control Panel > Display > Settings (tab) 2. Move the Screen Resolution slider to the right as desired. 3. Click OK.

Description : What is the full form of 'DPI' ? -How To ?

Last Answer : The full form of 'DPI' is Dubai Ports International

Description : What is the full form of 'DPI' ? -How To ?

Last Answer : The full form of 'DPI' is Dot Per Inch, Data Per Inch

Description : What is the full form of 'DPI' ? -How To ?

Last Answer : The full form of 'DPI' is Director of Public Instructions

Description : What is the full form of DPI ?

Last Answer : DPI Full Director of Public Instructions.

Description : What is the full form of Dpi ?

Last Answer : Dpi 's full form Dots Per Inch

Last Answer : DPI - Dots Per Inch

Description : Which of the following has `ppi-dpi` bonding?

Last Answer : Which of the following has `ppi-dpi` bonding? A. `NO_(3)^(-)` B. `SO_(3)^(2-)` C. `BO_(3)^(-)` D. `CO_(3)^(-)`

Description : Which of the following has more number of `p pi-dpi` bonds?(all central atoms are in excited states)

Last Answer : Which of the following has more number of `p pi-dpi` bonds?(all central atoms are in excited states) A. `SO_(2)` B ... `SO_(3)^(2-)` D. `CO_(3)^(2-)`

Description : Which of the following contains `p pi-dpi` bonds

Last Answer : Which of the following contains `p pi-dpi` bonds A. `NO_(2)` B. `SO_(3)` C. `SO_(2)` D. Both 2 and 3

Description : What is the DPI of a Kodak disposable camera?

Last Answer : The DPI refers to the dots per inch and refers to the image resolution. It is difficult to know what the DPI from photos from disposable cameras is. The scanner however does control the DPI of the scanned photo.

Description : __________ mean diameter of particles is given by Σ (xi /Dpi ⃗) (A) Mass (B) Volume (C) Arithmetic (D) Volume surface

Last Answer : (B) Volume

Description : With the DPI method of inspection after the contact time has elapsed the dye should be removed by: a) Spraying the surface with the remover till all dye has gone then wipe with clean cloth b) Spraying with ... remover d) it doesn't matter how it is done as long as all traces of dye are removed

Last Answer : c) Wipe clean, using a clean cloth soaked in a solvent remover

Description : Best for print. A. DPI B. RGB C. CMYK

Last Answer : B. RGB

Description : Best for on Screen Display A. DPI B. RGB C. CMYK

Last Answer : A. DPI

Description : The number of dots of ink or toner per inch on a printed image. A. DPI B. RGB C. CMYK

Last Answer : B. RGB

Description : “Dpi” stands for: (A) Dots per inch (B) Digits per unit (C) Dots pixel inch (D) Diagrams per inch

Last Answer : (A) Dots per inch

Description : What's the average CPM for banner ads?

Last Answer : It depends on the traffic. Not only how many, but also if they are recurring or new. Do you know the rate of unique users, in relation to repeats? Most ads I’ve seen cost a few cents per viewing, with an additional charge per click.

Description : Is Cpm software available on the internet?

Last Answer : Yes, CPM software is available on the internet. 3d2f.com/tags/cpm/pert/ is a website with free CPM softward downloads. Yes, CPM software is available on the internet. There are many different ... software at different prices. You can look at the various places to see what requirements you need.

Description : Why PERT is preferred over CPM for evaluation of project ?

Last Answer : PERT is based on the approach of multiple time estimates for each activity.

Description : For an activity in a CPM analysis, the early Finish time is 13 and the late Finish time  is 13. Duration of activity is 6. Which of the following statements is true?  A.The early start is 6 B. ... of the activity is 13  C.The slack of this activity is 13  D.The activity is on the critical path

Last Answer : D.The activity is on the critical path

Description : The particular task performance in CPM is known  A.Dummy  B.Event  C.Activity  D.Contract.

Last Answer : C.Activity

Description : Which of the following statements is true? A. PERT is considered as a deterministic approach and CPM is a probabilis t ic techniques. B. PERT is considered as a probabilistic techniques ... and CPM are both probabilistic techniques. D. PERT and CPM are both considered as deterministic approachs

Last Answer : B. PERT is considered as a probabilistic techniques and CPM is considered as a deterministic approach

Description : Which term is CPM refer to ? 1. Cost per hundred 2. Cost per Million 3. Cost per Thousand 4. Cost per Clic

Last Answer : Cost per Million

Description : A continuous passive motion (CPM) device applied after knee surgery a) promotes healing by increasing circulation and movement of the knee joint. A CPM device applied after knee surgery ... applied after knee surgery promotes healing by increasing circulation and movement of the knee joint.

Last Answer : a) promotes healing by increasing circulation and movement of the knee joint. A CPM device applied after knee surgery promotes healing by increasing circulation and movement of the knee joint.

Description : The basic difference between PERT and CPM is that a. PERT deals with events and CPM with activities b. Critical Path is determined in PERT only c. Costs are considered on CPM only d. Guessed times are used in PERT and evaluated times in CPM.

Last Answer : a. PERT deals with events and CPM with activities

Description : The CPM was developed by Rand and Walker in which year? a. 1957 b. 1958 c. 1959 d. 1960

Last Answer : a. 1957

Description : What is the benefit of using PERT/CPM network as integral component of project management? a. They furnish a consistent framework for planning, scheduling, monitoring and controlling project b. They illustrate ... that the project will be completed by a specific date d. All of the above

Last Answer : d. All of the above

Description : CPM is (A) Synthesising in concepts (B) Is built of activities oriented programme (C) Is based on time estimate (D) All the above

Last Answer : (D) All the above

Description : The first method invented for planning projects, was (A) Bar chart method (B) Milestone chart (C) Critical path method (CPM) (D) Programme Evaluation and Review Technique (PERT)

Last Answer : (A) Bar chart method

Description : Completion of an activity on CPM network diagram, is generally known (A) Event (B) Node (C) Connector (D) All the above

Last Answer : (D) All the above

Description : A CPM family includes (A) CPA (Critical Path Analysis) (B) CPP (Critical Path Plotted) (C) MCE (Minimum Cost Expenditure) (D) All the above

Last Answer : (D) All the above

Description : _________ technique helps to make a choice from numerous available alternatives a. PERT b. CPM c. Linear Programming d. Transportation

Last Answer : d. Transportation

Description : _____ technique is related to Inventory management a. EOQ b. SQC c. CPM d. transportation

Last Answer : a. EOQ

Description : ________ technique is related to Quality control a. Assignment b. Transportation c. CPM d. SQC

Last Answer : d. SQC

Description : ______ are technique applied in project management a. CPM b. Assignment c. Transportation d. Decision theory

Last Answer : a. CPM

Description : Select the correct statement. (A) Activity arrows in a CPM network are drawn to scale (B) The tail of an arrow represents the finish of an activity (C) Arrow bead represents the start of an activity (D) None of the above

Last Answer : (D) None of the above

Description : In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having (A) Longest duration (B) Highest cost slope (C) Least cost slope (D) Shortest duration

Last Answer : (C) Least cost slope

Description : ................... is an event oriented network diagram. a. CPM b. PERT c. Histogram d. Ogive

Last Answer : b. PERT