Description : Once the logic of a network is laid out, the project manager will conduct a forward pass and a backward pass through the network. This will provide information regarding ______ and will identify ... C. Resource shortages, high risk activities D. The high risk activities, non-critical path
Last Answer : A. The total duration of the project, critical path
Description : Activities lying on critical path are called ............................ a. Critical activities b. Non-critical activities c. Dummy activities d. None of these
Last Answer : a. Critical activities
Description : ....................... deals with the concepts such as critical path, float, events, etc. a. Game theory b. Decision theory c. Queuing theory d. Network analysis
Last Answer : d. Network analysis
Description : A critical path network diagram does NOT: A. Help determine the amount of float B. Identify the particularly important activities C. Calculate earned value D. Calculate the duration of the whole project
Last Answer : C. Calculate earned value
Description : .......................... is the duration by which an activity can be delayed without delaying the project. a. Slack b. Total float c. Both a and b d. None of these
Last Answer : b. Total float
Description : ......................... is a series of activities related to a project. a. Network b. Transportation Model c. Assignment model d. None of these
Last Answer : a. Network
Description : ..................... is the duration by which an activity can be delayed without delaying the completion of the project. a. Earliest Start Time b. Earliest Finish Time c. Latest Start Time d. Latest Finish Time
Last Answer : c. Latest Start Time
Description : Crash project duration is obtained by summing the (A) Normal durations for all the activities (B) Crash durations for all activities (C) Crash durations for all the activities along the ... along the critical path obtained by taking into account the crash duration for all the activities.
Last Answer : (D) Crash durations for all the activities along the critical path obtained by taking into account the crash duration for all the activities.
Description : In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having (A) Longest duration (B) Highest cost slope (C) Least cost slope (D) Shortest duration
Last Answer : (C) Least cost slope
Description : In a project schedule, the sequence of activities which cannot be delayed during the course of the project without extending the project end date is referred to as the: A. Action plan B. Critical path C. Schedule baseline D. Slack line
Last Answer : B. Critical path
Description : ......................... is a scheme or design of something intended to do. a. Network b. Float c. Project d. Program
Description : The EST + activity duration = .............................. a. Earliest Finish Time b. Latest Start Time c. Latest Finish Time d. None of these
Last Answer : a. Earliest Finish Time
Description : A project activity has several components as indicated below; S. No. Activity Preceded by Duration (in Weeks) 1 A - 8 2 B A 6 3 C A 12 4 D B 4 5 E D 5 6 F B 12 7 G E& F ... H 5 10 J I & G 6 d. Prepare a PERT chart, estimate the duration of the project and identify the critical path.
Last Answer : PERT Diagram based on Activity on Arrow . E D 5 G B 5 9 J, 6 A 6 F,12 I ,5 8 c 12 H 8 OR PERT Diagram based on Activity on Node …………………….6 marks a. Critical Path: A-B-F-G-J …………………….1 mark b. Estimated Project Duration: 41 weeks
Description : Operations Research Techniques involves ..................... approach. a. Team approach b. Critical approach c. Individual approach d. None of these
Last Answer : c. Individual approach
Description : Additional time which a non-critical activity can consume without increasing the project duration is called _____________. A. Total Float. B. Free Float C. Independent Float. D. Dependant Float
Last Answer : A. Total Float.
Description : Project crashing is the method for ------------- A. Shortening the project duration by reducing the time of one or more critical activities B.Adding resources at critical points C.Doing technical analysis of the finished work for review D.Adding duration to each activity
Last Answer : A. Shortening the project duration by reducing the time of one or more critical activities
Description : Activities that cannot be started until one or more of the other activities are completed, are called.......................................... a. Dummy activities b. Initial activities c. Successor activities d. Predecessor activities
Last Answer : c. Successor activities
Description : An activity which must be completed before commencement of one or more other activities is called................................. a. Successor activity b. Predecessor activity c. Dummy activity d. None of these
Last Answer : b. Predecessor activity
Description : ........................may be defined as a method of determining an optimal program of interdependent activities in view of available resources. a. Goal programming b. Linear programming c. Decision making d. None of these
Last Answer : b. Linear programming
Description : ............................ models involve the allocation of resources to activities in such a way that some measure of effectiveness is optimised. a. Sequencing b. Allocation c. Queuing theory d. Decision theory
Last Answer : b. Allocation
Description : ........................... is the latest time by which an activity can be finished without delaying the completion of the project. a. LST b. LFT c. EFT d. EST
Last Answer : b. LFT
Description : In time-cost optimization of a project, crashing is done. (A) On all the activities (B) On all the activities lying on the critical path (C) Only on activities lying on the ... critical activities and those that become critical at any stage of crashing in the order of ascending cost slope
Last Answer : D
Description : In a network diagram, activity is denoted by ............................ a. Node b. Arrow c. Triangle d. None of these
Last Answer : b. Arrow
Description : ................... is an event oriented network diagram. a. CPM b. PERT c. Histogram d. Ogive
Last Answer : b. PERT
Description : ......................... is activity oriented network diagram. a. CPM b. PERT c. Histogram d. Ogive
Last Answer : a. CPM
Description : In network diagram, events are commonly represented by ......................... a. Arrows b. Nodes c. Triangles d. None of these
Last Answer : b. Nodes
Description : ......................... deals with making sound decisions under conditions of certainty, risk and uncertainty. a. Game theory b. Network analysis c. Decision theory d. None of these
Last Answer : c. Decision theory
Description : What is a visual representation of a project’s planned activities against a calendar called? a. A Gantt chart. b. A critical path network. c. A product flow diagram. d. A Pareto chart.
Last Answer : a. A Gantt chart.
Description : Shadow price is also called ...................... a. Dual price b. Unit price c. Total cost d. None of these
Last Answer : a. Dual price
Description : A Transportation Problem is said to be unbalanced when total supply is not equal to ............ a. Total cost b. Total demand c. Both a and b d. None of these
Last Answer : b. Total demand
Description : The O R technique which helps in minimising total waiting and service cost is: a. Game theory b. Queuing theory c. Both a and b d. Decision theory
Last Answer : b. Queuing theory
Description : The dummy source/destination in a transportation problem is added to ........................ a. Satisfy rim constraints b. Prevent solution from becoming degenerate c. Ensure total cost does not exceed a limit d. None of the above
Last Answer : a. Satisfy rim constraints
Description : Critical path moves along the activities having total float as (a) Positive (b) Negative ( c) Zero (d) Unity
Last Answer : ( c) Zero
Description : In a ........................game the amounts won by all winners together is equal to the sum of the amounts lost by all losers together. a. Non-zero sum game b. Zero sum game c. Rectangular game d. None of these
Last Answer : b. Zero sum game
Description : Non-negativity constraints are written as ...................... a. Equality b. Non-equality c. Greater than or equal to d. Less than or equal to
Last Answer : c. Greater than or equal to
Description : Every Linear Programming Problem is related to another Linear Programming Problem, called .......................... a. Primal b. Dual c. Non-linear Programming d. None of these
Last Answer : b. Dual
Description : When at least one of the basic variables is zero, then the basic feasible solution to a Linear Programming Problem is said to be .............................. a. Infeasible b. Unbounded c. Degenerate d. Non-degenerate
Last Answer : c. Degenerate
Description : The variables whose coefficient vectors are unit vectors, are called ...................... a. Unit variables b. Basic variables c. Non-basic variables d. None of these
Last Answer : b. Basic variables
Description : You are a project manager for Move It Now trucking company. Your company specializes in moving household goods across the city or across the country. Your project involves upgrading the nationwide computer network for the ... the weighted average or expected value? A. 54 B. 66 C. 60 D. 30
Last Answer : C. 60
Description : For completion of a project, the critical path of the network represents (A) Minimum time (B) Maximum time (C) Maximum cost (D) Minimum cost
Last Answer : (A) Minimum time
Description : For an activity in a CPM analysis, the early Finish time is 13 and the late Finish time is 13. Duration of activity is 6. Which of the following statements is true? A.The early start is 6 B. ... of the activity is 13 C.The slack of this activity is 13 D.The activity is on the critical path
Last Answer : D.The activity is on the critical path
Description : What would be the critical path if the duration of activity C increased to 10? A. ABCF B. ABCEF C. ABGHIF D. ABGHIF & ABDEF
Last Answer : A. ABCF
Description : Feasibility study determines ----------------- A.Whether the project is possible with resources B.Comparing the project with world class manufacturing norms C.Calculate the cost crashing each unit D.Add duration to each unit
Last Answer : A.Whether the project is possible with resources
Description : For a project manager to have an effective means of identifying and communicating the planned activities and their interrelationships, he must use a network technique. One of the network ... evaluation review technique c. Path evaluation review technique d. Project execution review technique
Last Answer : b. Program evaluation review technique
Description : Floats for critical activities will be always _____ a. One b. Zero c. Highest d. Same as duration of the activity
Last Answer : b. Zero
Description : The network diagram is the best tool for demonstrating: A. Schedule variances B. Resource requirements C. The sequence of project activities D. Schedule performance over time
Last Answer : C. The sequence of project activities
Description : In a PERT network, slack time is _____. (a) The end point that represents the completion of a major activity (b) The time or resources required to progress from one event to another ( ... without delaying the whole Project (d) The longest or most time-consuming sequence of events and activities
Last Answer : (c) The amount of time an individual activity can be delayed without delaying the whole Project
Description : A bar chart is commonly used because (a) It is simple to draw and easy to understand (b) It indicates at a glance the overall progress of the project (c) It shows critical ... critical activities (d) It incorporates uncertainties for delay in estimation of time required for completion of activities.
Last Answer : (a) It is simple to draw and easy to understand
Description : If a simplex table shows the values 2, -3, 0 against “θ”, which should be taken as the replacement ratio. a. 2 b. -3 c. 0 d. None of these
Last Answer : c. 0