Description : Pick up the item of work not included in the plinth area estimate (A) Wall thickness (B) Room area (C) W.C. area (D) Courtyard are
Last Answer : (D) Courtyard area
Description : The first stage of deciding the alignment of a hill road, is (A) Reconnaissance (B) Detailed survey (C) Trace-out (D) Preliminary survey
Last Answer : Answer: Option A
Description : Preliminary project report for a road project must contain (A) The detailed estimated cost based on detailed design (B) The several alternatives of the project that have been considered (C ... , traffic survey, concept design and approximate cost (D) The contract documents for inviting tenders
Last Answer : (C) The soil survey, traffic survey, concept design and approximate cost
Description : While preparing a detailed estimate (A) Dimension should be measured correct to 0.01 m (B) Area should be measured correct to 0.01 sqm (C) Volume should be measured correct to 0.01 cum (D) All the above
Last Answer : (D) All the above
Description : Energy audit can be classified as. a) Preliminary audit. c) Detailed audit. b) Both (a) and (b). d) Only option (a).
Last Answer : Both (a) and (b).
Description : Energy audit can be classified as. a) Preliminary audit. b) Detailed audit. c) Both (a) and (b). d) Only option (a).
Description : The is the simplest and quickest type of audit. a) Detailed audit. b) Energy audit. c) Preliminary audit
Last Answer : <!-- [endif] -->Preliminary audit.
Description : A detailed project report of the proposed railway line is made after (a) Preliminary survey (b) Reconnaissance survey (c) Final location survey* (d) Traffic survey
Last Answer : (c) Final location survey*
Description : Investigation for important bridges may be carried out in which stage a) Technical feasibility study (reconnaissance survey) b) Techno-economic feasibility study (preliminary engineering survey) c) Detailed survey and project report stage (final location survey) d) All the above *
Last Answer : d) All the above
Description : Pick up the incorrect statement from the following: (A) The built up covered area at the floor level of any storey of a building is called plinth area (B) The usable covered area of the rooms of ... , pantry, store, lavatory, bath room and glazed veranda, is called floor area (D) None of thes
Last Answer : (D) None of thes
Description : The plinth area of a building not includes (A) Area of the walls at the floor level (B) Internal shaft for sanitary installations up to 2 sq m. in area (C) Lift and wall including landing (D) Area of cantilevered porch
Last Answer : (D) Area of cantilevered porch
Description : Pick up the correct statement from the following: (A) The incidental expenses of a miscellaneous character which could not be predicted during preparation of the estimate, is called contingencies (B) ... and the proportions of materials to be used for a particular item (D) All the above
Description : Which type of project cost estimate is the most accurate? 1. Preliminary 2. Definitive 3. Order of magnitude 4. Conceptual
Last Answer : 2. Definitive
Description : The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is (A) 1.00 m3 (B) 1.25 m3 (C) 1.50 m3 (D) 1.75 m3
Last Answer : (B) 1.25 m3
Description : Pick up the incorrect statement from the following: (A) Horizontal D.P.C. is provided at plinth level in internal walls (B) D.P.C. is provided under door and verandah openings (C) Vertical D.P.C. is not provided in internal walls (D) Cement concrete is a rigid damp-proofing material
Last Answer : Answer: Option B
Description : In ordinary residential and public buildings, the damp proof course is generally provided at (A) Ground level (B) Plinth level (C) Water table level (D) Midway ground level and water-table level
Description : What is the meaning of the word Plinth ?
Last Answer : stambapith , stambhumul , vithimul etc.
Description : State any two purposes of Plinth
Last Answer : Purposes of Plinth: 1. To prevent entry of flood water into building. 2. To avoid dust, Insects, Reptiles, etc entries inside the building 3. To facilitate easy drainage of sewage water. 4. To ... wall & transfer load to footing. 6. To prevent from dampness. 7. To support flooring tiles.
Description : How to glue a ceiling plinth?
Last Answer : Ceiling plinth is used to decorate the angle between the wall and the ceiling. This decorative element is also called fillet. Installation is carried out after leveling the walls and ceiling. We ... After completing the process, the ceiling plinth is painted, usually in the color of the ceiling.
Description : Does anyone have a reliable estimate for the size of our community?
Last Answer : Circumnavigator Visited Fluther 90 days in a row. Awarded to 170 users Sounds about right.
Description : How many differerent langauges has Genesis been translated into? Does anyone have a reliable source for an estimate?
Last Answer : answer:http://www.biblegateway.com/versions/ The above site has just under 50, publish online for viewing.
Description : Pick up the incorrect statement from the following. While performing preliminary test on concrete (A) Proportions of the material and water should be the same as to be used at the work site (B) ... in air-tight containers (D) Concrete ingredients should be kept at a temperature of 37° 2°C
Last Answer : Answer: Option D
Description : The preliminary test is repeated if the difference of compressive strength of three test specimens, exceeds (A) 5 kg/cm2 (B) 8 kg/cm2 (C) 10 kg/cm2 (D) 15 kg/cm2
Description : Pick up the incorrect statement from the following: (A) Concrete for which preliminary tests are conducted, is called controlled concrete (B) Bulking of sand depends upon the fineness of grains (C) Concrete mix 1 : 6 : 12, is used for mass concrete in piers (D) All the above
Description : The concrete in which no preliminary tests are performed for designing the mix is called (a) Rich concrete (b) Controlled concrete (c) Lean concrete (d) Ordinary concrete
Last Answer : (d) Ordinary concrete
Description : Pick up the incorrect statement from the following. For performing compressive strength test of cement (A) Cement and standard sand mortar are used in the ratio of 1 : 3 (B) Water is added at the ... cm 10 cm is used (D) The prepared moulds are kept in a atmosphere of 50% relative humidity
Description : In the estimate of design flood, Dickens assumes that high flood in cumecs, is proportional to catchment area raised to the power (A) 1/4 (B) 1/2 (C) 3/4 (D) 2/3
Last Answer : Answer: Option C
Description : Which of the following methods is used to estimate flood discharge based on high water marks left over in the past? (A) Slope-area method (B) Area-velocity method (C) Moving boat method (D) Ultrasonic method
Description : The volume of cube is increasing at a rate of `9 cm^(3)//sec`. Find the rate of increase of its surface area when the side of the cube is 10 cm.
Last Answer : The volume of cube is increasing at a rate of `9 cm^(3)//sec`. Find the rate of increase of its surface area when the side of the cube is 10 cm.
Description : Intersection method of detailed plotting is most suitable for (A) Forests (B) Urban areas (C) Hilly areas (D) Plains
Last Answer : (C) Hilly areas
Description : Detailed plotting is generally done by (A) Radiation (B) Traversing (C) Resection (D) All of the above
Last Answer : (A) Radiation
Description : Pick up the correct statement from the following: (A) Detailed survey is carried out for a strip of land about 30 m at sharp curves (B) Levels are taken along the trace cut at an interval of 20 m (C) Contour interval is generally adopted at 2 metres vertical interval (D) All the above
Description : First operation during the detailed survey of a hill road, is (A) Hydrological and soil surveys (B) Adjustment of alignment along with curves (C) Derivation of longitudinal and cross-sections (D) Fixation of Bench Marks
Description : Pick up the correct statement from the following: (A) During reconnaissance, the general route of the alignment is selected (B) After reconnaissance, a trace is cut for the alignment (C) Last stage is the detailed surveys for desired geometries' of the highway (D) All the above
Description : Soundings are required for (A) Making nautical charts for navigation (B) Ascertaining the areas subject to scour or silting (C) Obtaining detailed information for construction (D) All the above
Description : Where can I find a detailed map of weather patterns in the Bay Area?
Last Answer : answer:I don't know a place for that (but I'm excited to find one). SF Ports has a lot of the data you're looking for: http://sfports.wr.usgs.gov/sfports.html (You can do a time-series ... the very cool modeled wind field over the SF Bay area: http://sfports.wr.usgs.gov/cgi-bin/wind/windbin.cgi
Description : A limited company makes a net profit of Rs. 2,00,000 after writing off preliminary expenses amounting to Rs. 20,000 and providing for depreciation on assets amounting to Rs. 40,000 and gain of Rs. 10,000 on sale of a piece of ... 2,00,000 (B) Rs. 2,40,000 (C) Rs. 2,50,000 (D) Rs. 2,60,000
Last Answer : Answer: Rs. 2,50,000
Description : During preliminary treatment of a sewage A. Oil and grease are removed from skimming tanks B. Floating materials are removed by screening C. Girt and sand are removed by girt chambers D. All the above
Last Answer : ANS: D
Description : For the preliminary breaking of hard rock, we use a (A) Gyratory crusher (B) Ball mill (C) Tube mill (D) Squirrel-cage disintegrator
Last Answer : (A) Gyratory crusher
Description : A __________ mill is a revolving mill divided into two or more sections by perforated partitions in which preliminary grinding takes place at one end and the finishing grinding at the discharge end. (A) Compartment (B) Tube (C) Rod (D) Pebble
Last Answer : (A) Compartmen
Description : In the ____ stage, of project identification the project ideas generated above are screened and a preliminary exercise is conducted to weed out the bad or unviable ideas.
Last Answer : Ans. Screening
Description : Earned value management integrates scope, cost, and schedule measures to: A. assess project performance and progress. B. develop a preliminary budget. C. assess communication effectiveness among project team members. D. assess whether all requirements were met.
Last Answer : A. assess project performance and progress.
Description : You are the project manager working on a research project for a new drug treatment. Your preliminary project schedule runs past the due date for a federal grant application. The manager of the R&D ... . A. Crashing B. fast tracking C. resource leveling D. adjusting the resource calendar
Last Answer : A. Crashing
Description : According to the PMBOK Guide, the project manager is identified and assigned during which process? A. Prior to beginning the Develop Project Charter process B. At the conclusion of the ... . Prior to beginning the Planning processes D. Prior to beginning the Preliminary Scope Statement process
Last Answer : C. Prior to beginning the Planning processes
Description : A planning method, which provides details of the work to accomplish, but also provide some preliminary description of the work to be done in later phases is called : 1. Progressive detailing 2. Rolling wave 3. Strategic 4. Operational
Last Answer : 2. Rolling wave
Description : A decree, when an adjudication completely disposes of the suit, is a (a) Preliminary decree (b) Final decree (c) Partly preliminary and partly final (d) None of these
Last Answer : (b) Final decree
Description : A decree, when further proceedings have to be taken before the suit can be completely disposed of, is a (a) Final decree (b) Preliminary decree (c) Preliminary decree and partly final decree (d) None of these
Last Answer : (b) Preliminary decree
Description : If an appeal against a preliminary decree succeeds, the final decree (a) Can be passed (b) Can or cannot be passed (c) Automatically fails (d) None
Last Answer : (c) Automatically fails
Description : Rejection of an application for condonation of delay and consequent dismissal of appeal as time barred is (a) A decree (b) Preliminary decree (c) Not a decree (d) None
Last Answer : (c) Not a decree
Description : Decree can be— (a) Preliminary (b) Final (c) First preliminary then final (d) Either preliminary or final
Last Answer : (d) Either preliminary or final