For a 210 MW, turbo-alternator in a thermal power plant, the possible specifications of rotor diameter, stator core length, and number of poles, respectively, are

(A) 4.4 m, 1.2 m, 12 (B) 1.2 m, 4.4 m, 2

(C) 4.4 m, 1.2 m, 24 (D) 1.2 m, 4.4 m, 8

1 Answer

Answer :

For a 210 MW, turbo-alternator in a thermal power plant, the possible specifications of rotor diameter, stator core length, and number of poles, respectively, are 1.2 m, 4.4 m, 2

D NH hoga sir

Related questions

Description : Multiple inlet system of air cooling of turbo-alternators can be used for machines of rating upto (a) 10 MW (b) 30 MW (c) 60 MW (d) 150 MW

Last Answer : (c) 60 MW

Description : State any four salient features of turbo- alternator.

Last Answer : Special features of a turbo alternator used in TPS: Special Futures (Highlights): It is 3-phase generator. A separate excitation is given to alternator by DC generator ( ... under voltage protection. Over frequency under frequency protection. Over load protection. Over temperature protection 

Description : In the illustration, if one of the devices labeled 'TURB' should fail the ___________. EL-0003 A. device labeled 'EXC' will drive the alternator B. device labeled 'BKR' for that ... -alternator D. emergency generator should automatically start and be placed on line to supply emergency load centers

Last Answer : Answer: B

Description : In wound rotor alternator, reactive power is maximum at a load angle of 

Last Answer : In wound rotor alternator, reactive power is maximum at a load angle of 0o

Description : State three important features of turbo alternator rotors.

Last Answer : 1. The rotors of turbo alternators have large axial length and small diameters. 2. Damping torque is provided by the rotor itself and so there is no necessity for additional damper winding. 3. They are suitable for high speed operations and so number of poles is usually 2 or 4.

Description : What are the various faults to which a turbo alternator is likely to be subjected?

Last Answer : Failure of steam supply; failure of speed; overcurrent; over voltage; unbalanced loading; stator winding fault .

Description : Which rotor is use for high speed in turbo alternators?

Last Answer : Non-salient pole rotor is used for high speed in turbo alternators.

Description : ECE Board Exam November 1996 What is the applied power if a thermal RF wattmeter is connected to a transmitter through a variable attenuator? The wattmeter reads 84 mW when 15 dB of attenuation is used. A. 4.656 watts B. 2.656 watts C. 3.656 watts D. 2.856 watts

Last Answer : B. 2.656 watts

Description : ECE Board Exam November 1996 What is the applied power if a thermal RF wattmeter is connected to a transmitter through a variable attenuator? The wattmeter reads 84 mW when 15 dB of attenuation is used. A. 4.656 watts B. 2.656 watts C. 3.656 watts D. 2.856 watts

Last Answer : A. PAM

Description : Nuclear power generation capacity in India is (A) 3000 MW (B) 10000 MW (C) More than hydroelectric power generation capacity (D) More than thermal power generation capacity

Last Answer : (A) 3000 MW

Description : Which of the following problems will occur if the circuit breaker of the incoming alternator is closed and it is 180° out of phase with the loaded alternator when paralleling? A. The rotor of the ... The rotor of the incoming alternator will stop. D. Both alternators will parallel 180° out of phase.

Last Answer : Answer: B

Description : Loss of or weak residual magnetism in an alternator or generator can be corrected for by _________________. A. running the rotor in the opposite direction for 5 minutes B. allowing the generator ... rheostat fully counterclockwise D. using a storage battery or battery charger to 'flash' the field

Last Answer : Answer: D

Description : The frequency output of an operating alternator is controlled by the _____________. A. relative speed of the rotor poles B. number of turns of wire in the armature coil C. strength of the magnets used D. output voltage

Last Answer : Answer: A

Description : Why alternator rotor is made of solid iron?  

Last Answer : Because, rotor flux = DC continuous No iron loss problems. 

Description : A generating station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is   (a) 5 MW (b) 4 MW (c) 6 MW (d) 10 MW 

Last Answer : A generating station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 6 MW

Description : The output power of a filter is 100 mW, when the signal frequency is 6 kHz. When the frequency is increased to 25 kHz, the output power falls to 50 mW. What is the dB change in power ? (a) -3 dB (b) -5 dB (c) -7 dB (d) -2 dB

Last Answer : The output power of a filter is 100 mW, when the signal frequency is 6 kHz. When the frequency is increased to 25 kHz, the output power falls to 50 mW. What is the dB change in power ?  -3 dB 

Description : A three phase transmission line delivers a load of 5 MW at 0.8 power factor lagging. Resistance of each conductor is 0.5 ohm / km. Receiving end voltage is 33 kV. If the line loss is not to exceed 10%, determine the length of the line.  (A) 7 km (B) 27.9 km (C) 56.8 km (D) 13.9 km

Last Answer : B

Description : Calculate the power loss, if power generated by two plants are P1=50 MW and P2 =40 MW and the loss coefficients are B11=0.001, B22=0.0025 and B12=-0.0005.  (A) 4.5 MW (B) 5.5 MW (C) 6.5 MW (D) 8.5 MW

Last Answer : A

Description : The slant height and base diameter of conical tomb are 25m and 14 m respectively. Find the cost of white-washing its curved surface at the rate of Rs. 210 per 100 m2 -Maths 9th

Last Answer : Slant height of conical tomb, l = 25m Base radius, r = diameter/2 = 14/2 m = 7m CSA of conical tomb = πrl = (22/7)×7×25 = 550 CSA of conical tomb= 550m2 Cost of white-washing 550 m2 area, which is Rs (210×550)/100 = Rs. 1155 Therefore, cost will be Rs. 1155 while white-washing tomb.

Description : Bhabha Atomic Research Centre (BARC) located at Trombay (near Bombay, INDIA) has (A) Five operating research reactors (namely Apsara, Cirus Zerelina, Purnima and Dhurva) (B) A 420 MW nuclear power plant (C) A very large capacity (100 tons/yr) heavy water plant (D) All (A), (B) and (C)

Last Answer : (A) Five operating research reactors (namely Apsara, Cirus Zerelina, Purnima and Dhurva)

Description : For steam power plant having capacity 600 MW capacity a cooling tower is required to set up with condenser. Suggest the type of condenser and cooling tower with justification. 

Last Answer : For Steam power plant having Capacity 600 MW the requirement of condenser and cooling tower is as follow. 1) Condenser:- Given Capacity is medium to low capacity for this we can use Jet Condenser ... and efficiency of tower is high  -Temperature of water coming out from tower can be controlled.

Description : If the average bending stress is 6 kg/cm2 for M 150 grade concrete, the length of embedment of a bar of diameter d according to I.S. 456 specifications, is (A) 28 d (B) 38 d (C) 48 d (D) 58 d

Last Answer : Answer: Option D

Description : With direct water cooling it is possible to have ratings of about (a) 200 MW (b) 300 MW (c) 400 MW (d) 600 MW

Last Answer : (d) 600 MW

Description : With conventional hydrogen cooling it is possible to increase the rating of a single unit to (a) 50 MW (b) 100 MW (c) 200 MW (d) none ofthe above

Last Answer : (c) 200 MW

Description : Exhaust gas energy recovery in Electro turbo compounding (ETC) up to a. 10% Possible b. 20% Possible c. 30% Possible d. 40% Possible

Last Answer : Ans:- b. 20% Possible

Description : A generating station has a maximum demand of 50 Mw, a load factor of 60%, a plant capacity factor of 45% and if the plant while running as per schedule, were fully loaded. The daily energy produced will be

Last Answer : A generating station has a maximum demand of 50 Mw, a load factor of 60%, a plant capacity factor of 45% and if the plant while running as per schedule, were fully loaded. The daily energy produced will be 720 MW.

Description : Where is Tala Hydroelectric project, which is expected to generate 1020 MW power, located? (1) Arunachal Pradesh (2) Bhutan (3) Nepal (4) Himachal Pradesh

Last Answer : (2) Bhutan Explanation: Tala Hydroelectricity project is the biggest hydroelectric joint project between India and Bhutan so far, generating 4865 GWh/yr. Tala is located in Chukha Dzongkhag in western ... planned for June 2005, but because of geological problems this was delayed until March 2007.

Description : In measuring crosstalk using dBx unit the reference power is A. 1 mW B. 1 W C. 1 pW D. 6 mW

Last Answer : C. 1 pW

Description : Part of a microwave link can be approximated by free space conditions. The antenna gain are each 40 dB, the frequency is 10 GHz, and the path length is 80 km. Calculate the receive power for a transmitted power of 10 W? A. 0.871 μW B. 871 μW C. 0.871 mW D. 871 nW

Last Answer : A. 0.871 μW

Description : ECE Board Exam March 1996 The power of standard test tone is normally ____________. A. 1 dB B. 0 mW C. 1 mW D. 1 W

Last Answer : C. 1 mW

Description : Tarapur (INDIA) atomic power station (A) Has two boiling water reactors of American design (B) Has an installed capacity of 400 MW (C) Is the first power reactor in India, which became critical in 1969 (D) All (A), (B) and (C)

Last Answer : (D) All (A), (B) and (C)

Description : For a single mode optical cable with 0.25 dB/km loss, determine the optical power 100 km from a 0.1-mW light source. ∙ A. -45 dBm ∙ B. -15 dBm ∙ C. -35 dBm

Last Answer : ∙ C. -35 dBm

Description : The electrical power unit Giga Watt (GW) may be written as a) 1,000,000 MW b) 1,000 MW c) 1,000 kW d) 1,000,000 W

Last Answer : b) 1,000 MW

Description : By the year 2022, the Climate Change Action Plan of Government of India aims at installing (A) 20,000 MW of wind power (B) 25,000 MW of wind power (C) 20,000 MW of solar power (D) 10,000 MW of solar power

Last Answer : (C) 20,000 MW of solar power

Description : Where is Tala Hydroelectric project, which is expected to generate 1020 MW power, located ? (1) Arunachal Pradesh (2) Bhutan (3) Nepal (4) Himachal Pradesh

Last Answer : Bhutan

Description : A 3-phase 11 kV generator feeds power to a constant power unity power factor load of 100 MW through a 3-phase transmission line. The line-to line voltage at the terminals of the machine is maintained constant at 11 kV. The per ... 11 kV is  (A) 100 MVAR (B) 10.1 MVAR (C) -100 MVAR (D) -10.1 MVAR

Last Answer : A 3-phase 11 kV generator feeds power to a constant power unity power factor load of 100 MW through a 3-phase transmission line. The line-to line voltage at the terminals of the machine is maintained ... load to increase the line-to-line voltage at the load terminals to 11 kV is -10.1 MVAR

Description : At an industrial sub-station with a 4 MW load, a capacitor of 2 MVAR is installed to maintain the load power factor at 0.97 lagging. If the capacitor goes out of service, the load power factor becomes (A) 0.85 (B) 1.00 (C) 0.80 lag (D) 0.90 lag

Last Answer : At an industrial sub-station with a 4 MW load, a capacitor of 2 MVAR is installed to maintain the load power factor at 0.97 lagging. If the capacitor goes out of service, the load power factor becomes  0.80 lag

Description : Two synchronous generators operating in parallel supply a common load of 2.5 MW. The frequency-power characteristics have a common slope of 1 MW/Hz and the no-load frequencies of the generators are 51.5 Hz and 51.0 Hz, ... system frequency is (A) 50 Hz (B) 51 Hz (C) 51.25 Hz (D) 51.5 Hz

Last Answer : Two synchronous generators operating in parallel supply a common load of 2.5 MW. The frequency-power characteristics have a common slope of 1 MW/Hz and the no-load frequencies of the generators are 51.5 Hz and 51.0 Hz, respectively. Then the system frequency is 50 Hz

Description : A power station supplies the peak load of 60 Mw, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55. The maximum demand on the station and average load respectively will be 

Last Answer : A power station supplies the peak load of 60 Mw, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55. The maximum demand on the station and average load respectively will be 103.2 MW, 51.61 .

Description : The speed of a squirrel-cage induction motor is determined by the ____________. A. diameter of the stator B. number of stator poles C. rotor winding resistance D. rotor conducting bars resistance

Last Answer : Answer: B

Description : The speed of a squirrel cage induction motor is determined by the _____________. A. diameter of the stator B. number of stator poles C. rotor winding resistance D. bar resistance of the conducting rotor

Last Answer : Answer: B

Description : A 60 Hz, 4 pole turbo generator rated 100 MVA, 13.8 KV has an inertia constant of 10 MJ/MVA. Find the stored energy in the rotor at synchronous speed.  (A) 10 MJ (B) 100 J (C) 1000 J (D) 1000 MJ 

Last Answer : c

Description : Turn on the Turbo power, stand aside, brother Stu is going to come spinning into the Mansion!

Last Answer : Woo Hoo!. It cracks me up how different the word I say in my head when I see a strange name is from what it really is when you break it down. I never saw the turbo in his name. @ibsturbo, What a wonderful asset you have been to the community. I’m almost glad askville shut down!

Description : The power required to drive a turbo compressor for a given pressure ratio decreases when A. Air is heated at entry B. Air is cooled at entry C. Air is cooled at exit D. Air is heated at exit

Last Answer : ANSWER : B

Description : The direction of propeller shaft rotation in a turbo-electric synchronous propulsion drive motor is changed by reversing the _____________. A. polarity of the propulsion motor B. polarity of the propulsion generator C. phase sequence of power to the motor D. phase sequence of power to the generator

Last Answer : Answer: C

Description : Turbo chargers are driven by A. Direct connection with engine power B. Exhaust gases from engine C. Electric current from the battery D. None of the above

Last Answer : B. Exhaust gases from engine

Description : Turbo chargers or super chargers increases engine power by A. 10-20% C. 50-60% B. 20-30% D. 90-100%

Last Answer : A. 10-20%

Description : A 50 Hz, 4-pole, 500 MVA, 22 kV turbo-generator is delivering rated megavolt amperes at 0.8 power factor. Suddenly a fault occurs reducing in electric power output by 40%. Neglect losses and assume constant power input to the ... the time of fault will be  (A) 1.528 (B) 1.018 (C) 0.848 (D) 0.509

Last Answer : A 50 Hz, 4-pole, 500 MVA, 22 kV turbo-generator is delivering rated megavolt amperes at 0.8 power factor. Suddenly a fault occurs reducing in electric power output by 40%. Neglect losses and assume ... the shaft. The accelerating torque in the generator in MNm at the time of fault will be 1.018 

Description : Technical personnel who help develop the specifications and evaluate alternative products for possible use are called: A)users B)influencers C)buyers D)deciders E)gatekeepers

Last Answer : B)influencers