For quality control of Portland cement, the test essentially done is
(A) Setting time
(B) Tensile strength
(C) Consistency
(D) All the above

1 Answer

Answer :

D

Related questions

Description : Vicat apparatus is used for (A) Fineness test (B) Consistency test (C) Test for setting time (D) Test for tensile strength

Last Answer : Answer: Option B

Description : The normal consistency of ordinary Portland cement is about (A) 10 % (B) 20 % (C) 30 % (D) 40 %

Last Answer : Answer: Option C

Description : Slump test of concrete is a measure of its (A) Consistency (B) Compressive strength (C) Tensile strength (D) Impact value

Last Answer : (A) Consistency

Description : Slump test of concrete is a measure of its (A) Consistency (B) Compressive strength (C) Tensile strength (D) Impact value

Last Answer : (A) Consistency

Description : Slump test of concrete is a measure of its [ A ] Consistency [ B ] Compressive strength [ C ] Tensile strength [ D ] Impact value

Last Answer : [ A ] Consistency

Description : Le-Chatelier's device is used for determining the (A) Setting time of cement (B) Soundness of cement (C) Tensile strength of cement (D) Compressive strength of cement

Last Answer : Answer: Option B

Description : Soundness test of cement determines (A) Quality of free lime (B) Ultimate strength (C) Durability (D) Initial setting

Last Answer : Answer: Option A

Description : Pick up the incorrect statement from the following. For performing compressive strength test of cement (A) Cement and standard sand mortar are used in the ratio of 1 : 3 (B) Water is added at the ... cm 10 cm is used (D) The prepared moulds are kept in a atmosphere of 50% relative humidity

Last Answer : Answer: Option A

Description : For determining the compressive strength test on cement is, the percentage amount of water to be added as (Pa = Percentage of water for required consistency) [ A ] 0.25 Pa + 2.5 [ B ] 0.25 Pa + 3.5 [ C ] 0.35 Pa + 2.5 [ D ] 0.35 Pa + 3.5

Last Answer : [ B ] 0.25 Pa + 3.5

Description : Pick out the wrong statement. (A) High early strength cement are made from materials having high silica to lime ratio (B) The function of gypsum in cement is to enhance its initial ... cements are known as silicate cement (D) Major component of greyish Portland cement is tricalcium silicate

Last Answer : (A) High early strength cement are made from materials having high silica to lime ratio

Description : The addition of gypsum to portland cement helps in : (1) increasing the strength of cement (2) rapid setting of cement (3) preventing rapid setting of cement (4) reduction in the cost of cement

Last Answer : preventing rapid setting of cement

Description : The compressive strength an ordinary Portland cement (1:3) after 7 days test should not be less than. (a) 11N/mm2 (b) 17.5 N/mm2 (c) 22 N/mm2 (d) 27.5N/m2

Last Answer : (b) 17.5 N/mm2

Description : If ‘W’ is the percentage of water required for normal consistency of cement, water to be added for determination of initial setting time is (a) 0.50 W (b) 0.62 W (c) 0.75 W (d) 0.85 W

Last Answer : (d) 0.85 W

Description : For an ordinary Portland cement (A) Residual does not exceed 10% when sieved through IS Sieve No. 9 (B) Soundness varies from 5 to 10 mm (C) Initial setting time is not less than 30 minutes (D) Compressive stress after 7 days, is not less than 175 kg/cm2

Last Answer : (C) Initial setting time is not less than 30 minutes

Description : As compared to ordinary Portland cement, high alumina cement has (A) Higher initial setting time but lower final setting time (B) Lower initial setting time but higher final setting time (C) Higher initial and final setting times (D) Lower initial and final setting times

Last Answer : Answer: Option A

Description : As per IS specifications, the maximum final setting time for ordinary Portland cement should be (A) 30 minutes (B) 1 hour (C) 6 hours (D) 10 hour

Last Answer : Answer: Option D

Description : The initial setting time for ordinary Portland cement as per IS specifications should not be less than (A) 10 minutes (B) 30 minutes (C) 60 minutes (D) 600 minutes

Last Answer : Answer: Option B

Description : According to IS Code , the requirement of an ordinary Portland cement is (a) The residue does not exceed 10% when sieved through is sieve no .9 (b) Its initial setting time is not less than 30 minutes. (c) its expansion is not morethan 10mm for unaerated cement (d) All the above.

Last Answer : (d) All the above.

Description : Le Chatelier apparatus is used to determine which of the following properties for cement A) Soundness* b) Initial setting time c) Compressive strength d) Tensile strength

Last Answer : A) Soundness*

Description : For construction of structures in sea water, the cement generally preferred to, is (A) Portland-pozzolana cement (B) Quick setting cement (C) Low heat Portland cement (D) Rapid hardening cement

Last Answer : Answer: Option A

Description : Portland cement manufactured from pure white chalk and clay but free from iron-oxide, is known as (A) Quick setting cement (B) Rapid hardening cement (C) White cement (D) Low heat Portland cement

Last Answer : Answer: Option C

Description : Workability of concrete mix with low water cement ratio is determined by (A) Tensile strength test (B) Slump test (C) Compaction factor test (D) Flexural strength test

Last Answer : Answer: Option C

Description : Workability of concrete mix with low water cement ratio is determined by [ A ] Tensile strength test [ B ] Slump cone test [ C ] Compaction factor test [ D ] Flexural strength test

Last Answer : [ C ] Compaction factor test

Description : Newly constructed pavement with ordinary Portland cement attains its working strength after (A) 7 days (B) 14 days (C) 21 days (D) 28 days

Last Answer : Answer: Option D

Description : As compared to ordinary Portland cement, use of pozzolana cement (A) Reduces workability (B) Increases bleeding (C) Increases shrinkage (D) Increases strength

Last Answer : Answer: Option C

Description : The cement whose strength is a little lower than the ordinary cement during the first three months but attains afterwards the same strength, is known as (A) Low-heat Portland cement (B) Rapid hardening Portland cement (C) Portland blast slag cement (D) Portland pozzolana cement

Last Answer : Answer: Option A

Description : The compound of Portland cement which contributes to the strength after two to three years is (A) Tri-calcium silicate (B) Di-calcium silicate (C) Tri-calcium aluminate (D) Tetra-calcium alumino ferrite

Last Answer : Answer: Option B

Description : According to IS specifications, the compressive strength of ordinary Portland cement after three days should not be less than (A) 7 MPa (B) 11.5 MPa (C) 16 MPa (D) 21 MPa

Last Answer : Answer: Option C

Description : Which of the following cements is expected to have the highest compressive strength after 3 days (a) Ordinary Portland cement (b) Rapid hardening cement (c) High alumina cement (d) Sulphate resisting cement.

Last Answer : (c) High alumina cement

Description : Minimum compressive strength of cement required at the age of 3 days for ordinary Portland cement of grade 33 is [ A ] 1.15 N/mm2 [ B ] 11.5 N/mm2 [ C ] 2.10 N/mm2 [ D ] 21 N/mm2

Last Answer : [ B ] 11.5 N/mm2

Description : Vicat's apparatus is used for (A) Fineness test (B) Consistency test (C) Setting time test (D) Soundness test

Last Answer : (B) Consistency test

Description : The term TUGback is related to ( “When used in connection with a master Gutta Percha cone in endodontics)” : A. Tensile strength of the gutta percha B. Consistency of gutta percha C. Size of the cone D. Fit of the cone in the apical 1 or 2 mm E. Length of the cone

Last Answer : D. Fit of the cone in the apical 1 or 2 mm

Description : Pick out the wrong statement. (A) Dry process is used for the manufacture of cement, when the raw material is blast furnace slag (B) Portland cement is made employing wet process (C) Gypsum is added to Portland cement to lengthen its setting time (D) None of these

Last Answer : (D) None of these

Description : (3) preventing rapid setting of cement Explanation: Portland cement clinker is a hydraulic material which shall consist of at least two-thirds by mass of calcium silicates, the remainder consisting of ... mixed with water by way of a complex series of chemical reactions still only partly understood.

Last Answer : Milk is a colloidal system in which: (1) Water is dispersed in fat (2) Fat is dispersed in water (3) Fat and water are dispersed in each other (4) Fat is dissolved

Description : For testing compressive and tensile strength of cement, the cement mortar is made by mixing cement and standard sand in the proportions of (A) 1 : 2 (B) 1 : 3 (C) 1 : 4 (D) 1 : 6

Last Answer : Answer: Option B

Description : Le-chatelier apparatus is used for [ A ] Fineness test [ B ] Consistency test [ C ] Soundness test [ D ] Compressive strength test

Last Answer : [ C ] Soundness test

Description : Pick up the correct statement regarding low heat cement from the following: (A) It possesses less compressive strength (B) Its initial setting time is about one hour (C) Its final setting time is about 10 hours (D) All the above

Last Answer : Answer: Option D

Description : The gypsum is added to the cement for (a) Providing high strength to the cement (b) Controlling the initial setting time of cement. (c) Lowering the clinkering temp of cement (d) All the above.

Last Answer : (b) Controlling the initial setting time of cement.

Description : The presence of lime in cement (a) Make s the cement sound and provides strength to the cement. (b) Prolong the setting time (c) Causes unsoundness in cement (d) All the above

Last Answer : (a) Make s the cement sound and provides strength to the cement.

Description : Tricalcium aluminate (C3A) (A) Reacts fast with water (B) Generates less heat of hydration (C) Causes initial setting and early strength of cement (D) Does not contribute to develop ultimate strength

Last Answer : Answer: Option B

Description : The deleterious materials present in the aggregate (a) Prevent normal hydration of cement (b) Reduce the strength and durability of concrete. (c) Modify the setting action and cause efloresecence. (d) All of the above

Last Answer : (d) All of the above

Description : Pick up the correct statement from the following: (A) Plain cement concrete is equally strong in compression as well as in tension (B) Slump test is performed to check concrete strength (C ... D) Fineness modulus is the index number expressing the relative sizes of both coarse and fine aggregates

Last Answer : Option D

Description : If is the percentage of water required for normal consistency, water to be added for determination of initial setting time, is (A) 0.70 P (B) 0.75 P (C) 0.80 P (D) 0.85 p

Last Answer : Answer: Option D

Description : If 1500 g of water is required to have a cement paste 1875 g of normal consistency, the percentage of water is, (A) 20 % (B) 25 % (C) 30 % (D) 35 %

Last Answer : (B) 25 %

Description : The percentage of water for making a cement paste of normal consistency varies from (a) 15 to 25% (b) 25 to 35% (c) 35 to 50% (d) 50 to 60%

Last Answer : (b) 25 to 35%

Description : High copper amalgam lasts longer than low copper amalgam because of:**  A. Increased compressive strength  B. Increased corrosion resistance  C. High creep  D. Increased tensile strength  E. Decreased setting expansion 

Last Answer : A. Increased compressive strength 

Description : Pick up the correct statement from the following: (A) A soil having pH value more than 7 is an acidic soil (B) A soil having pH value less than 7 is an acidic soil (C) A soil ... more than 7 is an alkaline soil (D) A soil containing chemicals for the manufacture of Portland cement is preferred

Last Answer : Answer: Option B

Description : In ideal pavement is constructed with (A) Bricks (B) Hard soil (C) Portland cement concrete (D) Tar

Last Answer : Answer: Option C

Description : An ordinary Portland cement when tested for its fineness, should not leave any residue on I.S. sieve No. 9, more than (A) 5 % (B) 10 % (C) 15 % (D) 20 %

Last Answer : (B) 10 %

Description : Ordinary Portland cement is manufactured from (A) Lime stone and clay (B) Gypsum and lime (C) Pozzolana (D) Lime, pozzolana and clay

Last Answer : Answer: Option B